Council planning record

Outline application for: Residential development of up to 350 Dwellings (Use Class C3); provision of open space, including means of access into the site (not internal roads) and associated works, with all other matters (relating to appearance, landscaping, scale and layout) reserved.

Land North Of Station Farm Cottage, London Road, Dunchurch

Consultation Carried OutReference: R22/0853Rugby Borough Council

Last published check: 2 Oct 2026, 11:04. Check the council record for more recent changes.

Application location

Land North Of Station Farm Cottage, London Road, Dunchurch

This record has no verified map location.

Application summary

Status
Consultation Carried Out
Application type
App with EIA
Received
16 Aug 2022
Validated
8 Dec 2025
Determination deadline
30 Mar 2026
Local authority
Rugby Borough Council

Application overview

Outline application for: Residential development of up to 350 Dwellings (Use Class C3); provision of open space, including means of access into the site (not internal roads) and associated works, with all other matters (relating to appearance, landscaping, scale and layout) reserved.

Proposal details

Reference
R22/0853
Alternative references
PP-11122781
Ward
Dunsmore
Parish
Dunchurch, Thurlaston
Agent
Louise Steele
UPRN
10094756106

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 139 of 139

DocumentPublishedAction
Lighting Assessment July 2022 - 16/08/22SupersededNot publishedView
Cover letter 16/8/22Application LetterNot publishedView
ES Appendix G.1 Archaeological and Heritage_Part 4 - 16/8/22Archaeology ReportNot publishedView
ES Appendix G.1 Archaeological and Heritage_Part 3 - 16/8/22Archaeology ReportNot publishedView
ES Appendix G.1 Archaeological and Heritage_Part 2 Figures 7 to 15 - 16/8/22Archaeology ReportNot publishedView
ES Appendix G.1 Archaeological and Heritage_Part 1 - 16/8/22Archaeology ReportNot publishedView
ES Appendix E3 Ground Condition Figures 10.1 - 16/8/22Environmental Statement (part)Not publishedView
ES Appendix E2 Symmetry Park, Rugby Ground Conditions Desk Study - 16/8/22Environmental Statement (part)Not publishedView
ES Appendix E1 Ground Condition Assessment (Land Contamination & Ground Stability) - 16/8/22Environmental Statement (part)Not publishedView
ES Appendix D.5 Air Quality Figures 9.1, 9.2, 9.3, 9.4 & 9.5 - 16/8/22Air Quality ReportNot publishedView
ES Appendix D.4 Site Suitability (Sensitive Receptors) - 16/8/22Air Quality ReportNot publishedView
ES Appendix D.3 Predicted Concentrations - 16/8/22Air Quality ReportNot publishedView
ES Appendix D.2 Model (Traffic) - 16/8/22Highway plans/informationNot publishedView
ES Appendix D1 Policy and Legislation - 16/8/22Environmental Statement (part)Not publishedView
ES Appendix C5 Construction Plant and Equipment Source Sound Levels - 16/8/22Environmental Statement (part)Not publishedView
ES Appendix C4 Sound Time History Graphs - 16/8/22Environmental Statement (part)Not publishedView
ES Appendix C3 Environmental Sound Survey Instrumentation - 16/8/22Environmental Statement (part)Not publishedView
ES Appendix C.2 Traffic Data - 16/8/22Highway plans/informationNot publishedView
ES Appendix C1 Noise Figures 8.1, 8.2, 8.3, 8.4 & 8.5 - 16/8/22Environmental Statement (part)Not publishedView
ES Appendix B.2 Transport Figures 7.1, 7.2 & 7.3 - 16/08/2022Highway plans/informationNot publishedView
ES Appendix B1 - Transport Assessment Part 4 Appendix F cont'd - 16/8/22Highway plans/informationNot publishedView
ES Appendix B1 - Transport Assessment Part 3 Appendices D, E & F - 16/8/22Highway plans/informationNot publishedView
ES Appendix B1 - Transport Assessment Part 2 Appendix C - 16/8/22Highway plans/informationNot publishedView
ES Appendix B1 - Transport Assessment Part 1 - 16/8/22Highway plans/informationNot publishedView
ES Appendix A8 - Agricultural Land Classification - 16/8/22Environmental Statement (part)Not publishedView
ES Appendix A7 EIA Scoping Opinion - 16/8/22Environmental Statement (part)Not publishedView
ES Appendix A6 EIA Scoping Report - 16/8/22Environmental Statement (part)Not publishedView
ES Appendix A4 - EIA Team Expertise and Qualifications - 16/8/22Environmental Statement (part)Not publishedView
ES Appendix A3 - Access to Cawston Farm Phase II - 16/8/22SupersededNot publishedView
Parameter plans 16/8/22SupersededNot publishedView
ES Appendix A1 - Site Location Plan - 16/8/22Environmental Statement (part)Not publishedView
ES Appendix A5 - Committed Development - 16/8/22Environmental Statement (part)Not publishedView
ES Volume 2: Contents (List of Appendices) - 16/8/22Environmental Statement (part)Not publishedView
ES Appendix I.2 Biodiversity Impact Assessment - 16/8/22SupersededNot publishedView
ES Appendix I.1 Ecological Baseline - 16/8/22SupersededNot publishedView
ES Appendix H.5 Landscape Strategy - 16/8/22SupersededNot publishedView
ES Appendix H.4 Arboricultural Impact Assessment - 16/8/22Tree Report/planNot publishedView
ES Appendix H3 Cumulative Effects - 16/8/22Environmental Statement (part)Not publishedView
ES Appendix H2 Table of Effects: Visual Amenity - 16/8/22Environmental Statement (part)Not publishedView
ES Appendix H1 Landscape and Visual Impact Assessment Baseline July 2022 - 16/8/22Environmental Statement (part)Not publishedView
ES Appendix G.1 Archaeological and Heritage_Part 6 - 16/8/22Archaeology ReportNot publishedView
ES Appendix G.1 Archaeological and Heritage_Part 5 - 16/8/22Archaeology ReportNot publishedView
ES Non technical summary - 16/08/22SupersededNot publishedView
ES Volume 1 Main Report - 16/8/22Environmental Statement (part)Not publishedView
Statement of Community Involvement August 2022 - 16/08/22Supporting InformationNot publishedView
Agricultural Land Quality and Considerations July 2022 - 16/08/22Supporting InformationNot publishedView
HIA Screening - 16/8/22SupersededNot publishedView
Outline Energy Statement July 2022 - 16/08/22Supporting InformationNot publishedView
Sustainability Statement August 2022 - 16/08/22Supporting InformationNot publishedView
Access to Cawston Farm Phase II - 16/08/22SupersededNot publishedView
Buildings heights and densities - 16/08/22SupersededNot publishedView
Green Infrastructure Plan from ES Appendix A.2- 16/08/2022SupersededNot publishedView
Land use and access plan - 16/08/22SupersededNot publishedView
Received on 22/8/22Site Location PlanNot publishedView
Design and Access Statement - 16/8/22Design and Access StatementNot publishedView
Planning Statement rec'd 16/08/2022Planning StatementNot publishedView
Illustrative Layout from ES Appendix A.2 - 16/08/22Superseded26 Aug 2022View
Rec'd 16/8/22Application Form30 Aug 2022View
Constraints/Opportunities plan from D&ADesign and Access Statement2 Sept 2022View
Rec'd 26/9/22 - Superseded drawings: Land use & access 07G, Building Heights & Densities 09Amended Plans29 Sept 2022View
Buildings heights and densities - 26/09/22Superseded29 Sept 2022View
ES Non Technical Summary - 26/9/22Environmental Statement (part)29 Sept 2022View
Health Impact Assessment Screening Report - 26/9/22Supporting Information29 Sept 2022View
Cawston P1 Access Results - 06/10/22Highway plans/information11 Oct 2022View
Local Plan Network Diagram - 06/10/22Highway plans/information11 Oct 2022View
BNG Metric Aug 2022Superseded11 Oct 2022View
BNG Metric - 29/10/25Superseded19 Nov 2025View
Amended Plans Rec'd 29/10/25 Land use and access and Building Heights & DensitiesProposed Plans19 Nov 2025View
Design and Access Statement Addendum - 29/10/25Design and Access Statement20 Nov 2025View
ES Addendum Main Text - 29/10/25Environmental Statement Addendum (part)20 Nov 2025View
ES Addendum Appendix 4.1 Transport and Access Policy - 29/10/25Environmental Statement Addendum (part)20 Nov 2025View
ES Addendum Appendix 1.1 Redline and Updated Parameter Plans - 29/10/25Environmental Statement Addendum (part)20 Nov 2025View
ES Addendum Appendix 11.1 Update Ecological Baseline received on 29/10/25Ecology Report20 Nov 2025View
ES Addendum Appendix 11.2 Biodiversity Impact Assessment received on 29/10/25Ecology Report20 Nov 2025View
ES Addendum Appendix 10.2 Addendum Arboricultural Note received on 29/10/25Tree Report/plan20 Nov 2025View
ES Addendum Appendix 10.3 Landscape Strategy received on 29/10/25Landscaping20 Nov 2025View
ES Addendum Appendix 9.1 Archaeological Evaluation Report received on 29/10/25Archaeology Report20 Nov 2025View
ES Addendum Appendix 9.2 Archaeology Consultation received on 29/10/25Archaeology Report20 Nov 2025View
ES Addendum Appendix 4.1 Transport & Access Policy received on 29/10/25Highway plans/information20 Nov 2025View
ES Addendum Appendix 4.2 Symmetry Park Phase 2 Assessment – Transport received on 29/10/25Highway plans/information20 Nov 2025View
Appendix 6.1 Symmetry Park Phase 2 Assessment – Air Quality 29/10/2025Air Quality Report20 Nov 2025View
ES Addendum Appendix 8.1 Flood Risk Policy and Guidance received on 29/10/25Flood Risk Assessment20 Nov 2025View
ES Addendum Appendix 10.1 LVIA Baseline_Part 1 received on 29/10/25Environmental Statement Addendum (part)20 Nov 2025View
ES Addendum Appendix 10.1 LVIA Baseline_Part 2 received on 29/10/25Environmental Statement Addendum (part)20 Nov 2025View
ES Addendum Appendix 10.2 Addendum Arboricultural Note received on 29/10/25Environmental Statement Addendum (part)20 Nov 2025View
ES Addendum Appendix 10.3 Landscape Strategy received on 29/10/25Environmental Statement Addendum (part)20 Nov 2025View
ES Addendum Appendix 11.1 Update Ecological Baseline received on 29/10/25Environmental Statement Addendum (part)20 Nov 2025View
ES Addendum Appendix 11.2 Biodiversity Impact Assessment received on 29/10/25Environmental Statement Addendum (part)20 Nov 2025View
ES Addendum Appendix 4.2 Symmetry Park Phase 2 Assessment – Transport received on 29/10/25Environmental Statement Addendum (part)20 Nov 2025View
ES Addendum Appendix 5.1 Symmetry Park Phase 2 Assessment - Noise and Vibration received on 29/10/25Environmental Statement Addendum (part)20 Nov 2025View
ES Addendum Appendix 6.1 Symmetry Park Phase 2 Assessment - Air Quality received on 29/10/25Environmental Statement Addendum (part)20 Nov 2025View
ES Addendum Appendix 8.1 Flood Risk Policy and Guidance received on 29/10/25Environmental Statement Addendum (part)20 Nov 2025View
ES Addendum Appendix 9.1 Archaeological Evaluation Report received on 29/10/25Environmental Statement Addendum (part)20 Nov 2025View
ES Addendum Appendix 9.2 Archaeology Consultation received on 29/10/25Environmental Statement Addendum (part)20 Nov 2025View
ES Addendum Appendix 10.1 LVIA Baseline_Part1 received on 29/10/25Landscaping20 Nov 2025View
ES Addendum Appendix 10.1 LVIA Baseline_Part2 received on 29/10/25Landscaping20 Nov 2025View
ES Appendix H.1 Landscape and Visual Impact Assessment Baseline July 2022 - 16/8/22Landscaping20 Nov 2025View
ES Appendix A2 Parameter Plans - 16/08/2022Superseded20 Nov 2025View
ES Appendix A3 - Access Layout - 16/08/2022Environmental Statement (part)20 Nov 2025View
ES Appendix C2 - Traffic Data - 16/08/2022Environmental Statement (part)20 Nov 2025View
ES Appendix D2 Model - 16/08/2022Environmental Statement (part)20 Nov 2025View
ES Appendix D3 Predicted Concentrations - 16/08/2022Environmental Statement (part)20 Nov 2025View
ES Appendix D4 Suitability - 16/08/2022Environmental Statement (part)20 Nov 2025View
ES Appendix D5 - Air Quality Figures - 16/08/2022Environmental Statement (part)20 Nov 2025View
ES Appendix F1 - Flood Risk Assessment Part 1 - 16/08/22Superseded20 Nov 2025View
ES Appendix F1 - Flood Risk Assessment Part 2 - 16/08/22Superseded20 Nov 2025View
ES Appendix F1 - Flood Risk Assessment Part 3 - 16/08/22Superseded20 Nov 2025View
ES Appendix F1 - Flood Risk Assessment Part 4 - 16/08/22Superseded20 Nov 2025View
ES Appendix G1 Archaeological and Heritage Part 1 - 16/08/22Environmental Statement (part)20 Nov 2025View
ES Appendix G1 Archaeological and Heritage Part 2 - 16/08/22Environmental Statement (part)20 Nov 2025View
ES Appendix G1 Archaeological and Heritage Part 3 - 16/08/22Environmental Statement (part)20 Nov 2025View
ES Appendix G1 Archaeological and Heritage Part 4 - 16/08/22Environmental Statement (part)20 Nov 2025View
ES Appendix G1 Archaeological and Heritage Part 5 - 16/08/22Environmental Statement (part)20 Nov 2025View
ES Appendix G1 Archaeological and Heritage Part 6 - 16/08/22Environmental Statement (part)20 Nov 2025View
ES Appendix B1 - Transport Assessment Part 1 August 2022 - 16/08/22Environmental Statement (part)20 Nov 2025View
ES Appendix B1 - Transport Assessment Part 2 August 2022 - 16/08/22Environmental Statement (part)20 Nov 2025View
ES Appendix B1 - Transport Assessment Part 3 August 2022 - 16/08/22Environmental Statement (part)20 Nov 2025View
ES Appendix B1 - Transport Assessment Part 4 August 2022 - 16/08/22Environmental Statement (part)20 Nov 2025View
ES Appendix B2 Transport Figures 7.1, 7.2 & 7.3 - 16/08/22Environmental Statement (part)20 Nov 2025View
ES Appendix H4 Arboricultural Impact Assessment - 16/8/22Environmental Statement (part)20 Nov 2025View
ES Appendix H5 - Landscape Strategy - 16/8/22Environmental Statement (part)20 Nov 2025View
ES Appendix I1 Ecological Baseline - 16/8/22Environmental Statement (part)20 Nov 2025View
ES Appendix I2: Biodiversity Impact Assessment - 16/8/22Environmental Statement (part)20 Nov 2025View
Access to Cawston Farm Phase II received on 29/10/2025Highway plans/information20 Nov 2025View
Planning Statement Addendum rec'd 29/10/2025Planning Statement20 Nov 2025View
Lighting Assessment October 2025 - 29/10/25Supporting Information20 Nov 2025View
Sustainability Checklist - 03/04/2023Sustainability Checklist20 Nov 2025View
Illustrative Layout Plan - 29/10/2025Proposed Plans20 Nov 2025View
Flood Risk Assessment Strategy October 2025 received on 29/10/205Flood Risk Assessment20 Nov 2025View
WCC Fire & Rescue Water Officer response rec'd 16/12/25 - no objectionConsultee No Objection16 Dec 2025View
WCC Fire & Rescue (fire protection) response rec'd 16/12/25 - no objectionConsultee No Objection16 Dec 2025View
Revised BNG Metric rec'd 09/03/2026Ecology Plan/Drawing12 Mar 2026View
Supporting drawing for ecology 332611199_STN_HGN_XX_DR_C_0110 rec'd 09/03/2026Ecology Plan/Drawing12 Mar 2026View
Letter from EDP (redacted) responding to Ecology comments rec'd 09/03/2026Ecology Plan/Drawing12 Mar 2026View
Technical Note March 26 responding to LLFA comments - 30/03/2026Drainage31 Mar 2026View
Topographical Survey - 01/04/26Plan2 Apr 2026View
Phase 2 Channel Diversion Modelling June 2022 rec'd 01/04/2026Drainage2 Apr 2026View
Potsford Dam Link Channel Diversion Modelling July 2025 - 01/04/2026Drainage2 Apr 2026View
Amended Opportunites and Constraints Plan with correct PRoWs labelled rec'd 20/05/2026Proposed Plans20 May 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Extension date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Consultation Carried Out
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.