Formal application to part discharge Requirement 8 (Surface Water Drainage) under Schedule 2, Part 2 of the Silvertown Tunnel Order 2018 as they relate to the permanent drainage design in the vicinity of the proposed Boord Street footbridge works (Work No. 11 (b) and (c) in Schedule 1 of the Order) only.
Formal application to part discharge Requirement 8 (Surface Water Drainage) under Schedule 2, Part 2 of the Silvertown Tunnel Order 2018 as they relate to the permanent drainage design in the vicinity of the proposed Boord Street footbridge works (Work No. 11 (b) and (c) in Schedule 1 of the Order) only.
Reference
22/1022/G
Ward
PENINSULA - NO LONGER EXISTS
Parish
Greenwich
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.