Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Phase 2, Located on the Corner of Boord Street and Dreadnought Street, Greenwich, SE10 0PF
Last published check: 10 Oct 2026, 22:30. Check the council record for more recent changes.
Phase 2, Located on the Corner of Boord Street and Dreadnought Street, Greenwich, SE10 0PF
This record has no verified map location.
View council mapAn application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with planning consent (24/0995/F) dated 27/11/2024 solely relating to phase 2 (Purpose Built Student Accommodation Phase) to allow:Design alterations to the central circulation core to comply with fire regulations;Minor alteration to accommodation mix, on Levels 15-17 to provide three premium studios.Reconfiguration of several rooms to ensure all cluster bedrooms to achieve a minimum area of 13sqm for cluster bedrooms.Addition of louvres and grills to elevation at lower levels for the ventilation to ensure compliance with building regulations Part L and Part O.Relocation of the back-up generator form Level 17 to the second-floor terrace in response to feedback from the London Fire Brigade.Minor external changes to the building envelope and fenestration in response to the internal layout updates to include some wider windows and a narrow brick pier detail to provide visual interest and maintain narrow vertical bays for glazing.Addition of permeable paving and areas of intensive green roof at Levels 18 and 2, along with more raised planting, small multi-stem trees and pergolas with vertical greening at Level 13 and 15.Minor alignment of the South-East elevation to widen the building at high level only to accommodate the core redesign and minor internal layout changes. Owing to the changes highlighted above, conditions 2 (approved drawings), 15 (Unsuspected Contamination), 26 (Wheelchair Units), 30 (Wind Mitigation), 36 (Foul Water Capacity), 37 (Clean Water Infrastructure), 44 (Non-residential space), 54 (Fire Statement) and 58 (Green/Brown Roofs and Walls) will require amendments and a new condition added to cover inclusive design for this PBSA phase.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Decision noticeDecision Notice · PDF | 9 Jan 2026 | View |
| ReportsReport · PDF | 9 Jan 2026 | View |
| Amended - south elevation bay studyDocument · PDF | 8 Jan 2026 | View |
| Amended - east elevation bay studyDocument · PDF | 8 Jan 2026 | View |
| Amended - ne elevation - marsh walkDocument · PDF | 8 Jan 2026 | View |
| Nma proposals - appendix aDocument · PDF | 8 Jan 2026 | View |
| West elevation bay studyDrawing · PDF | 8 Jan 2026 | View |
| Amended - accommodation scheculeDocument · PDF | 24 Dec 2025 | View |
| Amended - amenity area comparison scheduleDocument · PDF | 24 Dec 2025 | View |
| Amended - area scheduleDocument · PDF | 24 Dec 2025 | View |
| Amended - design and access statementDocument · PDF | 24 Dec 2025 | View |
| Amended - daylight and sunlight report (within development)Document · PDF | 24 Dec 2025 | View |
| Amended - combined landscaping roof terrace plansDrawing · PDF | 24 Dec 2025 | View |
| Amended - nma proposals comparisonDocument · PDF | 24 Dec 2025 | View |
| Amended - ugf reportDocument · PDF | 24 Dec 2025 | View |
| Amended - proposed site planDrawing · PDF | 24 Dec 2025 | View |
| Amended - combined floor plansDrawing · PDF | 24 Dec 2025 | View |
| Amended - typical room type plansDrawing · PDF | 24 Dec 2025 | View |
| Amended - combined elevationsDrawing · PDF | 24 Dec 2025 | View |
| Amended - combined sectionsDrawing · PDF | 24 Dec 2025 | View |
| CorrespondanceCorrespondence · PDF | 25 Nov 2025 | View |
| Ga plan - level 03Superseded · PDF | 24 Nov 2025 | View |
| Urban greening factor documentSuperseded · PDF | 24 Nov 2025 | View |
| Ga plan - level 04Superseded · PDF | 24 Nov 2025 | View |
| Ga plan - level 11Superseded · PDF | 24 Nov 2025 | View |
| Ga plan - level 07Superseded · PDF | 24 Nov 2025 | View |
| Ga plan - level 05Superseded · PDF | 24 Nov 2025 | View |
| Ga plan - level 09Superseded · PDF | 24 Nov 2025 | View |
| Ga plan - level 12Superseded · PDF | 24 Nov 2025 | View |
| Ga plan - level 08Superseded · PDF | 24 Nov 2025 | View |
| Ga plan - level 06Superseded · PDF | 24 Nov 2025 | View |
| Ga plan - level 10Superseded · PDF | 24 Nov 2025 | View |
| Proposed site planSuperseded · PDF | 24 Nov 2025 | View |
| Ga plan - level 15Superseded · PDF | 24 Nov 2025 | View |
| Ga plan - level 13Superseded · PDF | 24 Nov 2025 | View |
| Ga plan - level 17Superseded · PDF | 24 Nov 2025 | View |
| Sw elevation - dreadnought streetSuperseded · PDF | 24 Nov 2025 | View |
| Ga plan - level 16Superseded · PDF | 24 Nov 2025 | View |
| Ga plan - level 14Superseded · PDF | 24 Nov 2025 | View |
| Ga plan - level 18 (roof)Superseded · PDF | 24 Nov 2025 | View |
| Design and access statement - addendumSuperseded · PDF | 24 Nov 2025 | View |
| Ne elevation - marsh walkSuperseded · PDF | 24 Nov 2025 | View |
| Se elevation - boord streetSuperseded · PDF | 24 Nov 2025 | View |
| Section cc - se elevationSuperseded · PDF | 24 Nov 2025 | View |
| Proposed accomodation scheduleSuperseded · PDF | 24 Nov 2025 | View |
| Section bb - nw elevationSuperseded · PDF | 24 Nov 2025 | View |
| Nw elevationSuperseded · PDF | 24 Nov 2025 | View |
| Typical room typesSuperseded · PDF | 24 Nov 2025 | View |
| Ga plan - level 02Superseded · PDF | 24 Nov 2025 | View |
| Gea and gia floorplan detailsSuperseded · PDF | 24 Nov 2025 | View |
| Ga plan - level 01Superseded · PDF | 24 Nov 2025 | View |
| Nma proposals comparison - part 2Superseded · PDF | 24 Nov 2025 | View |
| Ga plan - level 00Superseded · PDF | 24 Nov 2025 | View |
| Nma drawing registerSuperseded · PDF | 24 Nov 2025 | View |
| Ga plan - level 01 mezzSuperseded · PDF | 24 Nov 2025 | View |
| Nma proposals comparison - part 1Superseded · PDF | 24 Nov 2025 | View |
| Application formApplication Form · PDF | 24 Nov 2025 | View |
| Daylight compliance letterSuperseded · PDF | 24 Nov 2025 | View |
| Cover letterDocument · PDF | 24 Nov 2025 | View |
| Fire safety letterDocument · PDF | 24 Nov 2025 | View |
| Wind compliance letterDocument · PDF | 24 Nov 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
No related records were published in this section.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.