Council planning record

Construction of two buildings for use as Purpose Built Student Accommodation (PBSA) (sui generis) and Large-Scale Purpose Built Shared Living (LSPBSL) (sui generis), landscaping, access works, car parking, and associated works. Further detailed explanation of the proposal for consultation purposes (not forming part of the formal description of development set out above): Construction of two buildings for use as Purpose Built Student Accommodation (PBSA) (sui generis) and Large-Scale Purpose Built Shared Living (LSPBSL) (sui generis) consisting of:PBSA Building of 13 and 27 storeys with 673 student bedspaces LSPBSL/Co-living of building 23 storeys with 380 bedspaces and landscaping, access works, 4 car parking spaces, and associated works.(This application is an EIA development and is accompanied by Environmental Statement) (The development may impact on the setting of the Maritime Greenwich World Heritage Site, Conservation Areas - Greenwich Park, East Greenwich, Island Gardens, Coldharbour as well as nearby Grade II*, Grade II listed buildings and scheduled monument)30 day Reconsultation - To rectify error in number of PBSA student bedspaces reported of 373 bedspaces to 673 bedspaces and error in publication of ES and application documents. Additionally revised chapter 11 of ES

FORMER NATIONAL GRID SITE, MILLENNIUM WAY, GREENWICH, SE10 0BB

RegisteredReference: 26/2018/FRoyal Borough of Greenwich

Last published check: 8 Oct 2026, 07:59. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated

    Published milestoneCouncil source
  3. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Standard Consultation Date

    Published milestoneCouncil source

Application summary

Status
Registered
Application type
Full Planning Permission
Received
7 Jul 2026
Validated
10 Jul 2026
Determination deadline
Not published
Local authority
Royal Borough of Greenwich

Application overview

Construction of two buildings for use as Purpose Built Student Accommodation (PBSA) (sui generis) and Large-Scale Purpose Built Shared Living (LSPBSL) (sui generis), landscaping, access works, car parking, and associated works. Further detailed explanation of the proposal for consultation purposes (not forming part of the formal description of development set out above): Construction of two buildings for use as Purpose Built Student Accommodation (PBSA) (sui generis) and Large-Scale Purpose Built Shared Living (LSPBSL) (sui generis) consisting of:PBSA Building of 13 and 27 storeys with 673 student bedspaces LSPBSL/Co-living of building 23 storeys with 380 bedspaces and landscaping, access works, 4 car parking spaces, and associated works.(This application is an EIA development and is accompanied by Environmental Statement) (The development may impact on the setting of the Maritime Greenwich World Heritage Site, Conservation Areas - Greenwich Park, East Greenwich, Island Gardens, Coldharbour as well as nearby Grade II*, Grade II listed buildings and scheduled monument)30 day Reconsultation - To rectify error in number of PBSA student bedspaces reported of 373 bedspaces to 673 bedspaces and error in publication of ES and application documents. Additionally revised chapter 11 of ES

Proposal details

Reference
26/2018/F
Alternative references
PP-14932526
Ward
GREENWICH PENINSULA
Parish
Greenwich
Agent
ROK Planning

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

FORMER NATIONAL GRID SITE, MILLENNIUM WAY, GREENWICH, SE10 0BB

This record has no verified map location.

View council map

Documents 168 of 168

DocumentPublishedAction
Student management planDocument · PDF29 Sept 2026View
Transport assessmentDocument · PDF29 Sept 2026View
Outline construction logistics plan - part 1Document · PDF29 Sept 2026View
Outline construction logistics plan - part 2Document · PDF29 Sept 2026View
Framework travel planDocument · PDF29 Sept 2026View
Site layoutDrawing · PDF29 Sept 2026View
Pbsa & co-living fvaDocument · PDF21 Aug 2026View
CorrespondanceCorrespondence · PDF31 Jul 2026View
Financial viability asessmentSuperseded · PDF30 Jul 2026View
Revised chapter 011 - residual effects, mitigation and cumulative effectsDocument · PDF30 Jul 2026View
Letter from ravensbourne university londonDocument · PDF15 Jul 2026View
Utilities assessmentDocument · PDF15 Jul 2026View
London plan fire statementDocument · PDF15 Jul 2026View
Appendix 6.1 images of existing, proposed and surrounding buildingsDocument · PDF14 Jul 2026View
011 residual effects, mitigation and cumulative effectsSuperseded · PDF13 Jul 2026View
003 proposed development, constructionDocument · PDF13 Jul 2026View
006 daylight, sunlight, overshadowing and solar glareDocument · PDF13 Jul 2026View
Es volume i: main textDocument · PDF13 Jul 2026View
Existing west elevationDrawing · PDF8 Jul 2026View
Existing site location planDrawing · PDF8 Jul 2026View
Existing site planDrawing · PDF8 Jul 2026View
Existing north elevationDrawing · PDF8 Jul 2026View
Millennium way - planning statement 149325260000.pdfDocument · PDF8 Jul 2026View
Covering letterDocument · PDF8 Jul 2026View
Mw thvia lr final part 2Document · PDF8 Jul 2026View
Mw thvia lr finalpart1Document · PDF8 Jul 2026View
Application form redactedApplication Form · PDF8 Jul 2026View
Appendix 1.1 site location plan149325260000.pdfDocument · PDF8 Jul 2026View
Appendix 1.2 location of specified information149325260000.pdfDocument · PDF8 Jul 2026View
Appendix 1.3 eia scoping request part 1Document · PDF8 Jul 2026View
Appendix 1.3 eia scoping request part 2Document · PDF8 Jul 2026View
Appendix 1.4 rbg eia scoping opinionDocument · PDF8 Jul 2026View
Vol iii non-technical summaryDocument · PDF8 Jul 2026View
Appendix 8.3 rba noise impact assessment report 14776nia149325260000.pdfDocument · PDF8 Jul 2026View
Appendix 9.1 policy review 149325260000.pdfDocument · PDF8 Jul 2026View
Appendix 9.2 health impact assessment149325260000.pdfDocument · PDF8 Jul 2026View
Appendix 10.1 wind microclimate report part 1Document · PDF8 Jul 2026View
Appendix 10.1 wind microclimate report part 2Document · PDF8 Jul 2026View
Appendix 11.1 schedule of mitigation measures in the es1Document · PDF8 Jul 2026View
Appendix 6.6 solar glare frequency assessment149325260000.pdfDocument · PDF8 Jul 2026View
Appendix 7.1 desk study preliminary risk assessme part 1149325260000.pdfDocument · PDF8 Jul 2026View
Appendix 7.1 desk study preliminary risk assessme part 2149325260000.pdfDocument · PDF8 Jul 2026View
Appendix 7.2 draft geo-environmental ground investigation149325260000.pdfDocument · PDF8 Jul 2026View
Appendix 8.1 acoustic terminology149325260000.pdfDocument · PDF8 Jul 2026View
Appendix 8.2 construction plant teams149325260000.pdfDocument · PDF8 Jul 2026View
Appendix 5.3 millenium way overheating report149325260000.pdfDocument · PDF8 Jul 2026View
Appendix 6.2 daylight and sunlight assessment results149325260000.pdfDocument · PDF8 Jul 2026View
Appendix 6.3 daylight and sunlight facade studies part 1149325260000.pdfDocument · PDF8 Jul 2026View
Appendix 6.3 daylight and sunlight facade studies part 2149325260000.pdfDocument · PDF8 Jul 2026View
Appendix 6.4 sunlight amenity assessment149325260000.pdfDocument · PDF8 Jul 2026View
Appendix 6.5 transient shadow images149325260000.pdfDocument · PDF8 Jul 2026View
Appendix 3.1 detailed planning drawings part 3Document · PDF8 Jul 2026View
Appendix 3.1 detailed planning drawings part 4Document · PDF8 Jul 2026View
Appendix 3.1 detailed planning drawings part 5Document · PDF8 Jul 2026View
Appendix 3.1 detailed planning drawings part 6Document · PDF8 Jul 2026View
Appendix 5.1 millenium way energy strategy report 1Document · PDF8 Jul 2026View
Appendix 5.2 millenium way whole life carbon assessment149325260000.pdfDocument · PDF8 Jul 2026View
Appendix 1.5 consultation response tableDocument · PDF8 Jul 2026View
Appendix 1.6 competency statementDocument · PDF8 Jul 2026View
Appendix 1.7 cumulative schemesDrawing · PDF8 Jul 2026View
Appendix 3.1 detailed planning drawings part 1Document · PDF8 Jul 2026View
Appendix 3.1 detailed planning drawings part 2Document · PDF8 Jul 2026View
008 noise and vibration149325260000.pdfDocument · PDF8 Jul 2026View
009 socio-economics and health149325260000.pdfDocument · PDF8 Jul 2026View
010 wind microclimate149325260000.pdfDocument · PDF8 Jul 2026View
Landscape strategy.pdfDocument · PDF8 Jul 2026View
25.035-bosk-xx-00-dr-l-1000 p16149325260000.pdfDrawing · PDF8 Jul 2026View
25.035-bosk-xx-zz-dr-l-1000 p12149325260000.pdfDrawing · PDF8 Jul 2026View
000 cover page149325260000.pdfDocument · PDF8 Jul 2026View
001 description and eia methodology149325260000.pdfDocument · PDF8 Jul 2026View
002 description of site and site context149325260000.pdfDocument · PDF8 Jul 2026View
004 air quality149325260000.pdfDocument · PDF8 Jul 2026View
005 climate change and greenhouse gases149325260000.pdfDocument · PDF8 Jul 2026View
007 ground conditions and contamination149325260000.pdfDocument · PDF8 Jul 2026View
Wind microclimate reportDocument · PDF8 Jul 2026View
Design and access statement - lowres-97-129Document · PDF8 Jul 2026View
Design and access statement - lowres-1-40Document · PDF8 Jul 2026View
Design and access statement - lowres-41-74Document · PDF8 Jul 2026View
Design and access statement - lowres-75-96Document · PDF8 Jul 2026View
Full sap calculation printout combinedunit 2l02studiow-55studiow-55be lean2026-0Document · PDF8 Jul 2026View
Full sap calculation printout combinedunit 3l02studiosw-52studiosw-52be clean202Document · PDF8 Jul 2026View
Full sap calculation printout combinedunit 3l02studiosw-52studiosw-52be green202Document · PDF8 Jul 2026View
Daylight and sunlight reportDocument · PDF8 Jul 2026View
Flood risk assessment & drainage strategy reportDocument · PDF8 Jul 2026View
Student and co-living needs assessmentDocument · PDF8 Jul 2026View
Full sap calculation printout combinedunit 8l02studion-40studion-40be lean2026-0Document · PDF8 Jul 2026View
Full sap calculation printout combinedunit 1l02studionw-58studionw-58be clean202Document · PDF8 Jul 2026View
Full sap calculation printout combinedunit 1l02studionw-58studionw-58be green202Document · PDF8 Jul 2026View
Full sap calculation printout combinedunit 1l02studionw-58studionw-58be lean2026Document · PDF8 Jul 2026View
Full sap calculation printout combinedunit 2l02studiow-55studiow-55be clean2026-Document · PDF8 Jul 2026View
Full sap calculation printout combinedunit 2l02studiow-55studiow-55be green2026-Document · PDF8 Jul 2026View
Full sap calculation printout combinedunit 6l02studioe-45studioe-45be lean2026-0Document · PDF8 Jul 2026View
Full sap calculation printout combinedunit 7l02studione-42studione-42be clean202Document · PDF8 Jul 2026View
Full sap calculation printout combinedunit 7l02studione-42studione-42be green202Document · PDF8 Jul 2026View
Full sap calculation printout combinedunit 7l02studione-42studione-42be lean2026Document · PDF8 Jul 2026View
Full sap calculation printout combinedunit 8l02studion-40studion-40be clean2026-Document · PDF8 Jul 2026View
Full sap calculation printout combinedunit 8l02studion-40studion-40be green2026-Document · PDF8 Jul 2026View
Full sap calculation printout combinedunit 4l02studios-50studios-50be lean2026-0Document · PDF8 Jul 2026View
Full sap calculation printout combinedunit 5l02studiose-48studiose-48be clean202Document · PDF8 Jul 2026View
Full sap calculation printout combinedunit 5l02studiose-48studiose-48be green202Document · PDF8 Jul 2026View
Full sap calculation printout combinedunit 5l02studiose-48studiose-48be lean2026Document · PDF8 Jul 2026View
Full sap calculation printout combinedunit 6l02studioe-45studioe-45be clean2026-Document · PDF8 Jul 2026View
Full sap calculation printout combinedunit 6l02studioe-45studioe-45be green2026-Document · PDF8 Jul 2026View
Pbsabe greenbruklDocument · PDF8 Jul 2026View
Pbsabe leanbruklDocument · PDF8 Jul 2026View
Be seen spreadsheetDocument8 Jul 2026View
Full sap calculation printout combinedunit 3l02studiosw-52studiosw-52be lean2026Document · PDF8 Jul 2026View
Full sap calculation printout combinedunit 4l02studios-50studios-50be clean2026-Document · PDF8 Jul 2026View
Full sap calculation printout combinedunit 4l02studios-50studios-50be green2026-Document · PDF8 Jul 2026View
Site waste management planDocument · PDF8 Jul 2026View
Circular economy statementsDocument8 Jul 2026View
Lpg- wlca assessment mw planningDocument8 Jul 2026View
Gla spread sheetDocument8 Jul 2026View
Brukl output documentDocument · PDF8 Jul 2026View
Co livingbe leanbruklDocument · PDF8 Jul 2026View
Biodiversity net gain feasibility assessmentDocument · PDF8 Jul 2026View
Appendix 4.1 detailed air quality assessmentDocument · PDF8 Jul 2026View
Statutory biodiversity metricDocument8 Jul 2026View
Millennium way - pre redevelopment audit149325260000.pdfDocument · PDF8 Jul 2026View
Circular economy statement -Document · PDF8 Jul 2026View
Outline construction logistics plan - part 1Superseded · PDF8 Jul 2026View
Framework travel planSuperseded · PDF8 Jul 2026View
Statement of community involvementDocument · PDF8 Jul 2026View
Archaeological dba finalDocument · PDF8 Jul 2026View
Planning gateway one fire statementDocument · PDF8 Jul 2026View
Preliminary ecological appraisalDocument · PDF8 Jul 2026View
Student housing managementDocument · PDF8 Jul 2026View
Coliving lspbsl management planDocument · PDF8 Jul 2026View
Aviation impact assessment v1.1Document · PDF8 Jul 2026View
Transport assessmentSuperseded · PDF8 Jul 2026View
Swept path analysisDrawing · PDF8 Jul 2026View
Outline construction logistics plan - part 2Superseded · PDF8 Jul 2026View
Level 13 plan - pbsaDrawing · PDF8 Jul 2026View
Level 14-24 - pbsaDrawing · PDF8 Jul 2026View
Level 25 - pbsaDrawing · PDF8 Jul 2026View
Level 26 - pbsaDrawing · PDF8 Jul 2026View
Financial viability assessment reportSuperseded · PDF8 Jul 2026View
Project abnormal costs and risks registerDocument · PDF8 Jul 2026View
Proposed phasing planDrawing · PDF8 Jul 2026View
Proposed site topographyDrawing · PDF8 Jul 2026View
Proposed block planDrawing · PDF8 Jul 2026View
Level 00 plan - pbsaDrawing · PDF8 Jul 2026View
Level 01 plan - pbsaDrawing · PDF8 Jul 2026View
Level 02-12 - pbsaDrawing · PDF8 Jul 2026View
Bay study 4 - pbsa shoulder conditionDrawing · PDF8 Jul 2026View
Bay study 5 - pbsl base conditionDrawing · PDF8 Jul 2026View
Bay study 6 - pbsl typical conditionDrawing · PDF8 Jul 2026View
Bay study 7 - pbsl crown conditionDrawing · PDF8 Jul 2026View
Proposed site location planDrawing · PDF8 Jul 2026View
Proposed site planDrawing · PDF8 Jul 2026View
West elevationDrawing · PDF8 Jul 2026View
Proposed west-east sectionDrawing · PDF8 Jul 2026View
Proposed south-north sectionDrawing · PDF8 Jul 2026View
Bay study 1 - pbsa base conditionDrawing · PDF8 Jul 2026View
Bay study 2 - pbsa typical conditionDrawing · PDF8 Jul 2026View
Bay study 3 - pbsa top conditionDrawing · PDF8 Jul 2026View
Level 12 plan - pbslDrawing · PDF8 Jul 2026View
Level 22 plan - pbslDrawing · PDF8 Jul 2026View
Roof plan - pbslDrawing · PDF8 Jul 2026View
North elevationDrawing · PDF8 Jul 2026View
Proposed east elevationDrawing · PDF8 Jul 2026View
South elevationDrawing · PDF8 Jul 2026View
Existing east elevationDrawing · PDF8 Jul 2026View
Existing south elevationDrawing · PDF8 Jul 2026View
Roof plan - pbsaDrawing · PDF8 Jul 2026View
Level 00 plan - pbslDrawing · PDF8 Jul 2026View
Level 01 plan - pbslDrawing · PDF8 Jul 2026View
Level 02-12 13-21 - pbslDrawing · PDF8 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.