Details required for Condition 13 (Nature Conservation) of planning permission 25/03146/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to vary Condition 1 (Approved Drawings) of planning permission 21/01725/FUL (Erection of double storey rear extension (following demolition of existing extension), raising of roof ridge with associated loft conversion and addition of 3 no. rooflights to front roofslope, with new end gables, to convert existing single family dwellinghouse into 3 no. self-contained flats (2 x three-bedroom and 1 x one bedroom) with associated parking, refuse/recycling storage and cycle parking facilities.) to allow changes in rear dormer, side fenestration, landscaping details and increase in footprint of rear extension.)
Details required for Condition 13 (Nature Conservation) of planning permission 25/03146/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to vary Condition 1 (Approved Drawings) of planning permission 21/01725/FUL (Erection of double storey rear extension (following demolition of existing extension), raising of roof ridge with associated loft conversion and addition of 3 no. rooflights to front roofslope, with new end gables, to convert existing single family dwellinghouse into 3 no. self-contained flats (2 x three-bedroom and 1 x one bedroom) with associated parking, refuse/recycling storage and cycle parking facilities.) to allow changes in rear dormer, side fenestration, landscaping details and increase in footprint of rear extension.)
Reference
26/01976/CLC
Alternative references
PP-15192503
Ward
Kingston Town
Parish
Kingston And North Kingston
Agent
Mr Mark Maurizi
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.