Details required for Condition 10 (Photo and Installation of Sustainable Drainage Scheme) of planning permission 26/00923/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to vary Conditions 10 (sustainable drainage scheme) and 25 (sustainability and energy conservation) for Application Reference Number: 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.) dated 03/12/2024. Variation of wording of Conditions 10 and 25 to reflect the phased nature of the construction programme.)
Coombe Boys School College Gardens New Malden KT3 6NU
Details required for Condition 10 (Photo and Installation of Sustainable Drainage Scheme) of planning permission 26/00923/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to vary Conditions 10 (sustainable drainage scheme) and 25 (sustainability and energy conservation) for Application Reference Number: 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.) dated 03/12/2024. Variation of wording of Conditions 10 and 25 to reflect the phased nature of the construction programme.)
Reference
26/01929/CLC
Alternative references
PP-15125769
Ward
Motspur Park & Old Malden East
Parish
New And Old Malden
Agent
Mr Kuba Sala
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.