Status on council recordCouncil status: Decided

Marine related works include:1) removal of existing concrete river wall (landward side of Thames Path) and replacement with a new sheet pile river wall (river side of the Thames Path) at the top of existing revetment structure;2) Construction of a new sheet pile wall on the river side of the existing retaining wall structure west of the Southern Warehouse;3) Removal of sections of existing revetment to compensate for the loss in river flood volume due to the new proposed sheet pile river wall;4) Creation of an intertidal planting terrace;5) Local repair works to the existing jetty and provision of a new boathouse for the Gloriana Rowbarge. There would be five new marine piles to be installed in the river to support the guide rails for the launch mechanism of the boat and to facilitate the maneouvring of the rowbarge.

Morden Wharf, SE10

Royal Borough of GreenwichReference 21/3614/KConsultation by other Borough\LDDC

Last published check: 4 Nov 2026, 01:57. Check the council record for more recent changes.

Open council website

Status and dates

Last published check: 4 Nov 2026, 01:57 (UK)

  1. DoneReceived5 Oct 2021
  2. DoneValidated5 Oct 2021
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedNot Required9 Jul 2026

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (5)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Decision Made Date

    Published milestoneCouncil source
Application type
Consultation by other Borough\LDDC
Ward
Out of Borough
Documents
1 published

Proposal

Marine related works include:1) removal of existing concrete river wall (landward side of Thames Path) and replacement with a new sheet pile river wall (river side of the Thames Path) at the top of existing revetment structure;2) Construction of a new sheet pile wall on the river side of the existing retaining wall structure west of the Southern Warehouse;3) Removal of sections of existing revetment to compensate for the loss in river flood volume due to the new proposed sheet pile river wall;4) Creation of an intertidal planting terrace;5) Local repair works to the existing jetty and provision of a new boathouse for the Gloriana Rowbarge. There would be five new marine piles to be installed in the river to support the guide rails for the launch mechanism of the boat and to facilitate the maneouvring of the rowbarge.

Reference
21/3614/K
Ward
Out of Borough
Agent
Marine Management Organisation (MMO)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Acknowledgement letterCorrespondence12 Oct 2021View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Not Required
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.