Council planning record

Construction of a mixed-use development comprising purpose-built shared-living accommodation (Sui Generis), purpose-built student accommodation (Sui Generis), affordable residential housing units (Class C3) and small-scale convenience retail accommodation, along with new public open space and associated worksFurther detailed explanation of the proposal for consultation purposes (not forming part of the formal description of development set out above):��The proposal includes three blocks with public open space and associated works comprising:Block A - PBSA Building part 10, part 29 storeys with 426 units /834 bedspacesBlock B - PBSL/Co-living of building 25 storeys with 378 units /420 roomsBlock C - C3 Residential, Affordable Housing 15 storeys with 72 units and ground floor 93sqm commercial unit (Class E)2,799 sqm of public park8 blue badge car parking spaces(This application is an EIA development and is accompanied by Environmental Statement and Environmental Statement Addendum)(The development may impact on the setting of the Maritime Greenwich World Heritage Site, Conservation Areas - Greenwich Park, East Greenwich, Westcombe Park, Island Gardens, Coldharbour as well as nearby Grade II*, Grade II listed buildings and scheduled monument)

SGN Site, Greenwich Peninsula, Millennium Way, London SE10

RegisteredReference: 26/2624/FRoyal Borough of Greenwich

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Registered
Application type
Full Planning Permission
Received
17 Aug 2026
Validated
17 Aug 2026
Determination deadline
Not published
Local authority
Royal Borough of Greenwich

Application overview

Construction of a mixed-use development comprising purpose-built shared-living accommodation (Sui Generis), purpose-built student accommodation (Sui Generis), affordable residential housing units (Class C3) and small-scale convenience retail accommodation, along with new public open space and associated worksFurther detailed explanation of the proposal for consultation purposes (not forming part of the formal description of development set out above):��The proposal includes three blocks with public open space and associated works comprising:Block A - PBSA Building part 10, part 29 storeys with 426 units /834 bedspacesBlock B - PBSL/Co-living of building 25 storeys with 378 units /420 roomsBlock C - C3 Residential, Affordable Housing 15 storeys with 72 units and ground floor 93sqm commercial unit (Class E)2,799 sqm of public park8 blue badge car parking spaces(This application is an EIA development and is accompanied by Environmental Statement and Environmental Statement Addendum)(The development may impact on the setting of the Maritime Greenwich World Heritage Site, Conservation Areas - Greenwich Park, East Greenwich, Westcombe Park, Island Gardens, Coldharbour as well as nearby Grade II*, Grade II listed buildings and scheduled monument)

Proposal details

Reference
26/2624/F
Alternative references
PP-14606768
Ward
GREENWICH PENINSULA
Parish
Greenwich
Agent
DP9

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

SGN Site, Greenwich Peninsula, Millennium Way, London SE10

This record has no verified map location.

View council map

Documents 171 of 171

DocumentPublishedAction
Acknowledgement letterCorrespondence · PDF15 Sept 2026View
Es volume 1 - update to rectify contents onlyDocument · PDF14 Sept 2026View
Sitewide plans combinedDrawing · PDF14 Sept 2026View
Building a level plans combinedDrawing · PDF14 Sept 2026View
Building b level plans combinedDrawing · PDF14 Sept 2026View
Building c level plans combinedDrawing · PDF14 Sept 2026View
C3 unit types combinedDrawing · PDF14 Sept 2026View
Pbsa room types combinedDrawing · PDF14 Sept 2026View
Sitewide elevations combined a-a - f-fDrawing · PDF14 Sept 2026View
Bay study combinedDrawing · PDF14 Sept 2026View
Flood risk assessment and drainage strategyDocument · PDF14 Sept 2026View
Basement impact assessmentDocument · PDF14 Sept 2026View
Fire statementDocument · PDF14 Sept 2026View
Geotechnical and geoenvironmental preliminary risk assessment (desk study) - parDocument · PDF14 Sept 2026View
Geotechnical and geoenvironmental preliminary risk assessment (desk study) - parDocument · PDF14 Sept 2026View
Utility assessment reportDocument · PDF14 Sept 2026View
Updated internal daylight and sunlight reportDocument · PDF11 Sept 2026View
Es addendumDocument · PDF11 Sept 2026View
Biodiversity net gain metricDocument11 Sept 2026View
Design and access statement combined - part 1Document · PDF11 Sept 2026View
Design and access statement combined - part 2Document · PDF11 Sept 2026View
Design and access statement combined - part 3Document · PDF11 Sept 2026View
Design and access statement combined - part 4Document · PDF11 Sept 2026View
Preliminary ecological appraisalDocument · PDF8 Sept 2026View
Landscape and ecology management planDocument · PDF8 Sept 2026View
Habitat management and monitoring planDocument · PDF8 Sept 2026View
Biodiversity net gain assessmentDocument · PDF8 Sept 2026View
Arboricultural impact assessmentDocument · PDF8 Sept 2026View
Greenwich tva_compressedDocument · PDF8 Sept 2026View
Gla wlc spreadsheetDocument8 Sept 2026View
Gla circular economy spreadsheetDocument8 Sept 2026View
Es volume 3 - appendix 5.1 whole life cycle carbon assessmentDocument · PDF8 Sept 2026View
Sustainability statementDocument · PDF8 Sept 2026View
Energy statementDocument · PDF8 Sept 2026View
Circular economy statementDocument · PDF8 Sept 2026View
Figure 3-6Drawing · PDF8 Sept 2026View
Ventilation report revcDocument · PDF8 Sept 2026View
Aviation impact assessment - 08.05.2026Document · PDF8 Sept 2026View
Economic benefits studyDocument · PDF8 Sept 2026View
Internal daylight and sunlight report - part 1Superseded · PDF8 Sept 2026View
Health impact assessmentDocument · PDF8 Sept 2026View
Outline delivery and servicing planDocument · PDF8 Sept 2026View
Travel planDocument · PDF8 Sept 2026View
Transport assessment - part 7Document · PDF8 Sept 2026View
Transport assessment - part 6Document · PDF8 Sept 2026View
Transport assessment - part 5Document · PDF8 Sept 2026View
Transport assessment - part 4Document · PDF8 Sept 2026View
Transport assessment - part 3Document · PDF8 Sept 2026View
Transport assessment - part 2Document · PDF8 Sept 2026View
Transport assessment - part 1Document · PDF8 Sept 2026View
Parking design management plan v1.1Document · PDF8 Sept 2026View
Operational site waste management planDocument · PDF8 Sept 2026View
Outline site waste management planDocument · PDF8 Sept 2026View
Cemp final v1.0.Document · PDF8 Sept 2026View
Internal daylight and sunlight report - part 9Superseded · PDF8 Sept 2026View
Internal daylight and sunlight report - part 8Superseded · PDF8 Sept 2026View
Internal daylight and sunlight report - part 7Superseded · PDF8 Sept 2026View
Internal daylight and sunlight report - part 6Superseded · PDF8 Sept 2026View
Internal daylight and sunlight report - part 5Superseded · PDF8 Sept 2026View
Internal daylight and sunlight report - part 4Superseded · PDF8 Sept 2026View
Internal daylight and sunlight report - part 3Superseded · PDF8 Sept 2026View
Internal daylight and sunlight report - part 2Superseded · PDF8 Sept 2026View
Internal daylight and sunlight report - part 11Superseded · PDF8 Sept 2026View
Internal daylight and sunlight report - part 10Superseded · PDF8 Sept 2026View
Es volume 3 - appendix 7.3 ground investigation factual report part 5Document · PDF8 Sept 2026View
Fire statementDocument · PDF8 Sept 2026View
Es volume 3 - appendix 7.3 ground investigation factual report part 4Document · PDF8 Sept 2026View
Es volume 3 - appendix 7.3 ground investigation factual report part 3Document · PDF8 Sept 2026View
Es volume 3 - appendix 7.3 ground investigation factual report part 2Document · PDF8 Sept 2026View
Es volume 3 - appendix 7.3 ground investigation factual report part 1Document · PDF8 Sept 2026View
Es volume 3 - appendix 7.2 transco final factual report part 6Document · PDF8 Sept 2026View
Es volume 3 - appendix 7.2 transco final factual report part 5Document · PDF8 Sept 2026View
Es volume 3 - appendix 7.2 transco final factual report part 4Document · PDF8 Sept 2026View
Es volume 3 - appendix 7.2 transco final factual report part 3Document · PDF8 Sept 2026View
Es volume 3 - appendix 7.2 transco final factual report part 2Document · PDF8 Sept 2026View
Es volume 3 - appendix 7.2 transco final factual report part 1Document · PDF8 Sept 2026View
Es volume 3 - appendix 7.1 geotechnical desk study part 3Document · PDF8 Sept 2026View
Es volume 3 - appendix 7.1 geotechnical desk study - part 2Document · PDF8 Sept 2026View
Es volume 3 - appendix 7.1 geotechnical desk study part 1Document · PDF8 Sept 2026View
Es volume 3 - appendix 6.6 solar glareDocument · PDF8 Sept 2026View
Es volume 3 - appendix 6.5 tranisent shadowDocument · PDF8 Sept 2026View
Es volume 3 - appendix 6.4 sun on groundDocument · PDF8 Sept 2026View
Es volume 3 - appendix 6.3 daylight - sunlight resultsDocument · PDF8 Sept 2026View
Es volume 3 - appendix 6.2 location plansDocument · PDF8 Sept 2026View
Es volume 3 - appendix 6.1 legislation and guidanceDocument · PDF8 Sept 2026View
Es volume 3 - appendix 5.2 energy statement.Document · PDF8 Sept 2026View
Es volume 3 - energy statementDocument · PDF8 Sept 2026View
Es volume 3 - appendix 4.2 cempDocument · PDF8 Sept 2026View
Es volume 3 - appendix 4.1 detailed planning drawings part 5Document · PDF8 Sept 2026View
Es volume 3 - appendix 4.1 detailed planning drawings part 4Document · PDF8 Sept 2026View
Es volume 3 - appendix 4.1 detailed planning drawings part 3Document · PDF8 Sept 2026View
Es volume 3 - appendix 4.1 detailed planning drawings part 2Document · PDF8 Sept 2026View
Es volume 3 - appendix 4.1 detailed planning drawings part 1Document · PDF8 Sept 2026View
Es volume 3 - appendix 2.5 schedule of mitigation good practice and monitoringDocument · PDF8 Sept 2026View
Es volume 3 - appendix 2.4 cumulative schemesDocument · PDF8 Sept 2026View
Es volume 3 - appendix 2.3 response to scopingDocument · PDF8 Sept 2026View
Es volume 3 - appendix 2.2 scoping opinionDocument · PDF8 Sept 2026View
Es volume 3 - appendix 2.1 scoping reportDocument · PDF8 Sept 2026View
Es volume 3 - appendix 1.2 statement of expertiseDocument · PDF8 Sept 2026View
Es volume 3 - appendix 1.1 glossary and abbreviationsDocument · PDF8 Sept 2026View
Fire strategyDocument · PDF8 Sept 2026View
Planning statementDocument · PDF8 Sept 2026View
Es volume 3 - appendix 7.4 1 of 5Document · PDF8 Sept 2026View
Covering letterDocument · PDF8 Sept 2026View
Be seen spreadsheetDocument8 Sept 2026View
Application form redactedDrawing · PDF8 Sept 2026View
Es volume 3 - appendix 8.8 construction noise modelling imagesDocument · PDF8 Sept 2026View
Es volume 3 - appendix 8.7 site suitability assessmentDocument · PDF8 Sept 2026View
Es volume 3 - appendix 8.6 construction plant assumptionsDocument · PDF8 Sept 2026View
Es volume 3 - appendix 8.5 environmental noise survey report studio 338 operatioDocument · PDF8 Sept 2026View
Es volume 3 - appendix 8.4 weekend environmental noise survey reportDocument · PDF8 Sept 2026View
Es volume 3 - appendix 8.3 weekday environmental noise survey reportDocument · PDF8 Sept 2026View
Es volume 3 - appendix 8.2 glossary of termsDocument · PDF8 Sept 2026View
Es volume 3 - appendix 8.1 legislation policy and guidanceDocument · PDF8 Sept 2026View
Es volume 3 - appendix 7.6 gea desk study part 2Document · PDF8 Sept 2026View
Es volume 3 - appendix 7.6 gea desk study part 1Document · PDF8 Sept 2026View
Es volume 3 - appendix 7.5 health and safety fileDocument · PDF8 Sept 2026View
Es volume 3 - appendix 7.4 close out report part 5Document · PDF8 Sept 2026View
Es volume 3 - appendix 7.4 close out report part 4Document · PDF8 Sept 2026View
Es volume 3 - appendix 7.4 close out report part 3Document · PDF8 Sept 2026View
Es volume 3 - appendix 7.4 close out report part 2Document · PDF8 Sept 2026View
Es volume 3 - appendix 11.3 air quality positive statementDocument · PDF8 Sept 2026View
Es volume 3 - appendix 11.2 construction phase dust assessment.Document · PDF8 Sept 2026View
Es volume 3 - appendix 11.1 model inputsDocument · PDF8 Sept 2026View
Es volume 3 - appendix 10.1 pedestrian level wind microclimate technical appendiDocument · PDF8 Sept 2026View
Accomodation scheduleDocument · PDF8 Sept 2026View
Drawing registerDocument · PDF8 Sept 2026View
Historic environment assessmentDocument · PDF8 Sept 2026View
Es volume 2 - figure 9.1 spatial boundary planDocument · PDF8 Sept 2026View
Es volume 2 - figure 8.4 baseline noise measurement locationsDocument · PDF8 Sept 2026View
Es volume 2 - figure 8.3 nearby wharvesDocument · PDF8 Sept 2026View
Es volume 2 - figure 8.2 potential future noise and vibration sensitive receptorDocument · PDF8 Sept 2026View
Es volume 2 - figure 8.1 existing noise and vibration sensitive receptorsDocument · PDF8 Sept 2026View
Es volume 2 - figure 7.3 historical groundwater exceedences.Document · PDF8 Sept 2026View
Es volume 2 - figure 7.2 historical ground investigation locationDocument · PDF8 Sept 2026View
Es volume 2 - figure 3.2 key constraintsDocument · PDF8 Sept 2026View
Es volume 2 - figure 3.1 surrounding land usesDocument · PDF8 Sept 2026View
Es volume 2 - figure 2.1 cumulative schemesDocument · PDF8 Sept 2026View
Es volume 2 - figure 11.3 annual mean pm2.5 concentrations across the site.Document · PDF8 Sept 2026View
Es volume 2 - figure 11.2 annual mean pm10 concentrations across the siteDocument · PDF8 Sept 2026View
Es volume 2 - figure 11.1 annual mean no2 concentrations across the siteDocument · PDF8 Sept 2026View
Es volume 2 - figure 10.1 to 10.41 wind figuresDocument · PDF8 Sept 2026View
Es volume 2 - figure 1.1 site location planDocument · PDF8 Sept 2026View
Demolition planDrawing · PDF8 Sept 2026View
Existing sectionsDrawing · PDF8 Sept 2026View
Existing elevationsDrawing · PDF8 Sept 2026View
Existing site planDrawing · PDF8 Sept 2026View
Combined roof planDrawing · PDF8 Sept 2026View
Site planDrawing · PDF8 Sept 2026View
Location planDrawing · PDF8 Sept 2026View
Building c sectionsDrawing · PDF8 Sept 2026View
Building b sectionsDrawing · PDF8 Sept 2026View
Building a sectionsDrawing · PDF8 Sept 2026View
Building c - elevationsDrawing · PDF8 Sept 2026View
Building b - elevationDrawing · PDF8 Sept 2026View
Building a - elevationsDrawing · PDF8 Sept 2026View
Building a - elevationsDrawing · PDF8 Sept 2026View
Crescent elevationDrawing · PDF8 Sept 2026View
Student management plan finalDocument · PDF8 Sept 2026View
Statement of community involvement - may 2026 - finalDocument · PDF8 Sept 2026View
Shared living demand study site at millennium way greenwich finalDocument · PDF8 Sept 2026View
Pbsl management planDocument · PDF8 Sept 2026View
Es volume 1 - supersededSuperseded · PDF8 Sept 2026View
Es volume 4 - non technical summaryDocument · PDF8 Sept 2026View
Sgn greenwich affordable housing statement 19052026Document · PDF8 Sept 2026View
Part l 2021 - gla carbon emission reporting spreadsheetDocument8 Sept 2026View
Greenwich pbsa needs assessment finalDocument · PDF8 Sept 2026View
Landscape general arrangement roof terraceDrawing · PDF8 Sept 2026View
Levels planDrawing · PDF8 Sept 2026View
Landscape general arrangement ground floorDrawing · PDF8 Sept 2026View
Pbsl studio acDrawing · PDF8 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.