Council planning record

Retrospective addition of glazed enclosure to second floor roof terrace staircase platform and glazed enclosure to extended restaurant and bar area, addition of glazed screens to existing balustrades, heating and lighting equipment roof plant equipment, metal frame pergola structure and removable and retractable umbrella to the roof terrace, and relocation of roof ventilation plants, construction of a roof ventilation enclosure, installation of ventilation ductwork to the roof. (This may affect the setting of the surrounding Grade Listed Buildings and Monuments)

BUILDING 2 AT GREENWICH PIER, CUTTY SARK GARDENS, GREENWICH

RegisteredReference: 26/0451/FRoyal Borough of Greenwich

Last published check: 7 Oct 2026, 23:49. Check the council record for more recent changes.

Application location

BUILDING 2 AT GREENWICH PIER, CUTTY SARK GARDENS, GREENWICH

This record has no verified map location.

View council map

Application summary

Status
Registered
Application type
Full Planning Permission
Received
12 Feb 2026
Validated
2 Sept 2026
Determination deadline
Not published
Local authority
Royal Borough of Greenwich

Application overview

Retrospective addition of glazed enclosure to second floor roof terrace staircase platform and glazed enclosure to extended restaurant and bar area, addition of glazed screens to existing balustrades, heating and lighting equipment roof plant equipment, metal frame pergola structure and removable and retractable umbrella to the roof terrace, and relocation of roof ventilation plants, construction of a roof ventilation enclosure, installation of ventilation ductwork to the roof. (This may affect the setting of the surrounding Grade Listed Buildings and Monuments)

Proposal details

Reference
26/0451/F
Alternative references
PP-14696055
Ward
GREENWICH PARK
Parish
Greenwich
Agent
Russell Associates Architects

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 39 of 39

DocumentPublishedAction
CorrespondanceCorrespondence · PDF2 Sept 2026View
Proposed east and west elevationDrawing · PDF1 Sept 2026View
Proposed north elevationDrawing · PDF1 Sept 2026View
Proposed south elevationDrawing · PDF1 Sept 2026View
Proposed roof planDrawing · PDF1 Sept 2026View
Proposed second floor planDrawing · PDF1 Sept 2026View
Proposed first floor planDrawing · PDF1 Sept 2026View
Proposed ground floor planDrawing · PDF1 Sept 2026View
Existing west elevation with gates - as builtDrawing · PDF1 Sept 2026View
Existing west elevation - as originalDrawing · PDF1 Sept 2026View
Existing east and west elevation - as builtDrawing · PDF1 Sept 2026View
Existing east elevation & section b-b - as originalDrawing · PDF1 Sept 2026View
Existing north elevation - as builtDrawing · PDF1 Sept 2026View
Existing north elevation - as originalDrawing · PDF1 Sept 2026View
Existing south elevation - as builtDrawing · PDF1 Sept 2026View
Existing south elevation - as originalDrawing · PDF1 Sept 2026View
Existing roof plan - as builtDrawing · PDF1 Sept 2026View
Existing roof plan - as originalDrawing · PDF1 Sept 2026View
Existing second floor plan - as builtDrawing · PDF1 Sept 2026View
Existing second floor plan - as originalDrawing · PDF1 Sept 2026View
Existing first floor plan - as builtDrawing · PDF1 Sept 2026View
Existing first floor plan - as originalDrawing · PDF1 Sept 2026View
Existing ground floor plan - as builtDrawing · PDF1 Sept 2026View
Existing ground floor plan - as originalDrawing · PDF1 Sept 2026View
Location planDrawing · PDF13 Feb 2026View
Supporting and heritage statement. rev aDocument · PDF13 Feb 2026View
Existing site planDrawing · PDF13 Feb 2026View
Site photographsPhoto · PDF13 Feb 2026View
Site photographsPhoto · PDF13 Feb 2026View
Ptal reportDocument · PDF13 Feb 2026View
Environmental flood risk mapDocument · PDF13 Feb 2026View
Site photographsPhoto · PDF13 Feb 2026View
Zizzi western pavilion umbrellas drawingsDrawing · PDF13 Feb 2026View
P01-p02 east pavilion umbrellasDocument · PDF13 Feb 2026View
P01-p03 west pavilion pergola and parasolsDocument · PDF13 Feb 2026View
Fb eastern pavilion parasols drawings north and sectionDrawing · PDF13 Feb 2026View
Fb eastern pavilion parasols drawings south and eastDrawing · PDF13 Feb 2026View
Application form redactedApplication Form · PDF13 Feb 2026View
Fb eastern pavilion parasols drawings planDrawing · PDF13 Feb 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Standard Consultation Date

    Published milestoneCouncil source
  3. Application Validated

    Published milestoneCouncil source
  4. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.