An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with planning consent (24/0995/F) dated 27/11/2024 solely relating to phase 2 (Purpose Built Student Accommodation Phase) to allow: No increases to the overall height of the building or number of floors but clarification on the floor numbers to remove reference to mezzanines.Alterations to the building envelope, increasing by one full brick on all sides.Increase in Student rooms from 340 to 353;Increased number of accessible bedrooms/studios to meet requirements for inclusive design as required by condition 69.Reduction in cycle parking ratio from 0.75 spaces per bed to 0.5 spaces per bed resulting in 177 spaces for students, 4 no. spaces for staff, 10 e-bike spaces, and 9 no. external spaces for visitors.Internal alterations to cycle store locations and plant rooms spaces on levels 1, 2 and 3.Introduced green roof and external terrace on proposed level 3 for students with relocation of generator now placed internally within the building at level 1.Owing to the changes highlighted above and requested alterations to the wording to condition 68, the following conditions 2 (approved drawings), 3 (quantum of development), 4 (quantum of development ? height of buildings and floorspace), 54 (Fire Statement), 58 (Green/Brown Roofs and Walls) and 68 (Habitat Management and Monitoring Plan) will require amendments.

Phase 2, Located on the Corner of Boord Street and Dreadnought Street, Greenwich, SE10 0PF

RegisteredReference: 26/0319/NMRoyal Borough of Greenwich

Last published check: 8 Oct 2026, 10:31. Check the council record for more recent changes.

Application location

Phase 2, Located on the Corner of Boord Street and Dreadnought Street, Greenwich, SE10 0PF

This record has no verified map location.

View council map

Application summary

Status
Registered
Application type
Non Material
Received
2 Feb 2026
Validated
2 Feb 2026
Determination deadline
Not published
Local authority
Royal Borough of Greenwich

Application overview

An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with planning consent (24/0995/F) dated 27/11/2024 solely relating to phase 2 (Purpose Built Student Accommodation Phase) to allow: No increases to the overall height of the building or number of floors but clarification on the floor numbers to remove reference to mezzanines.Alterations to the building envelope, increasing by one full brick on all sides.Increase in Student rooms from 340 to 353;Increased number of accessible bedrooms/studios to meet requirements for inclusive design as required by condition 69.Reduction in cycle parking ratio from 0.75 spaces per bed to 0.5 spaces per bed resulting in 177 spaces for students, 4 no. spaces for staff, 10 e-bike spaces, and 9 no. external spaces for visitors.Internal alterations to cycle store locations and plant rooms spaces on levels 1, 2 and 3.Introduced green roof and external terrace on proposed level 3 for students with relocation of generator now placed internally within the building at level 1.Owing to the changes highlighted above and requested alterations to the wording to condition 68, the following conditions 2 (approved drawings), 3 (quantum of development), 4 (quantum of development ? height of buildings and floorspace), 54 (Fire Statement), 58 (Green/Brown Roofs and Walls) and 68 (Habitat Management and Monitoring Plan) will require amendments.

Proposal details

Reference
26/0319/NM
Alternative references
PP-14665261
Ward
GREENWICH PENINSULA
Parish
Greenwich
Agent
ROK Planning

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 65 of 65

DocumentPublishedAction
Officer reportReport · PDF8 Jul 2026View
Final draft deed of variationReport · PDF8 Jul 2026View
Amended - urban greening factor reportDocument · PDF3 Mar 2026View
Amended - combined bay studiesDrawing · PDF2 Mar 2026View
Amended - combined elevationsDrawing · PDF2 Mar 2026View
Amended - combined floorplansDrawing · PDF2 Mar 2026View
Amended - combined sectionsDrawing · PDF2 Mar 2026View
Amended - nma drawing registerDrawing · PDF2 Mar 2026View
Amended - amenity comparison scheduleDrawing · PDF2 Mar 2026View
Amended - area scheduleDrawing · PDF2 Mar 2026View
Amended - accommodation scheduleDrawing · PDF2 Mar 2026View
Amended - design and access statementDrawing · PDF2 Mar 2026View
Amended - refuse & recycling strategy planDrawing · PDF2 Mar 2026View
Amended - typical room type plansDrawing · PDF2 Mar 2026View
Amended - proposed site planDrawing · PDF2 Mar 2026View
Daylight and sunlight report (within development)Document · PDF9 Feb 2026View
Acknowledgement letterCorrespondence · PDF3 Feb 2026View
Energy statement addendumDocument · PDF3 Feb 2026View
Nma proposals comparisonDocument · PDF2 Feb 2026View
Design and access statement addendumSuperseded · PDF2 Feb 2026View
Amenity comparison scheduleSuperseded · PDF2 Feb 2026View
Application formApplication Form · PDF2 Feb 2026View
Landscaping - level 14, external terraceDrawing · PDF2 Feb 2026View
Landscaping - level 16, external terraceDrawing · PDF2 Feb 2026View
Urban greening factor reportSuperseded · PDF2 Feb 2026View
Landscaping - level 03, external terraceDrawing · PDF2 Feb 2026View
Area scheduleSuperseded · PDF2 Feb 2026View
Nma drawing registerSuperseded · PDF2 Feb 2026View
West elevation bay studySuperseded · PDF2 Feb 2026View
Typical room type plansSuperseded · PDF2 Feb 2026View
South elevation bay studySuperseded · PDF2 Feb 2026View
East elevation bay studySuperseded · PDF2 Feb 2026View
Accommodation scheduleSuperseded · PDF2 Feb 2026View
Sw elevation - dreadnought streetSuperseded · PDF2 Feb 2026View
Se elevation - boord streetSuperseded · PDF2 Feb 2026View
Nw elevationSuperseded · PDF2 Feb 2026View
Ne elevation - marsh walkSuperseded · PDF2 Feb 2026View
Section bb - nw elevationSuperseded · PDF2 Feb 2026View
Section cc - se elevationSuperseded · PDF2 Feb 2026View
Ga plan - level 15Superseded · PDF2 Feb 2026View
Ga plan - level 16Superseded · PDF2 Feb 2026View
Ga plan - level 17Superseded · PDF2 Feb 2026View
Ga plan - level 18Superseded · PDF2 Feb 2026View
Ga plan - level 19 (roof)Superseded · PDF2 Feb 2026View
Proposed site planSuperseded · PDF2 Feb 2026View
Ga plan - level 09Superseded · PDF2 Feb 2026View
Ga plan - level 10Superseded · PDF2 Feb 2026View
Ga plan - level 11Superseded · PDF2 Feb 2026View
Ga plan - level 12Superseded · PDF2 Feb 2026View
Ga plan - level 13Superseded · PDF2 Feb 2026View
Ga plan - level 14Superseded · PDF2 Feb 2026View
Ga plan - level 03Superseded · PDF2 Feb 2026View
Ga plan - level 04Superseded · PDF2 Feb 2026View
Ga plan - level 05Superseded · PDF2 Feb 2026View
Ga plan - level 06Superseded · PDF2 Feb 2026View
Ga plan - level 07Superseded · PDF2 Feb 2026View
Ga plan - level 08Superseded · PDF2 Feb 2026View
Refuse & recycling strategy planSuperseded · PDF2 Feb 2026View
Operational waste and recycling management strategySuperseded · PDF2 Feb 2026View
Transport assessment addendumDocument · PDF2 Feb 2026View
Ga plan - level 00Superseded · PDF2 Feb 2026View
Ga plan - level 01Superseded · PDF2 Feb 2026View
Ga plan - level 02Superseded · PDF2 Feb 2026View
Cover letterDocument · PDF2 Feb 2026View
Fire statementDocument · PDF2 Feb 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.