Council planning record

Demolition of existing Lever House building and the construction of two buildings up to 18 storeys in height to accommodate co-living (Sui Generis) accommodation, co-working floorspace and ancillary cafe, and affordable housing (Use Class C3), associated internal and external amenity space, public realm, play space, hard and soft landscaping, cycle parking and other associated works.

Lever House 3 St James Road Kingston Upon Thames KT1 2BA

Pending ConsiderationReference: 26/01505/FULRoyal Borough of Kingston upon Thames

Last published check: 28 Sept 2026, 15:54. Check the council record for more recent changes.

Application location

Lever House 3 St James Road Kingston Upon Thames KT1 2BA

This record has no verified map location.

View council map

Application summary

Status
Pending Consideration
Application type
Full Application
Received
8 Jul 2026
Validated
3 Aug 2026
Determination deadline
23 Nov 2026
Local authority
Royal Borough of Kingston upon Thames

Application overview

Demolition of existing Lever House building and the construction of two buildings up to 18 storeys in height to accommodate co-living (Sui Generis) accommodation, co-working floorspace and ancillary cafe, and affordable housing (Use Class C3), associated internal and external amenity space, public realm, play space, hard and soft landscaping, cycle parking and other associated works.

Proposal details

Reference
26/01505/FUL
Alternative references
PP-14825793
Ward
Kingston Town
Parish
Kingston And North Kingston
Agent
Miss Annie Johnson

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 150 of 150

DocumentPublishedAction
Existing Ground Floor PlanDrawing · PDF7 Sept 2026View
Existing 6th Floor PlanDrawing · PDF7 Sept 2026View
Existing 7th Floor PlanDrawing · PDF7 Sept 2026View
Existing Roof PlanDrawing · PDF7 Sept 2026View
Existing North ElevationDrawing · PDF7 Sept 2026View
Existing East ElevationDrawing · PDF7 Sept 2026View
Existing South ElevationDrawing · PDF7 Sept 2026View
Existing West ElevationDrawing · PDF7 Sept 2026View
Existing Streetscape Elevation EastDrawing · PDF7 Sept 2026View
Proposed Streetscape Elevation EastDrawing · PDF7 Sept 2026View
Proposed Streetscape Elevation WestDrawing · PDF7 Sept 2026View
Existing Streetscape Elevation WestDrawing · PDF7 Sept 2026View
Design Review Meeting 1Supporting Documents · PDF26 Aug 2026View
Design Review Meeting 2Supporting Documents · PDF26 Aug 2026View
Design Review Meeting 3Supporting Documents · PDF26 Aug 2026View
Proposed Block PlanDrawing · PDF3 Aug 2026View
Environmental Statement Appendix 4.1 Phasing PlanSupporting Documents · PDF3 Aug 2026View
Environmental Statement Appendix 3.1 Detailed Drawings - Part 1Supporting Documents · PDF3 Aug 2026View
River Restoration ModellingSupporting Documents · PDF3 Aug 2026View
Sequential TestSupporting Documents · PDF3 Aug 2026View
Flood Risk Assessment Part 3 of 3Supporting Documents · PDF3 Aug 2026View
Flood Risk Assessment Part 2 of 3Supporting Documents · PDF3 Aug 2026View
Flood Risk Assessment Part 1 of 3Supporting Documents · PDF3 Aug 2026View
BNG MetricSupporting Documents3 Aug 2026View
Biodiversity ChecklistSupporting Documents · PDF3 Aug 2026View
Environmental Statement Non-Technical SummarySupporting Documents · PDF3 Aug 2026View
Schedule of Application Documents (Updated 31 July 2026)Supporting Documents · PDF3 Aug 2026View
Schedule of Application DocumentationSupporting Documents · PDF21 Jul 2026View
Design and Access Statement Part 1Supporting Documents · PDF21 Jul 2026View
Design and Access Statement Part 2Supporting Documents · PDF21 Jul 2026View
Design and Access Statement Part 3Supporting Documents · PDF21 Jul 2026View
Design and Access Statement Part 4Supporting Documents · PDF21 Jul 2026View
Design and Access Statement Part 5Supporting Documents · PDF21 Jul 2026View
Design and Access Statement Part 6Supporting Documents · PDF21 Jul 2026View
Design and Access Statement Part 7Supporting Documents · PDF21 Jul 2026View
Design and Access Statement Part 8Supporting Documents · PDF21 Jul 2026View
Design and Access Statement Part 9Supporting Documents · PDF21 Jul 2026View
Landscape Management and Maintenance ReportSupporting Documents · PDF21 Jul 2026View
Landscape StatementSupporting Documents · PDF21 Jul 2026View
Existing Site PlanDrawing · PDF21 Jul 2026View
Proposed Basement PlanDrawing · PDF21 Jul 2026View
Proposed Ground Floor Plan��Drawing · PDF21 Jul 2026View
Proposed Mezzanine Floor PlanDrawing · PDF21 Jul 2026View
Proposed First Floor PlanDrawing · PDF21 Jul 2026View
Proposed Second - Fourth Floor PlanDrawing · PDF21 Jul 2026View
Proposed Fifth - Seventh Floor PlanDrawing · PDF21 Jul 2026View
Proposed Eighth - Fifteenth Floor PlanDrawing · PDF21 Jul 2026View
Proposed Sixteenth Floor PlanDrawing · PDF21 Jul 2026View
Proposed Seventeenth Floor PlanDrawing · PDF21 Jul 2026View
Proposed Roof PlanDrawing · PDF21 Jul 2026View
Proposed Phasing PlanDrawing · PDF21 Jul 2026View
Proposed Affordable Building - North ElevationDrawing · PDF21 Jul 2026View
Proposed Affordable Building - East ElevationDrawing · PDF21 Jul 2026View
Proposed Affordable Building - South ElevationDrawing · PDF21 Jul 2026View
Proposed Affordable Building - West ElevationDrawing · PDF21 Jul 2026View
Proposed Co-Living Building - North ElevationDrawing · PDF21 Jul 2026View
Proposed Co-Living Building - East ElevationDrawing · PDF21 Jul 2026View
Proposed Co-Living Building - South ElevationDrawing · PDF21 Jul 2026View
Proposed Co-Living Building - West ElevationDrawing · PDF21 Jul 2026View
Application Form (No personal data)Application Form · PDF8 Jul 2026View
Schedule of Application DocumentsSupporting Documents · PDF8 Jul 2026View
Covering LetterSupporting Documents · PDF8 Jul 2026View
Schedule of Application DrawingsSupporting Documents · PDF8 Jul 2026View
Planning StatementSupporting Documents · PDF8 Jul 2026View
Affordable Housing StatementSupporting Documents · PDF8 Jul 2026View
Townscape and Visual Impact Assessment Part 1 of 3Supporting Documents · PDF8 Jul 2026View
Townscape and Visual Impact Assessment Part 3 of 3Supporting Documents · PDF8 Jul 2026View
Heritage Assessment Part 1 of 3Supporting Documents · PDF8 Jul 2026View
Heritage Assessment Part 2 of 3Supporting Documents · PDF8 Jul 2026View
Heritage Assessment Part 3 of 3Supporting Documents · PDF8 Jul 2026View
Co-Living Needs AssessmentSupporting Documents · PDF8 Jul 2026View
Preliminary Ecological Appraisal and BNG ReportSupporting Documents · PDF8 Jul 2026View
Overheating ReportSupporting Documents · PDF8 Jul 2026View
HRA Stage One (Screening) ReportSupporting Documents · PDF8 Jul 2026View
River Condition AssessmentSupporting Documents · PDF8 Jul 2026View
Archaeological Desk Based AssessmentSupporting Documents · PDF8 Jul 2026View
Townscape and Visual Impact Assessment Part 2 of 3Supporting Documents · PDF8 Jul 2026View
Energy StatementSupporting Documents · PDF8 Jul 2026View
Sustainability StatementSupporting Documents · PDF8 Jul 2026View
Site Location PlanDrawing · PDF8 Jul 2026View
GLA Carbon Emissions Reporting SpreadsheetSupporting Documents · PDF8 Jul 2026View
BREEAM Pre-AssessmentSupporting Documents · PDF8 Jul 2026View
Circular Economy ReportSupporting Documents · PDF8 Jul 2026View
GLA Whole Life-Cycle Carbon Assessment SpreadsheetSupporting Documents · PDF8 Jul 2026View
Whole Life-Cycle Carbon AssessmentSupporting Documents · PDF8 Jul 2026View
Daylight, Sunlight and Overshadowing Report Part 1Supporting Documents · PDF8 Jul 2026View
Daylight, Sunlight and Overshadowing Report Part 2Supporting Documents · PDF8 Jul 2026View
Daylight, Sunlight and Overshadowing Report Part 3Supporting Documents · PDF8 Jul 2026View
Environmental Noise Survey and Acoustic Design Statement ReportSupporting Documents · PDF8 Jul 2026View
Air Quality AssessmentSupporting Documents · PDF8 Jul 2026View
External Lighting AssessmentSupporting Documents · PDF8 Jul 2026View
Wind Microclimate Study Part 1 of 3Supporting Documents · PDF8 Jul 2026View
Wind Microclimate Study Part 2 of 3Supporting Documents · PDF8 Jul 2026View
Wind Microclimate Study Part 3 of 3Supporting Documents · PDF8 Jul 2026View
Outline Residential Travel PlanSupporting Documents · PDF8 Jul 2026View
Outline Construction Logistics PlanSupporting Documents · PDF8 Jul 2026View
Construction Environmental Management PlanSupporting Documents · PDF8 Jul 2026View
Delivery and Servicing Management PlanSupporting Documents · PDF8 Jul 2026View
Operational Waste Management StrategySupporting Documents · PDF8 Jul 2026View
Arboricultural Impact Assessment and Outline Method StatementSupporting Documents · PDF8 Jul 2026View
Statement of Community InvolvementSupporting Documents · PDF8 Jul 2026View
Health Impact AssessmentSupporting Documents · PDF8 Jul 2026View
Utilities StatementSupporting Documents · PDF8 Jul 2026View
Fire StatementSupporting Documents · PDF8 Jul 2026View
Phase 1 Land Contamination Assessment Part 1 of 4Supporting Documents · PDF8 Jul 2026View
Phase 1 Land Contamination Assessment Part 2 of 4Supporting Documents · PDF8 Jul 2026View
Phase 1 Land Contamination Assessment Part 3 of 4Supporting Documents · PDF8 Jul 2026View
Phase 1 Land Contamination Assessment Part 4 of 4Supporting Documents · PDF8 Jul 2026View
Co-Living Operator Management PlanSupporting Documents · PDF8 Jul 2026View
Water Consumption StatementSupporting Documents · PDF8 Jul 2026View
Basement Impact AssessmentSupporting Documents · PDF8 Jul 2026View
Area ScheduleSupporting Documents · PDF8 Jul 2026View
Environmental Statement: Volume 1Supporting Documents · PDF8 Jul 2026View
Environmental Statement: Volume 2 - Technical Figures and Appendices Cover SheetSupporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 1.1 Site Location PlanSupporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 1.2 Statement of ExpertiseSupporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 10.1 Wind Microclimate Technical StudySupporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 10.2 Wind Microclimate Assessment Results - Part1Supporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 10.2 Wind Microclimate Assessment Results - Part2Supporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 10.2 Wind Microclimate Assessment Results - Part3Supporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 10.2 Wind Microclimate Assessment Results - Part4Supporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 10.2 Wind Microclimate Assessment Results - Part5Supporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 10.2 Wind Microclimate Assessment Results - Part6Supporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 11.1 Whole Life Carbon AssessmentSupporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 11.2 Climate Change Risk AssessmentSupporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 3.1 Detailed Drawings - Part2Supporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 3.1 Detailed Drawings - Part3Supporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 3.1 Detailed Drawings - Part4Supporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 3.1 Detailed Drawings - Part5Supporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 3.1 Detailed Drawings - Part6Supporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 5.1 EIA Scoping Report - Part1Supporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 8.4 Built Heritage Maps and Views - Part1Supporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 5.1 EIA Scoping Report - Part2Supporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 5.1 EIA Scoping Report - Part3Supporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 5.2 EIA Scoping OpinionSupporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 5.3 Existing and Approved DevelopmentsSupporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 7.1 TVIA - Part1Supporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 7.1 TVIA - Part2Supporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 7.1 TVIA - Part3Supporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 8.2 Built Heritage Historic MapsSupporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 8.3 Built Heritage ValueSupporting Documents · PDF8 Jul 2026View
Healthy Streets Transport AssessmentSupporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 8.4 Built Heritage Maps and Views - Part2Supporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 8.4 Built Heritage Maps and Views - Part3Supporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 9.1 DSO 3D and Plan ViewsSupporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 9.4 Vertical Sky Component ResultsSupporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 9.5 Daylight Distribution ResultsSupporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 9.6 Daylight Distribution Contour PlansSupporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 9.7 Annual Probable Sunlight Hours ResultsSupporting Documents · PDF8 Jul 2026View
Environmental Statement Appendix 9.8 Sun Hours on the Ground PlotSupporting Documents · PDF8 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Environmental Impact Assessment Received

    Published milestoneCouncil source
  2. Application Received Date

    Published milestoneCouncil source
  3. Application Validated Date

    Published milestoneCouncil source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Standard Consultation Date

    Published milestoneCouncil source
  6. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  7. Last Advertised In Press Date

    Published milestoneCouncil source
  8. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Determination Deadline

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.