ApprovedCouncil status: Decided

Formal application to part discharge Requirement 8 (Surface Water Drainage) under Schedule 2, Part 2 of the Silvertown Tunnel Order 2018 as they relate to the permanent drainage design in the vicinity of the proposed Boord Street footbridge works (Work No. 11 (b) and (c) in Schedule 1 of the Order) only.

SILVERTOWN TUNNEL, LONDON, SE10

Royal Borough of GreenwichReference 22/1022/GDevelopment by Govt Dept/Stat.Und.

Open council website

Status and dates

Last published check: 24 Nov 2026, 19:04 (UK)

  1. DoneReceived23 Mar 2022
  2. DoneValidated11 Apr 2022
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedApprove25 Apr 2023

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (9)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Decision Issued Date

    Published milestoneCouncil source
  8. Decision Made Date

    Published milestoneCouncil source
Application type
Development by Govt Dept/Stat.Und.
Ward
PENINSULA - NO LONGER EXISTS
Parish
Greenwich
Documents
7 published

Proposal

Formal application to part discharge Requirement 8 (Surface Water Drainage) under Schedule 2, Part 2 of the Silvertown Tunnel Order 2018 as they relate to the permanent drainage design in the vicinity of the proposed Boord Street footbridge works (Work No. 11 (b) and (c) in Schedule 1 of the Order) only.

Reference
22/1022/G
Ward
PENINSULA - NO LONGER EXISTS
Parish
Greenwich

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • ReportsReport25 Apr 2023View
  • Decision noticeDecision Notice25 Apr 2023View
  • Covering letterDocument13 Apr 2022View
  • Drainage report.Document13 Apr 2022View
  • Covering letter - permanent surface water drainage (boord street area) - rbgDocument23 Mar 2022View
  • Drawing pack - permanent drainage in vicinity of boord st footbridgeDrawing23 Mar 2022View
  • St150030-aru-drg-zz-zz-rpt-dr-0002Document23 Mar 2022View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approve
Decision notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.