Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
16-18 BALLAST QUAY, LONDON, SE10 9PD
16-18 BALLAST QUAY, LONDON, SE10 9PD
This record has no verified map location.
View council mapRefurbishment of 16 and 18 Ballast Quay, where No.16 is Grade II listed and No.18 is locally listed. Works include the removal, installation and replacement of multiple new and existing non-original windows and doors with higher-performance timber units that match existing proportions and appearance and meet modern standards, installation of an external alarm box, opening up of the ceilings of both properties with roofs insulated and installation of rooflights, installation of a compact condenser, extension of rear juliet balcony balustrade, relocation of the garden spiral stair, rear elevation access amendments, and all associated works.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| ReportsReport · PDF | 1 May 2026 | View |
| Decision noticeDecision Notice · PDF | 1 May 2026 | View |
| Ground floor window replacement schedule 3Drawing · PDF | 21 Apr 2026 | View |
| Proposed windows & doors specificatiDocument · PDF | 21 Apr 2026 | View |
| Box sash window specDrawing · PDF | 7 Apr 2026 | View |
| Ground floor window replacement schedule 1Drawing · PDF | 7 Apr 2026 | View |
| Ground floor window replacement schedule 2Drawing · PDF | 7 Apr 2026 | View |
| 1st floor window replacement schedule 1Drawing · PDF | 7 Apr 2026 | View |
| 2nd floor window replacement schedule 2Drawing · PDF | 7 Apr 2026 | View |
| 2nd floor window replacement schedule 1Document · PDF | 7 Apr 2026 | View |
| Flood risk assessmentDocument · PDF | 15 Jan 2026 | View |
| CorrespondanceCorrespondence · PDF | 15 Jan 2026 | View |
| Schedule of works and method statementDocument · PDF | 22 Dec 2025 | View |
| Proposed condenser specificationDocument · PDF | 22 Dec 2025 | View |
| Proposed alarm box specificationDocument · PDF | 22 Dec 2025 | View |
| Reasonable exemption statementDocument · PDF | 22 Dec 2025 | View |
| Existing windows & doors conditions reportDocument · PDF | 22 Dec 2025 | View |
| Proposed second floor bedroom 04 & wc04 elevationsDrawing · PDF | 22 Dec 2025 | View |
| Proposed first floor studio elevationsDrawing · PDF | 22 Dec 2025 | View |
| Proposed first floor studio, utility & wc03 elevationsDrawing · PDF | 22 Dec 2025 | View |
| Proposed ground floor kitchen & living room elevationsDrawing · PDF | 22 Dec 2025 | View |
| Proposed ground floor bedroom 01 & kitchen elevationsDrawing · PDF | 22 Dec 2025 | View |
| Proposed wc 01 elevationsDrawing · PDF | 22 Dec 2025 | View |
| Proposed bedroom 03 & corridor elevationsDrawing · PDF | 22 Dec 2025 | View |
| Proposed bedroom 02 elevationsDrawing · PDF | 22 Dec 2025 | View |
| Existing second floor bedroom 04 & wc04 elevationsDrawing · PDF | 22 Dec 2025 | View |
| Existing first floor studio elevationsDrawing · PDF | 22 Dec 2025 | View |
| Existing first floor kitchen & living room elevationsDrawing · PDF | 22 Dec 2025 | View |
| Existing ground floor wc01 & bedroom 01 elevationsDrawing · PDF | 22 Dec 2025 | View |
| Existing ground floor studio & wc01 elevationsDrawing · PDF | 22 Dec 2025 | View |
| Existing wc 02, laundry, mudroom elevationsDrawing · PDF | 22 Dec 2025 | View |
| Existing bedroom 03 & corridor elevationsDrawing · PDF | 22 Dec 2025 | View |
| Existing bedroom 02 elevationsDrawing · PDF | 22 Dec 2025 | View |
| Proposed roof planDrawing · PDF | 22 Dec 2025 | View |
| Existing roof planDrawing · PDF | 22 Dec 2025 | View |
| Site block planDrawing · PDF | 24 Nov 2025 | View |
| Site location planDrawing · PDF | 24 Nov 2025 | View |
| Site location plan 2Drawing · PDF | 24 Nov 2025 | View |
| Existing basement floor planDrawing · PDF | 24 Nov 2025 | View |
| Existing ground floor planDrawing · PDF | 24 Nov 2025 | View |
| Existing section a-a to e-eDrawing · PDF | 24 Nov 2025 | View |
| Existing east, west and south west elevationsDrawing · PDF | 24 Nov 2025 | View |
| Existing first floor planDrawing · PDF | 24 Nov 2025 | View |
| Existing north and south elevationsDrawing · PDF | 24 Nov 2025 | View |
| Proposed basement floor planDrawing · PDF | 24 Nov 2025 | View |
| Proposed ground floor planDrawing · PDF | 24 Nov 2025 | View |
| Existing second floor planDrawing · PDF | 24 Nov 2025 | View |
| Alteration basement floor planDrawing · PDF | 24 Nov 2025 | View |
| Proposed section a-a to e-eDrawing · PDF | 24 Nov 2025 | View |
| Proposed second floor planDrawing · PDF | 24 Nov 2025 | View |
| Alteration ground floor planDrawing · PDF | 24 Nov 2025 | View |
| Proposed east, west and south west elevationsDrawing · PDF | 24 Nov 2025 | View |
| Alteration first floor planDrawing · PDF | 24 Nov 2025 | View |
| Proposed north and south elevationsDrawing · PDF | 24 Nov 2025 | View |
| Alteration second floor planDrawing · PDF | 24 Nov 2025 | View |
| Ground floor door replacement schedule 1Drawing · PDF | 24 Nov 2025 | View |
| First floor door replacement schedule 2Drawing · PDF | 24 Nov 2025 | View |
| Application form redactedApplication Form · PDF | 24 Nov 2025 | View |
| Design and access statementDocument · PDF | 24 Nov 2025 | View |
| Proposed first floor planDrawing · PDF | 24 Nov 2025 | View |
| Heritage impact assessmentDocument · PDF | 24 Nov 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.