Council planning record

Phased development comprising partial demolition and alterations, including station concourse, trainsheds, and truss/columns, demolition of 50 Liverpool Street, demolition of Bishopsgate Square entrance and Hope Square entrance; works to Sun Street Passage; Works of reconstruction and remodelling of station basement, lower and upper concourse levels, new station columns/truss and roof (in part); introduction of new lifts, escalators and stairs and service spine at basement; increased operational space; insertion of new ticket gates; creation of new station entrances from Hope Square and Bishopsgate Square; creation of new units at lower and upper concourse levels for Class E (shops, cafe, restaurants),hot food takeaway (Sui Generis) and pub/bar (Sui Generis); creation of new upper concourses and associated new public access from Exchange Square including new walkways; provision of over-station development reaching a maximum height of 97.67m AOD to accommodate Class E use (commercial, service and business); and creation of an auditorium (Sui Generis) at Level 18 with ancillary terrace; creation of a public amenity terrace (Sui Generis) at Level 18 with access from Hope Square entrance; provision of private office terraces; provision of cycle parking and associated access ramp, servicing, refuse and ancillary plant; alterations to pedestrian and vehicular access including provision of new ramp; public realm works to Hope Square and Bishopsgate Square; and associated works.

Liverpool Street Station, Liverpool Street, EC2M 7PY; Andaz Hotel, 40 Liverpool Street, EC2M 7QN; and 50 Liverpool Street, EC2M 7PY

DecidedReference: 25/1867/KRoyal Borough of Greenwich

Last published check: 8 Oct 2026, 14:40. Check the council record for more recent changes.

Application location

Liverpool Street Station, Liverpool Street, EC2M 7PY; Andaz Hotel, 40 Liverpool Street, EC2M 7QN; and 50 Liverpool Street, EC2M 7PY

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Consultation by other Borough\LDDC
Received
5 Jun 2025
Validated
5 Jun 2025
Determination deadline
Not published
Local authority
Royal Borough of Greenwich

Application overview

Phased development comprising partial demolition and alterations, including station concourse, trainsheds, and truss/columns, demolition of 50 Liverpool Street, demolition of Bishopsgate Square entrance and Hope Square entrance; works to Sun Street Passage; Works of reconstruction and remodelling of station basement, lower and upper concourse levels, new station columns/truss and roof (in part); introduction of new lifts, escalators and stairs and service spine at basement; increased operational space; insertion of new ticket gates; creation of new station entrances from Hope Square and Bishopsgate Square; creation of new units at lower and upper concourse levels for Class E (shops, cafe, restaurants),hot food takeaway (Sui Generis) and pub/bar (Sui Generis); creation of new upper concourses and associated new public access from Exchange Square including new walkways; provision of over-station development reaching a maximum height of 97.67m AOD to accommodate Class E use (commercial, service and business); and creation of an auditorium (Sui Generis) at Level 18 with ancillary terrace; creation of a public amenity terrace (Sui Generis) at Level 18 with access from Hope Square entrance; provision of private office terraces; provision of cycle parking and associated access ramp, servicing, refuse and ancillary plant; alterations to pedestrian and vehicular access including provision of new ramp; public realm works to Hope Square and Bishopsgate Square; and associated works.

Proposal details

Reference
25/1867/K
Ward
Out of Borough
Agent
City of London

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 2 of 2

DocumentPublishedAction
CorrespondanceCorrespondence · PDF10 Jun 2025View
City of london correspondenceCorrespondence9 Jun 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Decision Made Date

    Published milestoneCouncil source

Decision & conditions

Not Required
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.