An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with the planning permission 20/0456/F, dated�20/07/2020�for the Replacement of HPL & ACM cladding with TFC cladding, and the following:Replacing the HPL and ACM with Rockpanel A2 Fs-xtra (RAL 7038) cladding panels, as opposed to So-Tech.Replacement of the EWI render to the south elevation with an equivalent non-combustible Weatherby system (Colour: 0500N).Amendment also includes the demolition of the fair faced brickwork to the north and east elevations and replacement with a matching brick, inclusive of cavity barriers and non-combustible insulation. Brickwork to be replaced in Staffordshire Smooth Blue to match existing.
THEATRO TOWER, CREEK ROAD, DEPTFORD, LONDON, SE8 3FD
An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with the planning permission 20/0456/F, dated�20/07/2020�for the Replacement of HPL & ACM cladding with TFC cladding, and the following:Replacing the HPL and ACM with Rockpanel A2 Fs-xtra (RAL 7038) cladding panels, as opposed to So-Tech.Replacement of the EWI render to the south elevation with an equivalent non-combustible Weatherby system (Colour: 0500N).Amendment also includes the demolition of the fair faced brickwork to the north and east elevations and replacement with a matching brick, inclusive of cavity barriers and non-combustible insulation. Brickwork to be replaced in Staffordshire Smooth Blue to match existing.
Reference
22/1711/NM
Alternative references
PP-11267334
Ward
GREENWICH CREEKSIDE
Parish
Greenwich
Agent
Consult Construct Ltd
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.