Council planning record

Submission of details pursuant to part discharge of Condition 48 (Crossrail - Blocks D & K only) of planning permission reference 16/3025/MA dated 17/03/2017 as amended by application Ref. 24/0887/NM dated 12/06/2025.

The Ropeyards, Royal Arsenal Riverside, Blocks D and K3, K4 and K5, Land between Duke of Wellington Avenue and Beresford Street, London, SE18 6NP

DecidedReference: 26/0274/SDRoyal Borough of Greenwich

Application location

The Ropeyards, Royal Arsenal Riverside, Blocks D and K3, K4 and K5, Land between Duke of Wellington Avenue and Beresford Street, London, SE18 6NP

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Submission of Details 8 Weeks
Received
28 Jan 2026
Validated
28 Jan 2026
Determination deadline
Not published
Local authority
Royal Borough of Greenwich

Application overview

Submission of details pursuant to part discharge of Condition 48 (Crossrail - Blocks D & K only) of planning permission reference 16/3025/MA dated 17/03/2017 as amended by application Ref. 24/0887/NM dated 12/06/2025.

Proposal details

Reference
26/0274/SD
Alternative references
PP-14629190
Ward
WOOLWICH ARSENAL
Parish
Woolwich & Thamesmead

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 23 of 23

DocumentPublishedAction
Decision noticeDecision Notice · PDF30 Jun 2026View
Royal arsenal riverside blocks d&k - method statement - rev d - 20.01.2026Document · PDF2 Mar 2026View
D&k risk assessment & method statement rev 002Document · PDF2 Mar 2026View
CorrespondanceCorrespondence · PDF4 Feb 2026View
Schedule of condition of the elizabeth lineDocument · PDF28 Jan 2026View
3d correlation surveyDrawing · PDF28 Jan 2026View
Ground movement assessment of elizabeth line tunnelsDocument · PDF28 Jan 2026View
Structural design intent - d blocksDocument · PDF28 Jan 2026View
Cfa piles: load bearing design calculations block dDocument · PDF28 Jan 2026View
Cfa piles: load bearing design calculations block kDocument · PDF28 Jan 2026View
Cover letterDocument · PDF28 Jan 2026View
Application form redactedApplication Form · PDF28 Jan 2026View
Block d piling layout zone 4Drawing · PDF28 Jan 2026View
Block d pile schedule sheet 01Drawing · PDF28 Jan 2026View
Block d pile schedule sheet 02Drawing · PDF28 Jan 2026View
Blocks k3 to k5 piling layoutDrawing · PDF28 Jan 2026View
Blocks k3 to k5 pile scheduleDrawing · PDF28 Jan 2026View
Blocks d & k cannon piling method statementDocument · PDF28 Jan 2026View
Structural design intent - k blocksDocument · PDF28 Jan 2026View
Specification for piling and embedded retaining wallsDocument · PDF28 Jan 2026View
Block d piling layout zone 1Drawing · PDF28 Jan 2026View
Block d piling layout zone 2Drawing · PDF28 Jan 2026View
Block d piling layout zone 3Drawing · PDF28 Jan 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Decision Issued Date

    Published milestoneCouncil source
  8. Decision Made Date

    Published milestoneCouncil source
  9. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve
Decision notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.