Council planning record

Approval of Condition 7 (Development and Construction Management Plan), 9 (ASHP's), 10 (Method Statement), 15 (CEMP), 19 (Construction Management Plan) and 20 (Construction Access Point) of R24/0103 (Construction of 108 dwellings)

Land North of Projects Drive, Rugby

Decision MadeReference: R25/0638Rugby Borough Council

Last published check: 4 Oct 2026, 09:25. Check the council record for more recent changes.

Application location

Land North of Projects Drive, Rugby

This record has no verified map location.

Application summary

Status
Decision Made
Application type
Conditions
Received
18 Jul 2025
Validated
29 Jul 2025
Determination deadline
17 Sept 2025
Local authority
Rugby Borough Council

Application overview

Approval of Condition 7 (Development and Construction Management Plan), 9 (ASHP's), 10 (Method Statement), 15 (CEMP), 19 (Construction Management Plan) and 20 (Construction Access Point) of R24/0103 (Construction of 108 dwellings)

Proposal details

Reference
R25/0638
Alternative references
PP-14188031
Ward
Newbold & Brownsover
Parish
Unparished
Agent
Mara Eagle
UPRN
100071499342

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 9 of 9

DocumentPublishedAction
Cond 7, 10, 15, 19, 20 Refuse Vehicle Tracking Rec'd 18/07/2025Condition Info / PlanNot publishedView
Cond 7, 10, 15, 19, 20 Fire Tender Vehicle Tracking Rec'd 18/07/2025Condition Info / PlanNot publishedView
Cond 9- Acoustics Assessment Rec'd 18/07/2025Condition Info / PlanNot publishedView
Cond 9 - Details of Heat Pump Rec'd 18/07/2025Condition Info / PlanNot publishedView
Application Form Redacted Rec'd 22/07/2025Application FormNot publishedView
Cond 7, 10, 15, 19, 20 - Construction Environmental Management Plan (CEMP) Rec'd 23/07/2025Superseded29 Jul 2025View
version 2 Cond 7, 10, 15, 19, 20 - Construction Environmental Management Plan (CEMP) Rec'd 09/10/2025Condition Info / Plan10 Oct 2025View
Approval of Conds 9 & 10 dated 16.12.25Decision Notice16 Dec 2025View
Approval of Conds 7, 15, 19 & 20 dated 30.01.2026Decision Notice30 Jan 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Press notice start date

    Published milestoneCouncil source
  5. Valid date

    Published milestoneCouncil source
  6. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Dispatch date

    Published milestoneCouncil source
  11. Decision date

    Published milestoneCouncil source
  12. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approval
Approval of Conds 9 & 10 dated 16.12.25 Approval of Conds 7, 15, 19 & 20 dated 30.01.2026
Planning conditions
  1. CONDITION 7: Demolition and Construction Management Plan Prior to the commencement of any works, a Demolition and Construction Management Plan shall be submitted in writing to, and approved by, the Local Planning Authority. This shall include details relating to: • the control of noise and vibration emissions from demolition and construction activities including groundworks and the formation of infrastructure including arrangements to monitor noise emissions from the development site during the demolition and construction phase • the control of dust including arrangements to monitor dust emissions from the development site during the demolition and construction phase • measures to reduce mud deposition offsite from vehicles leaving the site. • a piling risk assessment if such works are to take place. The development shall be carried out in compliance with the approved Demolition and Construction Method Statement. REASON: In the interests of residential amenity, to ensure the details are acceptable to the Local Planning Authority and to avoid significant adverse impacts.
  2. CONDITION 15: The development hereby permitted shall not commence until a Construction Environmental Management Plan has been submitted to and approved in writing by the Local Planning Authority. In discharging this condition the Local Planning Authority expect to see details concerning pre-commencement checks for protected species (badger, bats, breeding birds) and appropriate working practices and safeguards for retained habitats and for wildlife that are to be employed whilst works are taking place on site. The agreed Construction Environmental Management Plan shall thereafter be implemented in full. REASON: To ensure that protected species are not harmed by the development
  3. CONDITION 19: No construction shall be undertaken until a detailed Construction Management Plan is submitted to, and approved in writing by, both the Planning and Highway Authorities and which should contain details of: The routeing and timing (avoiding peak periods) of delivery and other construction traffic to/from the proposed development and the measures by which this is to be managed and monitored, including signage and information that will be provided to contractors and delivery companies. •Suitable areas for the parking of contractors and visitors, including details of the capacity of the on-site staff/visitor/contractor parking areas and confirmation of the assessment that this is sufficient to accommodate forecast demand and thereby ensure that no vehicles will park off site on the highway network. •Measures to prevent mud and debris on the public highway, including wheel washing facilities and the methods to be used to keep the public highway clear of any mud, debris and obstacles (in the event of spillage). •The swept path analysis of the expected largest type of delivery/construction vehicle when entering, leaving and turning within the site. This is needed to confirm that vehicles will enter and leave the site (from and to the public highway) safely and in a forward gear. •The management of the routing and timing of deliveries to and from the site such that large vehicles will not have to wait in the public highway carriageway to gain access to the site. •Suitable areas for the unloading and storage of materials off the public highway. The approved Plan shall be adhered to and implemented throughout the construction period strictly in accordance with the approved details. REASON: In the interests of highway safety.
  4. CONDITION 20: No groundworks, remediation or built construction shall be undertaken until a construction access point has been identified and submitted in writing for approval by the Local Planning Authority in consultation with the Highway Authority. REASON: In the interests of highway safety.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.