Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
SGN Site, Greenwich Peninsula, Millennium Way, London SE10
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConstruction of a mixed-use development comprising purpose-built shared-living accommodation (Sui Generis), purpose-built student accommodation (Sui Generis), affordable residential housing units (Class C3) and small-scale convenience retail accommodation, along with new public open space and associated worksFurther detailed explanation of the proposal for consultation purposes (not forming part of the formal description of development set out above):��The proposal includes three blocks with public open space and associated works comprising:Block A - PBSA Building part 10, part 29 storeys with 426 units /834 bedspacesBlock B - PBSL/Co-living of building 25 storeys with 378 units /420 roomsBlock C - C3 Residential, Affordable Housing 15 storeys with 72 units and ground floor 93sqm commercial unit (Class E)2,799 sqm of public park8 blue badge car parking spaces(This application is an EIA development and is accompanied by Environmental Statement and Environmental Statement Addendum)(The development may impact on the setting of the Maritime Greenwich World Heritage Site, Conservation Areas - Greenwich Park, East Greenwich, Westcombe Park, Island Gardens, Coldharbour as well as nearby Grade II*, Grade II listed buildings and scheduled monument)
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsSGN Site, Greenwich Peninsula, Millennium Way, London SE10
This record has no verified map location.
View council map| Document | Published | Action |
|---|---|---|
| Acknowledgement letterCorrespondence · PDF | 15 Sept 2026 | View |
| Es volume 1 - update to rectify contents onlyDocument · PDF | 14 Sept 2026 | View |
| Sitewide plans combinedDrawing · PDF | 14 Sept 2026 | View |
| Building a level plans combinedDrawing · PDF | 14 Sept 2026 | View |
| Building b level plans combinedDrawing · PDF | 14 Sept 2026 | View |
| Building c level plans combinedDrawing · PDF | 14 Sept 2026 | View |
| C3 unit types combinedDrawing · PDF | 14 Sept 2026 | View |
| Pbsa room types combinedDrawing · PDF | 14 Sept 2026 | View |
| Sitewide elevations combined a-a - f-fDrawing · PDF | 14 Sept 2026 | View |
| Bay study combinedDrawing · PDF | 14 Sept 2026 | View |
| Flood risk assessment and drainage strategyDocument · PDF | 14 Sept 2026 | View |
| Basement impact assessmentDocument · PDF | 14 Sept 2026 | View |
| Fire statementDocument · PDF | 14 Sept 2026 | View |
| Geotechnical and geoenvironmental preliminary risk assessment (desk study) - parDocument · PDF | 14 Sept 2026 | View |
| Geotechnical and geoenvironmental preliminary risk assessment (desk study) - parDocument · PDF | 14 Sept 2026 | View |
| Utility assessment reportDocument · PDF | 14 Sept 2026 | View |
| Updated internal daylight and sunlight reportDocument · PDF | 11 Sept 2026 | View |
| Es addendumDocument · PDF | 11 Sept 2026 | View |
| Biodiversity net gain metricDocument | 11 Sept 2026 | View |
| Design and access statement combined - part 1Document · PDF | 11 Sept 2026 | View |
| Design and access statement combined - part 2Document · PDF | 11 Sept 2026 | View |
| Design and access statement combined - part 3Document · PDF | 11 Sept 2026 | View |
| Design and access statement combined - part 4Document · PDF | 11 Sept 2026 | View |
| Preliminary ecological appraisalDocument · PDF | 8 Sept 2026 | View |
| Landscape and ecology management planDocument · PDF | 8 Sept 2026 | View |
| Habitat management and monitoring planDocument · PDF | 8 Sept 2026 | View |
| Biodiversity net gain assessmentDocument · PDF | 8 Sept 2026 | View |
| Arboricultural impact assessmentDocument · PDF | 8 Sept 2026 | View |
| Greenwich tva_compressedDocument · PDF | 8 Sept 2026 | View |
| Gla wlc spreadsheetDocument | 8 Sept 2026 | View |
| Gla circular economy spreadsheetDocument | 8 Sept 2026 | View |
| Es volume 3 - appendix 5.1 whole life cycle carbon assessmentDocument · PDF | 8 Sept 2026 | View |
| Sustainability statementDocument · PDF | 8 Sept 2026 | View |
| Energy statementDocument · PDF | 8 Sept 2026 | View |
| Circular economy statementDocument · PDF | 8 Sept 2026 | View |
| Figure 3-6Drawing · PDF | 8 Sept 2026 | View |
| Ventilation report revcDocument · PDF | 8 Sept 2026 | View |
| Aviation impact assessment - 08.05.2026Document · PDF | 8 Sept 2026 | View |
| Economic benefits studyDocument · PDF | 8 Sept 2026 | View |
| Internal daylight and sunlight report - part 1Superseded · PDF | 8 Sept 2026 | View |
| Health impact assessmentDocument · PDF | 8 Sept 2026 | View |
| Outline delivery and servicing planDocument · PDF | 8 Sept 2026 | View |
| Travel planDocument · PDF | 8 Sept 2026 | View |
| Transport assessment - part 7Document · PDF | 8 Sept 2026 | View |
| Transport assessment - part 6Document · PDF | 8 Sept 2026 | View |
| Transport assessment - part 5Document · PDF | 8 Sept 2026 | View |
| Transport assessment - part 4Document · PDF | 8 Sept 2026 | View |
| Transport assessment - part 3Document · PDF | 8 Sept 2026 | View |
| Transport assessment - part 2Document · PDF | 8 Sept 2026 | View |
| Transport assessment - part 1Document · PDF | 8 Sept 2026 | View |
| Parking design management plan v1.1Document · PDF | 8 Sept 2026 | View |
| Operational site waste management planDocument · PDF | 8 Sept 2026 | View |
| Outline site waste management planDocument · PDF | 8 Sept 2026 | View |
| Cemp final v1.0.Document · PDF | 8 Sept 2026 | View |
| Internal daylight and sunlight report - part 9Superseded · PDF | 8 Sept 2026 | View |
| Internal daylight and sunlight report - part 8Superseded · PDF | 8 Sept 2026 | View |
| Internal daylight and sunlight report - part 7Superseded · PDF | 8 Sept 2026 | View |
| Internal daylight and sunlight report - part 6Superseded · PDF | 8 Sept 2026 | View |
| Internal daylight and sunlight report - part 5Superseded · PDF | 8 Sept 2026 | View |
| Internal daylight and sunlight report - part 4Superseded · PDF | 8 Sept 2026 | View |
| Internal daylight and sunlight report - part 3Superseded · PDF | 8 Sept 2026 | View |
| Internal daylight and sunlight report - part 2Superseded · PDF | 8 Sept 2026 | View |
| Internal daylight and sunlight report - part 11Superseded · PDF | 8 Sept 2026 | View |
| Internal daylight and sunlight report - part 10Superseded · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 7.3 ground investigation factual report part 5Document · PDF | 8 Sept 2026 | View |
| Fire statementDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 7.3 ground investigation factual report part 4Document · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 7.3 ground investigation factual report part 3Document · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 7.3 ground investigation factual report part 2Document · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 7.3 ground investigation factual report part 1Document · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 7.2 transco final factual report part 6Document · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 7.2 transco final factual report part 5Document · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 7.2 transco final factual report part 4Document · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 7.2 transco final factual report part 3Document · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 7.2 transco final factual report part 2Document · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 7.2 transco final factual report part 1Document · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 7.1 geotechnical desk study part 3Document · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 7.1 geotechnical desk study - part 2Document · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 7.1 geotechnical desk study part 1Document · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 6.6 solar glareDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 6.5 tranisent shadowDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 6.4 sun on groundDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 6.3 daylight - sunlight resultsDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 6.2 location plansDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 6.1 legislation and guidanceDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 5.2 energy statement.Document · PDF | 8 Sept 2026 | View |
| Es volume 3 - energy statementDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 4.2 cempDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 4.1 detailed planning drawings part 5Document · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 4.1 detailed planning drawings part 4Document · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 4.1 detailed planning drawings part 3Document · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 4.1 detailed planning drawings part 2Document · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 4.1 detailed planning drawings part 1Document · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 2.5 schedule of mitigation good practice and monitoringDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 2.4 cumulative schemesDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 2.3 response to scopingDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 2.2 scoping opinionDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 2.1 scoping reportDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 1.2 statement of expertiseDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 1.1 glossary and abbreviationsDocument · PDF | 8 Sept 2026 | View |
| Fire strategyDocument · PDF | 8 Sept 2026 | View |
| Planning statementDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 7.4 1 of 5Document · PDF | 8 Sept 2026 | View |
| Covering letterDocument · PDF | 8 Sept 2026 | View |
| Be seen spreadsheetDocument | 8 Sept 2026 | View |
| Application form redactedDrawing · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 8.8 construction noise modelling imagesDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 8.7 site suitability assessmentDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 8.6 construction plant assumptionsDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 8.5 environmental noise survey report studio 338 operatioDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 8.4 weekend environmental noise survey reportDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 8.3 weekday environmental noise survey reportDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 8.2 glossary of termsDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 8.1 legislation policy and guidanceDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 7.6 gea desk study part 2Document · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 7.6 gea desk study part 1Document · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 7.5 health and safety fileDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 7.4 close out report part 5Document · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 7.4 close out report part 4Document · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 7.4 close out report part 3Document · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 7.4 close out report part 2Document · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 11.3 air quality positive statementDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 11.2 construction phase dust assessment.Document · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 11.1 model inputsDocument · PDF | 8 Sept 2026 | View |
| Es volume 3 - appendix 10.1 pedestrian level wind microclimate technical appendiDocument · PDF | 8 Sept 2026 | View |
| Accomodation scheduleDocument · PDF | 8 Sept 2026 | View |
| Drawing registerDocument · PDF | 8 Sept 2026 | View |
| Historic environment assessmentDocument · PDF | 8 Sept 2026 | View |
| Es volume 2 - figure 9.1 spatial boundary planDocument · PDF | 8 Sept 2026 | View |
| Es volume 2 - figure 8.4 baseline noise measurement locationsDocument · PDF | 8 Sept 2026 | View |
| Es volume 2 - figure 8.3 nearby wharvesDocument · PDF | 8 Sept 2026 | View |
| Es volume 2 - figure 8.2 potential future noise and vibration sensitive receptorDocument · PDF | 8 Sept 2026 | View |
| Es volume 2 - figure 8.1 existing noise and vibration sensitive receptorsDocument · PDF | 8 Sept 2026 | View |
| Es volume 2 - figure 7.3 historical groundwater exceedences.Document · PDF | 8 Sept 2026 | View |
| Es volume 2 - figure 7.2 historical ground investigation locationDocument · PDF | 8 Sept 2026 | View |
| Es volume 2 - figure 3.2 key constraintsDocument · PDF | 8 Sept 2026 | View |
| Es volume 2 - figure 3.1 surrounding land usesDocument · PDF | 8 Sept 2026 | View |
| Es volume 2 - figure 2.1 cumulative schemesDocument · PDF | 8 Sept 2026 | View |
| Es volume 2 - figure 11.3 annual mean pm2.5 concentrations across the site.Document · PDF | 8 Sept 2026 | View |
| Es volume 2 - figure 11.2 annual mean pm10 concentrations across the siteDocument · PDF | 8 Sept 2026 | View |
| Es volume 2 - figure 11.1 annual mean no2 concentrations across the siteDocument · PDF | 8 Sept 2026 | View |
| Es volume 2 - figure 10.1 to 10.41 wind figuresDocument · PDF | 8 Sept 2026 | View |
| Es volume 2 - figure 1.1 site location planDocument · PDF | 8 Sept 2026 | View |
| Demolition planDrawing · PDF | 8 Sept 2026 | View |
| Existing sectionsDrawing · PDF | 8 Sept 2026 | View |
| Existing elevationsDrawing · PDF | 8 Sept 2026 | View |
| Existing site planDrawing · PDF | 8 Sept 2026 | View |
| Combined roof planDrawing · PDF | 8 Sept 2026 | View |
| Site planDrawing · PDF | 8 Sept 2026 | View |
| Location planDrawing · PDF | 8 Sept 2026 | View |
| Building c sectionsDrawing · PDF | 8 Sept 2026 | View |
| Building b sectionsDrawing · PDF | 8 Sept 2026 | View |
| Building a sectionsDrawing · PDF | 8 Sept 2026 | View |
| Building c - elevationsDrawing · PDF | 8 Sept 2026 | View |
| Building b - elevationDrawing · PDF | 8 Sept 2026 | View |
| Building a - elevationsDrawing · PDF | 8 Sept 2026 | View |
| Building a - elevationsDrawing · PDF | 8 Sept 2026 | View |
| Crescent elevationDrawing · PDF | 8 Sept 2026 | View |
| Student management plan finalDocument · PDF | 8 Sept 2026 | View |
| Statement of community involvement - may 2026 - finalDocument · PDF | 8 Sept 2026 | View |
| Shared living demand study site at millennium way greenwich finalDocument · PDF | 8 Sept 2026 | View |
| Pbsl management planDocument · PDF | 8 Sept 2026 | View |
| Es volume 1 - supersededSuperseded · PDF | 8 Sept 2026 | View |
| Es volume 4 - non technical summaryDocument · PDF | 8 Sept 2026 | View |
| Sgn greenwich affordable housing statement 19052026Document · PDF | 8 Sept 2026 | View |
| Part l 2021 - gla carbon emission reporting spreadsheetDocument | 8 Sept 2026 | View |
| Greenwich pbsa needs assessment finalDocument · PDF | 8 Sept 2026 | View |
| Landscape general arrangement roof terraceDrawing · PDF | 8 Sept 2026 | View |
| Levels planDrawing · PDF | 8 Sept 2026 | View |
| Landscape general arrangement ground floorDrawing · PDF | 8 Sept 2026 | View |
| Pbsl studio acDrawing · PDF | 8 Sept 2026 | View |
Documents open on the council website. Browse council documents if a link has changed.
We haven’t collected any decision conditions for this application.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.