Council planning record

First Floor Rear Extension

46 WOOD LANE, SHILTON, COVENTRY, CV7 9LA

Decision MadeReference: R25/0488Rugby Borough Council

Last published check: 4 Oct 2026, 11:47. Check the council record for more recent changes.

Application location

46 WOOD LANE, SHILTON, COVENTRY, CV7 9LA

This record has no verified map location.

Application summary

Status
Decision Made
Application type
8 Weeks PA
Received
3 Jun 2025
Validated
17 Jul 2025
Determination deadline
10 Sept 2025
Local authority
Rugby Borough Council

Application overview

First Floor Rear Extension

Proposal details

Reference
R25/0488
Ward
Wolvey & Shilton
Parish
Shilton
Agent
Mr Richard Smith
UPRN
100071519986

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 13 of 13

DocumentPublishedAction
Existing Floor Plans & Elevations Rec'd 03/06/2025Existing Plans4 Jun 2025View
Proposed Floor Plan Rec'd 03/06/2025Proposed Plans4 Jun 2025View
Proposed Elevation Plans Rec'd 03/06/2025Proposed Plans4 Jun 2025View
Section Plan Rec'd 03/06/2025Sections4 Jun 2025View
Site Location Plan Rec'd 03/06/2025Site Location Plan4 Jun 2025View
Application Form Redacted Rec'd 03/06/2025Application Form4 Jun 2025View
Block Plan Rec'd 10/06/2025Block Plan10 Jun 2025View
Roof Plan Rec'd 10/06/2025Plans10 Jun 2025View
Sustainability Checklist Rec'd 10/06/2025Sustainability Checklist10 Jun 2025View
Bat Survey Rec'd 16/07/2025Ecology Report16 Jul 2025View
Updated Ecology reportEcology Report30 Sept 2025View
ApasTemplate_8144.pdfOfficer Report10 Oct 2025View
679682Decision_Approval_Planning_Permission_7952.pdfDecision Notice10 Oct 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Registration date

    Published milestoneCouncil source
  3. Press notice start date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Dispatch date

    Published milestoneCouncil source
  10. Decision date

    Published milestoneCouncil source
  11. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approval
679682Decision_Approval_Planning_Permission_7952.pdf
Planning conditions
  1. CONDITION: 1 The development to which this permission relates must not be begun later than the expiration of three years from the date of this permission. REASON: 1 To comply with Section 91 of the Town & Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act, 2004.
  2. CONDITION: 2 The development shall be carried out in accordance with the plans and documents detailed below: Application form Existing floor plans and elevations, drawing no. 46/02/01 Proposed floor plans, drawing no. 46/02/02 Proposed elevations, drawing no. 46/02/03 Site location plan, 46/02/05 Received by Council, 03/06/2025 Existing and proposed roof plan, drawing no. 46/02/06 Proposed block plan, drawing no. 46/02/07 Sustainability Checklist Received by Council 10/06/2025 REASON: 2 For the avoidance of doubt and to ensure that the details of the development are acceptable to the Local Planning Authority.
  3. CONDITION: 3 The facing materials to be used on the external walls and roof shall be of the same type, colour and texture as those used on the existing building. REASON: 3 To ensure a satisfactory external appearance.
  4. CONDITION: The window to be formed in the west elevation of the proposed first floor extension shall not be glazed or reglazed other than with obscure glass. REASON: To protect the residential amenity of neighbouring properties.
  5. CONDITION: 5 The development hereby permitted shall not commence until a detailed schedule of bat mitigation measures (to include timing of works, ecologist supervision of destructive works, toolbox talk, procedure if bats are found, including provision of a bat box during works, replacement roost details, including feature/box type, location and timetable for installation, monitoring and further survey if necessary) has been submitted to and approved by the Local Planning Authority. Such approved mitigation measures shall thereafter be implemented in full and maintained in perpetuity. REASON: 5 To ensure protected, important and priority species and their habitats are not harmed by the development.
  6. INFORMATIVE: 1 Buildings of all ages and trees with suitable features (i.e. rot-holes, cracks, fissures) are frequently used by roosting bats. Bats and their ‘roost’ sites are fully protected under the Wildlife and Countryside Act 1981 (as amended) and the Conservation of Habitats and Species Regulations 2017 (as amended) making them a European Protected Species. It is a criminal offence to disturb, obstruct or destroy a bat ‘roost’, even if the roost is only occasionally used. Where a bat ‘roost’ is present a licence may be necessary to carry out any works. Further information about species licensing and legislation can be obtained from the Species Licensing Service on 0208 261089. The applicant is advised that to ensure no bats are endangered during destructive works, the roof tiles should be removed carefully by hand. If evidence of bats is found during works, work should stop immediately and Natural England must be contacted on 02080 261089 for advice on the best way to proceed. Work should avoid disturbance to nesting birds. Birds can nest in many places including buildings, trees, shrubs dense ivy, and bramble/rose scrub. Nesting birds are protected under the Wildlife and Countryside Act 1981 (as amended). The main nesting season, lasts approximately from March to September inclusive, so work should ideally take place outside these dates if at all possible. N.B birds can nest at any time, and the site should ideally be checked by a suitably qualified ecologist for their presence immediately before work starts, especially if during the breeding season.
  7. INFORMATIVE: 2 This permission does not convey any legal or civil right to undertake works that affect land or premises outside of the applicant's control. Care should be taken upon commencement and during the course of building operations to ensure that no part of the development, including the foundations, eaves and roof overhang will encroach on, under or over adjoining land without the consent of the adjoining landowner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.