Council planning record

The proposed installation of Air Source Heat Pumps in the eastern portion of Building 10, specifically within the commercial floorspace in units 9 and 10, previously approved under planning permission 21/2056/L, with other associated works to the internal and external elements of the building, to support the decarbonisation of the existing energy centre as part of the overall strategy for Royal Arsenal Riverside.

Building 10, Station Way, Royal Arsenal Riverside, Woolwich

DecidedReference: 25/4135/LRoyal Borough of Greenwich

Application location

Building 10, Station Way, Royal Arsenal Riverside, Woolwich

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Listed Building Consent
Received
9 Dec 2025
Validated
9 Dec 2025
Determination deadline
Not published
Local authority
Royal Borough of Greenwich

Application overview

The proposed installation of Air Source Heat Pumps in the eastern portion of Building 10, specifically within the commercial floorspace in units 9 and 10, previously approved under planning permission 21/2056/L, with other associated works to the internal and external elements of the building, to support the decarbonisation of the existing energy centre as part of the overall strategy for Royal Arsenal Riverside.

Proposal details

Reference
25/4135/L
Alternative references
PP-14523146
Ward
WOOLWICH ARSENAL
Parish
Woolwich & Thamesmead
Agent
Stantec UK Limited

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 47 of 47

DocumentPublishedAction
Published addendum - ref 254134f 254135lReport · PDF16 Apr 2026View
Published appendices - ref 254134f 254135l.Report · PDF16 Apr 2026View
Published main report - ref 254134f 254135l.Report · PDF16 Apr 2026View
Decision noticeDecision Notice · PDF16 Apr 2026View
CorrespondanceCorrespondence · PDF9 Jan 2026View
Transport technical noteDocument · PDF7 Jan 2026View
Site location planDrawing · PDF10 Dec 2025View
Design and access statement - part 2Document · PDF10 Dec 2025View
Energy centre, existing plan, level 01Drawing · PDF10 Dec 2025View
Site wide, proposed site plan, roof levelDrawing · PDF10 Dec 2025View
Design and access statement - part 1Document · PDF10 Dec 2025View
Energy centre, existing plan, level 00Drawing · PDF10 Dec 2025View
Energy centre, escape strategy plan, level 01Drawing · PDF10 Dec 2025View
Energy centre, escape strategy plan, level 00Drawing · PDF10 Dec 2025View
Energy centre, details, sheet 1Drawing · PDF10 Dec 2025View
Energy centre, existing elevations, sheet 1Drawing · PDF10 Dec 2025View
Energy centre, escape strategy plan, level 02Drawing · PDF10 Dec 2025View
Energy centre, existing sections, sheet 1Drawing · PDF10 Dec 2025View
Energy centre, details, sheet 2Drawing · PDF10 Dec 2025View
Energy centre, existing plan, roof levelDrawing · PDF10 Dec 2025View
Energy centre, proposed plan, level 00Drawing · PDF10 Dec 2025View
Energy centre, demolition elevations, sheet 1Drawing · PDF10 Dec 2025View
Energy centre, proposed plan roof levelDrawing · PDF10 Dec 2025View
Energy centre, demolition plans, level 01Drawing · PDF10 Dec 2025View
Energy centre, proposed plan, level 01Drawing · PDF10 Dec 2025View
Energy centre, demolition plan roof levelDrawing · PDF10 Dec 2025View
Energy centre, proposed plan level 02Drawing · PDF10 Dec 2025View
Energy centre, demolition plans, level 00Drawing · PDF10 Dec 2025View
Covering letterDocument · PDF10 Dec 2025View
Energy and heat network decarbonisation reportDocument · PDF10 Dec 2025View
Energy centre, proposed sectionsDrawing · PDF10 Dec 2025View
Planning statementDocument · PDF10 Dec 2025View
Site wide, proposed elevations, sheet 1Drawing · PDF10 Dec 2025View
Heritage statementDocument · PDF10 Dec 2025View
Energy centre, proposed elevationsDrawing · PDF10 Dec 2025View
Fire statementDocument · PDF10 Dec 2025View
Drainage strategy part 2Document · PDF10 Dec 2025View
Statement of community involvementDocument · PDF10 Dec 2025View
Noise impact assessmentDocument · PDF10 Dec 2025View
Air quality assessmentDocument · PDF10 Dec 2025View
Drainage strategy part 1Document · PDF10 Dec 2025View
Preliminary ecology assessment and bngDocument · PDF10 Dec 2025View
Materials specification for replacement featuresDocument · PDF10 Dec 2025View
Application form redactedDocument · PDF10 Dec 2025View
Structural report - part 2Document · PDF10 Dec 2025View
Structural report - part 1Document · PDF10 Dec 2025View
Schedule of works and method statementDocument · PDF10 Dec 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Actual Committee Date

    Published milestoneCouncil source
  8. Decision Issued Date

    Published milestoneCouncil source
  9. Decision Made Date

    Published milestoneCouncil source
  10. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve
Decision notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.