T1 - Cupressus arizonica: Remove tree Reason: Tree is in poor structural condition, with the crown splaying out and patches of dieback. T2 - Olive: Reduce the tree to a pollard framework at approx. 1.5m from ground level. Remove the slender central stem (as directed). The aim is to create a framework which can be used for the future management of the tree with a ?cloud structure?. N.B. With any hard pruning there is a chance that the tree may die. However, the current basal growth and epicormic growth within the crown is an indication that the tree will respond well. T3 - Bay: Reduce the lateral spread by 50-70cm and trim the height to provide a domed shape. T4 - Copper beech: Trim (using hedge trimmers) to remove the current and previous seasons growth, retaining the domed shape.
T1 - Cupressus arizonica: Remove tree Reason: Tree is in poor structural condition, with the crown splaying out and patches of dieback. T2 - Olive: Reduce the tree to a pollard framework at approx. 1.5m from ground level. Remove the slender central stem (as directed). The aim is to create a framework which can be used for the future management of the tree with a ?cloud structure?. N.B. With any hard pruning there is a chance that the tree may die. However, the current basal growth and epicormic growth within the crown is an indication that the tree will respond well. T3 - Bay: Reduce the lateral spread by 50-70cm and trim the height to provide a domed shape. T4 - Copper beech: Trim (using hedge trimmers) to remove the current and previous seasons growth, retaining the domed shape.
Reference
23/2580/TC
Alternative references
PP-12365985
Ward
BLACKHEATH WESTCOMBE
Parish
Greenwich
Agent
Tree Craft Ltd
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.