To temporarily remove timber cladding, door and frame from second floor WC water tank enclosure to allow for removal of existing, non-original galvanised water tank due to corrosion and possible Legionella growth; and replace with new compliant water tank, on new timber joists and ply sheeting, together with all associated works. Timber cladding, door and frame to be re-instated on completion of the tank installation and connection.
To temporarily remove timber cladding, door and frame from second floor WC water tank enclosure to allow for removal of existing, non-original galvanised water tank due to corrosion and possible Legionella growth; and replace with new compliant water tank, on new timber joists and ply sheeting, together with all associated works. Timber cladding, door and frame to be re-instated on completion of the tank installation and connection.
Reference
22/2543/CLPL
Alternative references
email
Ward
CHARLTON VILLAGE & RIVERSIDE
Parish
Woolwich & Thamesmead
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.