Council planning record

An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with planning consent (24/0995/F) dated 27/11/2024 solely relating to phase 2 (Purpose Built Student Accommodation Phase) to allow:Design alterations to the central circulation core to comply with fire regulations;Minor alteration to accommodation mix, on Levels 15-17 to provide three premium studios.Reconfiguration of several rooms to ensure all cluster bedrooms to achieve a minimum area of 13sqm for cluster bedrooms.Addition of louvres and grills to elevation at lower levels for the ventilation to ensure compliance with building regulations Part L and Part O.Relocation of the back-up generator form Level 17 to the second-floor terrace in response to feedback from the London Fire Brigade.Minor external changes to the building envelope and fenestration in response to the internal layout updates to include some wider windows and a narrow brick pier detail to provide visual interest and maintain narrow vertical bays for glazing.Addition of permeable paving and areas of intensive green roof at Levels 18 and 2, along with more raised planting, small multi-stem trees and pergolas with vertical greening at Level 13 and 15.Minor alignment of the South-East elevation to widen the building at high level only to accommodate the core redesign and minor internal layout changes. Owing to the changes highlighted above, conditions 2 (approved drawings), 15 (Unsuspected Contamination), 26 (Wheelchair Units), 30 (Wind Mitigation), 36 (Foul Water Capacity), 37 (Clean Water Infrastructure), 44 (Non-residential space), 54 (Fire Statement) and 58 (Green/Brown Roofs and Walls) will require amendments and a new condition added to cover inclusive design for this PBSA phase.

Phase 2, Located on the Corner of Boord Street and Dreadnought Street, Greenwich, SE10 0PF

DecidedReference: 25/3952/NMRoyal Borough of Greenwich

Last published check: 10 Oct 2026, 22:30. Check the council record for more recent changes.

Application location

Phase 2, Located on the Corner of Boord Street and Dreadnought Street, Greenwich, SE10 0PF

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Non Material
Received
24 Nov 2025
Validated
25 Nov 2025
Determination deadline
Not published
Local authority
Royal Borough of Greenwich

Application overview

An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with planning consent (24/0995/F) dated 27/11/2024 solely relating to phase 2 (Purpose Built Student Accommodation Phase) to allow:Design alterations to the central circulation core to comply with fire regulations;Minor alteration to accommodation mix, on Levels 15-17 to provide three premium studios.Reconfiguration of several rooms to ensure all cluster bedrooms to achieve a minimum area of 13sqm for cluster bedrooms.Addition of louvres and grills to elevation at lower levels for the ventilation to ensure compliance with building regulations Part L and Part O.Relocation of the back-up generator form Level 17 to the second-floor terrace in response to feedback from the London Fire Brigade.Minor external changes to the building envelope and fenestration in response to the internal layout updates to include some wider windows and a narrow brick pier detail to provide visual interest and maintain narrow vertical bays for glazing.Addition of permeable paving and areas of intensive green roof at Levels 18 and 2, along with more raised planting, small multi-stem trees and pergolas with vertical greening at Level 13 and 15.Minor alignment of the South-East elevation to widen the building at high level only to accommodate the core redesign and minor internal layout changes. Owing to the changes highlighted above, conditions 2 (approved drawings), 15 (Unsuspected Contamination), 26 (Wheelchair Units), 30 (Wind Mitigation), 36 (Foul Water Capacity), 37 (Clean Water Infrastructure), 44 (Non-residential space), 54 (Fire Statement) and 58 (Green/Brown Roofs and Walls) will require amendments and a new condition added to cover inclusive design for this PBSA phase.

Proposal details

Reference
25/3952/NM
Alternative references
PP-14486745
Ward
GREENWICH PENINSULA
Agent
ROK Planning

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 61 of 61

DocumentPublishedAction
Decision noticeDecision Notice · PDF9 Jan 2026View
ReportsReport · PDF9 Jan 2026View
Amended - south elevation bay studyDocument · PDF8 Jan 2026View
Amended - east elevation bay studyDocument · PDF8 Jan 2026View
Amended - ne elevation - marsh walkDocument · PDF8 Jan 2026View
Nma proposals - appendix aDocument · PDF8 Jan 2026View
West elevation bay studyDrawing · PDF8 Jan 2026View
Amended - accommodation scheculeDocument · PDF24 Dec 2025View
Amended - amenity area comparison scheduleDocument · PDF24 Dec 2025View
Amended - area scheduleDocument · PDF24 Dec 2025View
Amended - design and access statementDocument · PDF24 Dec 2025View
Amended - daylight and sunlight report (within development)Document · PDF24 Dec 2025View
Amended - combined landscaping roof terrace plansDrawing · PDF24 Dec 2025View
Amended - nma proposals comparisonDocument · PDF24 Dec 2025View
Amended - ugf reportDocument · PDF24 Dec 2025View
Amended - proposed site planDrawing · PDF24 Dec 2025View
Amended - combined floor plansDrawing · PDF24 Dec 2025View
Amended - typical room type plansDrawing · PDF24 Dec 2025View
Amended - combined elevationsDrawing · PDF24 Dec 2025View
Amended - combined sectionsDrawing · PDF24 Dec 2025View
CorrespondanceCorrespondence · PDF25 Nov 2025View
Ga plan - level 03Superseded · PDF24 Nov 2025View
Urban greening factor documentSuperseded · PDF24 Nov 2025View
Ga plan - level 04Superseded · PDF24 Nov 2025View
Ga plan - level 11Superseded · PDF24 Nov 2025View
Ga plan - level 07Superseded · PDF24 Nov 2025View
Ga plan - level 05Superseded · PDF24 Nov 2025View
Ga plan - level 09Superseded · PDF24 Nov 2025View
Ga plan - level 12Superseded · PDF24 Nov 2025View
Ga plan - level 08Superseded · PDF24 Nov 2025View
Ga plan - level 06Superseded · PDF24 Nov 2025View
Ga plan - level 10Superseded · PDF24 Nov 2025View
Proposed site planSuperseded · PDF24 Nov 2025View
Ga plan - level 15Superseded · PDF24 Nov 2025View
Ga plan - level 13Superseded · PDF24 Nov 2025View
Ga plan - level 17Superseded · PDF24 Nov 2025View
Sw elevation - dreadnought streetSuperseded · PDF24 Nov 2025View
Ga plan - level 16Superseded · PDF24 Nov 2025View
Ga plan - level 14Superseded · PDF24 Nov 2025View
Ga plan - level 18 (roof)Superseded · PDF24 Nov 2025View
Design and access statement - addendumSuperseded · PDF24 Nov 2025View
Ne elevation - marsh walkSuperseded · PDF24 Nov 2025View
Se elevation - boord streetSuperseded · PDF24 Nov 2025View
Section cc - se elevationSuperseded · PDF24 Nov 2025View
Proposed accomodation scheduleSuperseded · PDF24 Nov 2025View
Section bb - nw elevationSuperseded · PDF24 Nov 2025View
Nw elevationSuperseded · PDF24 Nov 2025View
Typical room typesSuperseded · PDF24 Nov 2025View
Ga plan - level 02Superseded · PDF24 Nov 2025View
Gea and gia floorplan detailsSuperseded · PDF24 Nov 2025View
Ga plan - level 01Superseded · PDF24 Nov 2025View
Nma proposals comparison - part 2Superseded · PDF24 Nov 2025View
Ga plan - level 00Superseded · PDF24 Nov 2025View
Nma drawing registerSuperseded · PDF24 Nov 2025View
Ga plan - level 01 mezzSuperseded · PDF24 Nov 2025View
Nma proposals comparison - part 1Superseded · PDF24 Nov 2025View
Application formApplication Form · PDF24 Nov 2025View
Daylight compliance letterSuperseded · PDF24 Nov 2025View
Cover letterDocument · PDF24 Nov 2025View
Fire safety letterDocument · PDF24 Nov 2025View
Wind compliance letterDocument · PDF24 Nov 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Standard Consultation Date

    Published milestoneCouncil source
  3. Application Validated

    Published milestoneCouncil source
  4. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Decision Made Date

    Published milestoneCouncil source

Decision & conditions

Approve
Decision notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.