ApprovedCouncil status: Granted

Details required for Condition 10 (Photo and Installation of Sustainable Drainage Scheme) of planning permission 26/00923/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to vary Conditions 10 (sustainable drainage scheme) and 25 (sustainability and energy conservation) for Application Reference Number: 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.) dated 03/12/2024. Variation of wording of Conditions 10 and 25 to reflect the phased nature of the construction programme.)

Coombe Boys School College Gardens New Malden KT3 6NU

Royal Borough of Kingston upon ThamesReference 26/01929/CLCDetails Reserved by Condition

Last published check: 10 Nov 2026, 11:11. Check the council record for more recent changes.

Status and dates

Last published check: 10 Nov 2026, 11:11 (UK)

  1. DoneReceived4 Sept 2026
  2. DoneValidated5 Oct 2026
  3. ClosedConsultationEnded 6 Nov 2026
  4. Date set by councilTarget decision date30 Nov 2026
  5. DecidedApplication Granted9 Nov 2026

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (10)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Decision Made Date

    Published milestoneCouncil source
  7. Determination Deadline

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Details Reserved by Condition
Ward
Motspur Park & Old Malden East
Parish
New And Old Malden
Documents
8 published

Proposal

Details required for Condition 10 (Photo and Installation of Sustainable Drainage Scheme) of planning permission 26/00923/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to vary Conditions 10 (sustainable drainage scheme) and 25 (sustainability and energy conservation) for Application Reference Number: 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.) dated 03/12/2024. Variation of wording of Conditions 10 and 25 to reflect the phased nature of the construction programme.)

Reference
26/01929/CLC
Alternative references
PP-15125769
Ward
Motspur Park & Old Malden East
Parish
New And Old Malden
Agent
Mr Kuba Sala

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • SuDS Drainage Operations and Maintenance ManualSupporting Documents4 Sept 2026View
  • Photo-Attenuation Tank CbsSupporting Documents4 Sept 2026View
  • Sub Contract AgreementSupporting Documents4 Sept 2026View
  • Photo- Hydrobrake Photo Evidence 3Supporting Documents4 Sept 2026View
  • Cover LetterSupporting Documents4 Sept 2026View
  • Sustainable Drainage SchemeSupporting Documents4 Sept 2026View
  • Photo-Hydrobrake Photo Evidence.1Supporting Documents4 Sept 2026View
  • Photo-Hydrobrake Photo Evidence.2Supporting Documents4 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Application Granted
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.