Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Land At And Adjacent To Scout Moor Wind Farm Rossendale And Rochdale
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConstruction and operation of 12 wind turbines with a maximum height to the tip of the blade of 180 metres (above ground level), together with associated ancillary infrastructure comprising crane pads and hardstandings; new access tracks; improvement and widening works to Scout Road; onsite substation; underground electrical infrastructure and cabling; fencing and boundary treatments; external lighting; drainage infrastructure; habitat and moorland restoration works; public right of way works; landscaping; temporary construction compound and staging area; underground electrical grid connection to the Rossendale Bulk Supply Point; and associated engineering works; alongside the retention of and improvements to existing access tracks associated with the existing Scout Moor Wind Farm (Further Environmental Information).
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsLand At And Adjacent To Scout Moor Wind Farm Rossendale And Rochdale
This record has no verified map location.
View council map| Document | Published | Action |
|---|---|---|
| TURLEY RESPONSE TO HISTORIC ENGLAND.PDFCorrespondence · PDF | 16 Oct 2026 | View |
| HISTORIC ENGLAND - FURTHER COMMENTSConsultee Comment · PDF | 16 Oct 2026 | View |
| GRAYSON- OBJECTIONObjection Comment · PDF | 15 Oct 2026 | View |
| C. ALBY-OBJECTIONObjection Comment · PDF | 15 Oct 2026 | View |
| ENVIRONMENT AGENCY -RESPONSE.Consultee Comment · PDF | 15 Oct 2026 | View |
| STEPHEN DAVISON - RMNF - OBJECTION 09.10.2026Objection Comment · PDF | 14 Oct 2026 | View |
| TOM PICKUP - OBJECTION - SM2-ROUND2-STATEMENTObjection Comment · PDF | 14 Oct 2026 | View |
| TOM PICKUP - OBJECTION - APPENDIX-C-ROUND2-FIG1116Objection Comment · PDF | 14 Oct 2026 | View |
| TOM PICKUP - OBJECTION - APPENDIX-B-ROUND2-SETTLEMENTSObjection Comment · PDF | 14 Oct 2026 | View |
| TOM PICKUP - OBJECTION - APPENDIX-A-ROUND2-METHODObjection Comment · PDF | 14 Oct 2026 | View |
| JIM MURPHY - OBJECTIONObjection Comment · PDF | 14 Oct 2026 | View |
| GARRY & PAULA BRADBURY - OBJECTIONObjection Comment · PDF | 13 Oct 2026 | View |
| RUTH MAURIELLO - OBJECTIONObjection Comment · PDF | 13 Oct 2026 | View |
| WILLIAM DRINKWATER - OBJECTIONObjection Comment · PDF | 13 Oct 2026 | View |
| J SCOTT - OBJECTIONObjection Comment · PDF | 13 Oct 2026 | View |
| ANN GOLDIE - OBJECTIONObjection Comment · PDF | 13 Oct 2026 | View |
| ERIC SENIOR - OBJECTIONObjection Comment · PDF | 13 Oct 2026 | View |
| MR JOSHUA LOCK - OBJECTIONObjection Comment · PDF | 13 Oct 2026 | View |
| DAMIAN LIMMACK - OBJECTIONObjection Comment · PDF | 13 Oct 2026 | View |
| RMNF - COMMENTS 10.10.2026Consultee Comment · PDF | 13 Oct 2026 | View |
| ALAN BILLINGSLEY - REMOVAL & REPOSITIONING OF TURBINES OBJECTIONObjection Comment · PDF | 13 Oct 2026 | View |
| J MORTON - OBJECTIONObjection Comment · PDF | 13 Oct 2026 | View |
| A DUNHAM - OBJECTIONObjection Comment · PDF | 13 Oct 2026 | View |
| D & C WILSON - OBJECTIONObjection Comment · PDF | 12 Oct 2026 | View |
| ALAN BILLINGSLEY - PEAT EXCAVATION OBJECTION AMENDEDObjection Comment · PDF | 12 Oct 2026 | View |
| RMNF - OBJECTION 8.10.2026Objection Comment · PDF | 12 Oct 2026 | View |
| A RAWSTERNE - OBJECTION 07.10.2026Objection Comment · PDF | 12 Oct 2026 | View |
| E METCALFE - OBJECTIONObjection Comment · PDF | 12 Oct 2026 | View |
| S PARKER - OBJECTIONObjection Comment · PDF | 12 Oct 2026 | View |
| A MEEK - OBJECTIONObjection Comment · PDF | 12 Oct 2026 | View |
| ROCHDALE & BURY BRIDLEWAYS ASSOCIATION - OBJECTIONObjection Comment · PDF | 9 Oct 2026 | View |
| THE COAL AUTHORITY - RESPONSEConsultee Comment · PDF | 9 Oct 2026 | View |
| EDDIE ROBERTS - ROSSENDALE WILDLIFE ADVISORY GRP BIRD REPORT 14 SEPT 1993Objection Comment · PDF | 7 Oct 2026 | View |
| EDDIE ROBBERTS - ORNITHOLOGY OBJECTION_REDACTEDObjection Comment · PDF | 7 Oct 2026 | View |
| SMWFII FEI CARBON CALCULATOR FINAL 2026.05.21Report | 6 Oct 2026 | View |
| HISTORIC ENGLAND - COMMENTSConsultee Comment · PDF | 5 Oct 2026 | View |
| RMNF - COMMENTS 25.09.2026 REDACTEDConsultee Comment · PDF | 2 Oct 2026 | View |
| RBC CLIMATE CHANGE OFFICER - COMMENTS REDACTEDConsultee Comment · PDF | 1 Oct 2026 | View |
| ANNE KCKEOWN - OBJECTION 30.09.2026Objection Comment · PDF | 30 Sept 2026 | View |
| INDICATIVE PLANS AND MICRO-SITING CONDITIONS ADVICE NOTEReport · PDF | 29 Sept 2026 | View |
| MAN AIRPORT RE-CONSULTATION RESPONSE - OBJECTIONConsultee Comment · PDF | 29 Sept 2026 | View |
| CANAL AND RIVER TRUST - NO COMMENTSConsultee Comment · PDF | 29 Sept 2026 | View |
| CADENT GAS - COMMENTS WITH MAPSConsultee Comment · PDF | 29 Sept 2026 | View |
| NATS SAFEGUARDING - OBJECTIONConsultee Comment · PDF | 29 Sept 2026 | View |
| BARTON AERODROME - NO OBJECTIONConsultee Comment · PDF | 29 Sept 2026 | View |
| LANCASHIRE CONSTABULARY DESIGNING OUT TEAM - COMMENTSConsultee Comment · PDF | 29 Sept 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 11.3 CUMULATIVE SEARCH AREA (A3)Report · PDF | 28 Sept 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 11.2 EXISTING LIGHT ENVIRONMENT (A3)Report · PDF | 28 Sept 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 11.1 LANDSCAPE CONTEXT (A3)Report · PDF | 28 Sept 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 11.6 ZTV TO HUB HEIGHT - BARE EARTH (A1)Report · PDF | 28 Sept 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 11.5 ZTP TO BLADE TIP - BARE EARTH (A1)Report · PDF | 28 Sept 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 11.4 CUMULATIVE LOCATION PLAN (A3)Report · PDF | 28 Sept 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 11.9A LANDSCAPE CHARACTER (A3)Report · PDF | 28 Sept 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 11.8 ZTV TO HUB HEIGHT WITH SCREENING (A1)Report · PDF | 28 Sept 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 11.7 ZTV TO BLADE TIP WITH SCREENING (A1)Report · PDF | 28 Sept 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 11.9B LOCAL LANDSCAPE CHARACTER KEY (A3)Report · PDF | 28 Sept 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 11.11 AVIATION LIGHTING ZTV ? BARE EARTH (A3)Report · PDF | 28 Sept 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 11.10 DESIGN ANALYSIS (A3)Report · PDF | 28 Sept 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 11.14 BARE EARTH ZTV WITH DESIGNATIONS (A3)Report · PDF | 28 Sept 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 11.13 BARE EARTH ZTV WITH VISUAL RECEPTORS (A3)Report · PDF | 28 Sept 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 11.12 BARE EARTH ZTV WITH LANDSCAPE CHARACTER (A3)Report · PDF | 28 Sept 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 11.16 CUMULATIVE ZTV CALDERDALE AND SCOUT MOOR II (AReport · PDF | 28 Sept 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 11.15 CUMULATIVE ZTV OPERATIONAL WITH SCOUT MOOR IIReport · PDF | 28 Sept 2026 | View |
| A BILLINGSLEY - OBJECTIONObjection Comment · PDF | 24 Sept 2026 | View |
| NATIONAL HIGHWAYS- RESPONSEConsultee Comment · PDF | 14 Sept 2026 | View |
| NEIGHBOUR COMMENT (OBJECTION) SUBMITTED ONLINEObjection Comment · PDF | 7 Sept 2026 | View |
| SCOUT MOOR II FEI - PLANNING DESIGN AND ACCESS STATEMENTReport · PDF | 3 Sept 2026 | View |
| SCOUT MOOR II - DOCUMENT AND DRAWING SCHEDULEReport | 27 Aug 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 12.1 HERITAGE ASSESSMENTReport · PDF | 27 Aug 2026 | View |
| 01137 SMII FEI ES V1 CHAPTER 12 BUILT HERITAGEReport · PDF | 27 Aug 2026 | View |
| T PICKUP - OBJECTION & REGULATION 25 REQUEST REDACTEDObjection Comment · PDF | 24 Aug 2026 | View |
| T PICKUP - FIGURE 1 - CUMULATIVE ZONE OF THEORETICAL VISIBILITYObjection Comment | 24 Aug 2026 | View |
| T PICKUP - APPENDIX B - SETTLEMENTS WITHIN THE OVERLAPObjection Comment · PDF | 24 Aug 2026 | View |
| T PICKUP - APPENDIX A - METHOD NOTE AND VERIFICATIONObjection Comment · PDF | 24 Aug 2026 | View |
| 01137 SMII FEI ES V1 CHAPTER 16 ASSESSMENT OF CUMULATIVE EFFECTSReport · PDF | 13 Aug 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 7.3 CUMULATIVE WIND TURBINESReport · PDF | 13 Aug 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 7.2 OPERATIONAL NOISE ASSESSMENT AND NOISE MONITORINReport · PDF | 13 Aug 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 7.1 CONSTRUCTION NOISE ASSESSMENTReport · PDF | 13 Aug 2026 | View |
| 01137 SMII FEI ES V1 CHAPTER 17 SUMMARYReport · PDF | 13 Aug 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 16.2 CUMULATIVE SHADOW FLICKER ASSESSMENTReport · PDF | 13 Aug 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 16.1 CUMULATIVE PROJECT PLAN (1)Report · PDF | 13 Aug 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 7.1 CONSTRUCTION NOISE REPORTReport · PDF | 13 Aug 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 2.4 POST SUBMISSION STATUTORY CONSULTATION COMMENTReport · PDF | 13 Aug 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 7.2 OPERATIONAL NOISE REPORTReport · PDF | 13 Aug 2026 | View |
| 01137 SMII FEI ES V2 HERITAGE ASSESSMENT APPENDICES 2-7Report · PDF | 13 Aug 2026 | View |
| 01137 SMII FEI ES V2 HERITAGE ASSESSMENT APPENDICES 8-12Report · PDF | 13 Aug 2026 | View |
| SCOUT MOOR II FEI - APPLICANT RESPONSE TO CONSULTEE COMMENTSReport · PDF | 13 Aug 2026 | View |
| 01137 SMII FEI ES V4 NON-TECHNICAL SUMMARYReport · PDF | 13 Aug 2026 | View |
| 01137 SMII FEI ES V3 ENVIRONMENTAL MANAGEMENT PLANReport · PDF | 13 Aug 2026 | View |
| SCOUT MOOR II FEI - YOU SAID WE HEARD WE ACTEDReport · PDF | 13 Aug 2026 | View |
| 01137 SMII FEI ES V1 CHAPTER 7 NOISE AND VIBRATIONReport · PDF | 13 Aug 2026 | View |
| 01137 SMII FEI ES V1 CHAPTER 11 LANDSCAPE AND VISUALReport · PDF | 13 Aug 2026 | View |
| SCOUT MOOR II FEI - OWNERSHIP SCHEDULE (REDACTED)Report · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - COVERING LETTER - ROSSENDALEReport · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - COVERING LETTER - ROCHDALEReport · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II ? TYPICAL WATER CROSSING METHODS ? SK15 REV P4Report · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II ? TYPICAL TURBINE FOUNDATION DETAIL ? SK07 REV P4Report · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II ? TYPICAL TURBINE ELEVATION ? SK06 REV P4Report · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II ? TYPICAL TRACK DETAILS ? SK14 REV P4Report · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II ? TYPICAL CRANE HARDSTANDING ? SK08 REV P4Report · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II ? TYPICAL CONSTRUCTION COMPOUND ? SK12 REV P4Report · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II ? TYPICAL COMPOUND FENCING ? SK13 REV P4Report · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II ? TYPICAL CABLE TRENCH DETAILS ? SK09 REV P5Drawing · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II ? SITE LOCATION PLAN ? SK01 REV P3Drawing · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II ? SCOUT MOOR QUARRIES ACCESS DESIGN SWEPT PATH ASSESSMENT ? SK20 RDrawing · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II ? SCOUT MOOR QUARRIES ACCESS DESIGN GENERAL ARRANGEMENT ? SK19 REVDrawing · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II ? ROOLEY MOOR ROAD CROSSING PLAN VIEW ? SK17 REV P5Drawing · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II ? ROOLEY MOOR ROAD CROSSING PLAN LONGITUDINAL SECTION ? SK16 REV PDrawing · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II ? ROOLEY MOOR ROAD CROSSING CONSTRUCTION DETAIL ? SK18 REV P4Drawing · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II ? INFRASTRUCTURE LAYOUT ? SK02 REV P4Drawing · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II ? INFRASTRUCTURE LAYOUT OPERATIONAL PHASE ? SK04 REV P5Drawing · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II ? INFRASTRUCTURE LAYOUT INDICATIVE DECOMMISSIONING PLAN ? SK05 REVDrawing · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II ? INFRASTRUCTURE LAYOUT CONSTRUCTION PHASE ? SK03 REV P4Drawing · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II - SCOUT MOOR QUARRIES LAYDOWN AREA AND JUNCTION SWEPT PATH ASSESSMDrawing · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II - SCOUT MOOR QUARRIES LAYDOWN AREA AND JUNCTION GA - SK21 REV P4Drawing · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II - INDICATIVE ONSITE SUBSTATION LAYOUT - SK10 REV P5Drawing · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II - INDICATIVE ONSITE SUBSTATION ELEVATIONS - SK11 REV P5Drawing · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II - INDICATIVE FENCING LAYOUT (VERSION 10)Drawing · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II - FEI SITE BOUNDARY COMPARISON PLANDrawing · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II - CABLE ROUTE OPTIONS - VERSION 4Drawing · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II - AVIATION LIGHTING - VERSION 8Drawing · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - DRAFT SECTION 106 AGREEMENT ROSSENDALE (01-06-26)Report · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - DRAFT SECTION 106 AGREEMENT ROCHDALE (01-06-26)Report · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - BIODIVERSITY NET GAIN REPORTReport · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - AVIATION AND MET RADAR ASSESSMENTReport · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - AIR QUALITY ASSESSMENTReport · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - MINERAL RESOURCE ASSESSMENTReport · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - HEALTH IMPACT ASSESSMENTReport · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - FLOOD RISK ASSESSMENTReport · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - ECONOMIC AND SOCIAL BENEFITS STATEMENTReport · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - DRAINAGE STRATEGYReport · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - OUTLINE HABITAT MANAGEMENT AND MONITORING PLANReport · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - OUTLINE DECOMMISSIONING RESTORATION AND AFTERCARE STRATEGYReport · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - OUTDOOR ACCESS MEPReport · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - MOORLAND RESTORATION AND MANAGEMENT PLANReport · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - MINING RISK ASSESSMENTReport · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - MINING RISK ASSESSMENTReport · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - RVAA ANNEX 3 DETAILED PROPERTY ASSESSMENT SHEETSReport · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - RESIDENTIAL VISUAL AMENITY ASSESSMENTReport · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - PRELIMINARY RISK ASSESSMENTReport · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - RVAA-VISUALS_WEBReport · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - RVAA FIGURE 3BReport · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - RVAA FIGURE 3AReport · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - RVAA FIGURE 2Report · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - RVAA FIGURE 1Report · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - RVAA-VISUALS_PRNTReport · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - TELECOMMUNICATIONS IMPACT ASSESSMENTReport · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - SUSTAINABILITY ENERGY AND CLIMATE CHANGE STATEMENTReport · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - RVAA-VISUALS_WEBReport · PDF | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - THE_STATUTORY_BIODIVERSITY_METRIC_CALCULATION_TOOL REV5Report | 9 Jul 2026 | View |
| SCOUT MOOR II FEI - TRANSPORT ASSESSMENT (INC AIL SURVEY)Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 CONTENTS PAGEReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 1.1 ASSESSMENT BOUNDARYReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 CHAPTER 1 INTRODUCTIONReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 CHAPTER 2 APPROACH TO EIAReport · PDF | 9 Jul 2026 | View |
| 01137 SMII ES V1 CHAPTER 3 ASSESSMENT BOUNDARY CONTEXTReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 4.9 SMQ ACCESS DESIGN SWEPT PATH ASSESSMENT (SK20 REReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 4.8 SMQ LAYDOWN AREA AND JUNCTION GENERAL ARRANGEMENReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 4.7 SMQ ACCESS DESIGN GENERAL ARRANGEMENT (SK19 REVReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 4.6 ROOLEY MOOR ROAD CROSSING CONSTRUCTION DETAIL (SReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 4.5 ROOLEY MOOR ROAD CROSSING PLAN & LONGITUDINAL SEReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 4.4 ROOLEY MOOR ROAD CROSSING PLAN VIEW (SK17 REV 5)Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 4.3 INFRASTRUCTURE LAYOUT - OPERATIONAL PHASE (SK04Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 4.24 INFRASTRUCTURE LAYOUT - INDICATIVE DECOMMISSIONReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 4.23 PROPOSED INDICATIVE FENCING LAYOUT WITH ACCESSReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 4.22 TYPICAL WATER CROSSING METHODS (SK15 REV 4)Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 4.21 TYPICAL TRACK DETAILS (SK14 REV 4)Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 4.20 TYPICAL COMPOUND FENCING (SK13 REV 4)Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 4.2 INFRASTRUCTURE LAYOUT - CONSTRUCTION PHASE (SK03Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 4.19 TYPICAL CONSTRUCTION COMPOUND (SK12 REV 4)Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 4.18 CABLE ROUTE OPTIONS (VERSION 4)Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 4.17 INDICATIVE ONSITE SUBSTATION ELEVATION (P5)Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 4.16 INDICATIVE ONSITE SUBSTATION LAYOUT (P5)Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 4.15 TYPICAL CABLE TRENCH DETAILS (33KV & 132KV) (SKReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 4.14 TYPICAL CRANE HARDSTANDING (SK08 REV 4)Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 4.13 TYPICAL TURBINE FOUNDATION DETAIL (SK07 REV 4)Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 4.12 TYPICAL TURBINE ELEVATION (SK06 REV 4)Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 4.11 AVIATION LIGHTING (VERSION 3)Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 4.10 SMQ LAYDOWN AREA AND JUNCTION SWEPT PATH ASSESSReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 4.1 INFRASTRUCTURE LAYOUT (SK02 REV P4)Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 CHAPTER 4 DEVELOPMENT SPECIFICATIONReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 CHAPTER 5 CONSIDERATION OF ALTERNATIVESReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 CHAPTER 6 TRANSPORT AND ACCESSReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 8.1 STUDY AREA AND SHADOW FLICKER ASSESSMENT LOCATIOReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 CHAPTER 8 SHADOW FLICKER 29.05.26 (CLEAN)Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 9.8 PEATLAND RESTORATION PROPOSALSReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 9.7 POST DEVELOPMENT HABITATS - OVERVIEWReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 9.6 EDNA RESULTSReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 9.5 BAT STATIC LOCATIONSReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 9.3 NVC BASELINE FIGURE - OVERVIEWReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 9.2 UKHAB BASELINE FIGURE - OVERVIEWReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 9.1B NON-STATUTORY DESIGNATIONSReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 9.1A DESIGNATED SITES WITHIN 10KMReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 CHAPTER 9 ECOLOGY 02.06.26 (CLEAN)Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 10.6 BREEDING BIRD SURVEY RESULTS 2024 - SKYLARKReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 10.5 BREEDING BIRD SURVEY RESULTS 2023 - SKYLARKReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 10.4 BREEDING BIRD SURVEY RESULTS 2024Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 10.3 BREEDING BIRD SURVEY RESULTS 2023Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 10.2 BREEDING BIRD SURVEY RESULTS 2022Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 10.1B NON-STATUTORY DESIGNATIONS WITHIN 2KM - ORNITHReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 10.1A DESIGNATED SITES WITHIN 10KM - ORNITHOLOGYReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 10.14 VANTAGE POINT LOCATIONS AND VIEWSHEDSReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 10.13 VANTAGE POINT SURVEY RESULTS - WATERFOWL (APRIReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 10.12 VANTAGE POINT SURVEY RESULTS - KESTREL (APRILReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 10.11 VANTAGE POINT SURVEY RESULTS - RAPTORS (APRILReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 10.10 VANTAGE POINT SURVEY RESULTS - WADERS (APRIL 2Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 CHAPTER 10 ORNITHOLOGYReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 12.9 HERITAGE ASSET PLAN WITH ASSETS ASSESSED WITHINReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 12.8 HERITAGE ASSET PLAN WITH HUB HEIGHT WITH SCREENReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 12.7 HERITAGE ASSET PLAN WITH BLADE TIP WITH SCREENIReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 12.6 HERITAGE ASSET PLAN WITH BARE EARTH HUB HEIGHTReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 12.5 HERITAGE ASSET PLAN WITH BARE EARTH BLADE TIP ZReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 12.4 HERITAGE ASSET PLANReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 12.3 1930-31 ORDNANCE SURVEY 6 INCHReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 12.2 1894-5 ORDNANCE SURVEY 6 INCHReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 12.11 HERITAGE ASSET PLAN WITH ASSETS ASSESSED WITHIReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 12.10 HERITAGE ASSET PLAN WITH ASSETS ASSESSED WITHIReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 12.1 1851 ORDNANCE SURVEY 6 INCHReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 CHAPTER 13 ARCHAEOLOGYReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 14.9 ESTIMATED PEAT DEPTHReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 14.8 PEAT DEPTH OF PENETRATION AND PROBE LOCATIONSReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 14.7 GROUNDWATER DEPENDENT TERRESTRIAL ECOSYSTEMS (GReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 14.6 HYDROGEOLOGICAL REGIMEReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 14.5D HYDROLOGICAL FEATURESReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 14.5C HYDROLOGICAL FEATURESReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 14.5B HYDROLOGICAL FEATURESReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 14.5A HYDROLOGICAL FEATURESReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 14.5 HYDROLOGICAL FEATURESReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 14.4 BEDROCK GEOLOGYReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 14.3 SUPERFICIAL GEOLOGYReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 14.2 SOILS AND PEAT MAPPINGReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 14.11 PEATLAND CONDITION ASSESSMENTReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 14.10 PEAT RESTORATION AREASReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 FIGURE 14.1 HYDROLOGICAL SETTINGReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 CHAPTER 14 HYDROLOGY, HYDROGEOLOGY AND PEATReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V1 CHAPTER 15 CLIMATE CHANGEReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 CONTENTS PAGEReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 1.2 SCHEDULE OF COMPETENCEReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 1.1 REQUIRED INFORMATIONReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 2.3 NON-STATUTORY CONSULTATION COMMENTSReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 2.2 STATUTORY CONSULTATION COMMENTSReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 2.1 EIA SCOPING REPORTReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 6.1 TRANSPORT ASSESSMENTReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 9.5 GRID CONNECTION ECOLOGY WALKOVER.Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 9.4 GREAT CRESTED NEWT AND AMPHIBIANSReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 9.3 BAT ACTIVITY REPORTReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 9.1 DESK STUDY AND HABITATS RESULTSReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 10.3 YEAR 3 ORNITHOLOGY REPORTReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 10.2 YEAR 2 ORNITHOLOGY REPORTReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 10.1 YEAR 1 ORNITHOLOGY REPORTReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 11.7 LVIA ILLUSTRATIVE WIRELINESReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 11.6 RVAA VISUALS (WEB)Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 11.6 RVAA ANNEX 3 DETAILED PROPERTY ASSESSMENT SHEReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 11.6 RESIDENTIAL VISUAL AMENITY ASSESSMENT (RVAA)Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 11.6 RVAA FIGURE 3B (A3)Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 11.6 RVAA FIGURE 3A (A3)Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 11.6 RVAA FIGURE 2 (A3)Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 11.6 RVAA FIGURE 1 (A3)Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 11.5 LANDSCAPE SENSITIVITYReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 11.4 VIEWPOINT ANALYSISReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 11.3 LANDSCAPE CHARACTER BASELINEReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 11.2 VISUALS METHODOLOGYReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 11.1 LVIA METHODOLOGYReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 12.7 WIRELINE VISUALISATIONS AND REFERENCE PHOTOGRReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 12.2-12.6Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 13.1 ADBA PART 4 OF 4Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 13.1 ADBA PART 3 OF 4Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 13.1 ADBA PART 2 OF 4Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 13.1 ADBA PART 1 OF 4Report · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 14.9 PEAT CONDITION ASSESSMENTReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 14.8 GROUNDWATER DEPENDENT TERRESTRIAL ECOSYSTEMSReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 14.7 PUBLIC WATER SUPPLY ASSESSMENTReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 14.6 PRIVATE WATER SUPPLY ASSESSMENTReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 14.5 WATERCOURSE CROSSING INVENTORYReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 14.4 PEAT LANDSLIDE HAZARD & RISK ASSESSMENTReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 14.3 OUTLINE PEAT MANAGEMENT PLANReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 14.2 PEAT SURVEY REPORTReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 14.1 GOOD PRACTICE METHODSReport · PDF | 9 Jul 2026 | View |
| 01137 SMII FEI ES V2 APPENDIX 15.1 CARBON CALCULATOR INPUT DATA & RESULTSReport · PDF | 9 Jul 2026 | View |
| 01137 FEI VISUALISATIONS (CH) - WEBReport · PDF | 9 Jul 2026 | View |
| 01137 FEI VISUALISATIONS (NS) - WEBReport · PDF | 9 Jul 2026 | View |
| 01137 FEI VISUALISATIONS (NS) - WEBReport · PDF | 9 Jul 2026 | View |
| 01137 FEI VISUALISATIONS (NS) - WEBReport · PDF | 9 Jul 2026 | View |
| NATIONAL HIGHWAYS - COMMENTS 12.06.2026Consultee Comment · PDF | 12 Jun 2026 | View |
| A BILLINGSLEY - OBJECTION - ANALYSIS OF INTERCONNECTION ROADS SCOUT MOOR 2Objection Comment · PDF | 26 May 2026 | View |
| JBA CONSULTING COMMENTSConsultee Comment · PDF | 12 May 2026 | View |
| A GERDES - OBJECTIONObjection Comment · PDF | 16 Apr 2026 | View |
| NATIONAL HIGHWAYS - COMMENTS 11.03.2026 REDACTEDConsultee Comment · PDF | 17 Mar 2026 | View |
| LCC PUBLIC RIGHTS OF WAY - COMMENTSConsultee Comment · PDF | 17 Mar 2026 | View |
| METRICA - COMMENTSConsultee Comment · PDF | 9 Mar 2026 | View |
| NATURAL ENGLAND - (UPDATED COMMENTS)Consultee Comment · PDF | 5 Feb 2026 | View |
| LCC MINERALS PLANNING TEAM - COMMENTSConsultee Comment · PDF | 2 Feb 2026 | View |
| BURY DEVELOPMENT MANAGEMENT - COMMENTS.Consultee Comment · PDF | 26 Jan 2026 | View |
| NATURAL ENGLAND - COMMENTSConsultee Comment · PDF | 26 Jan 2026 | View |
| NATIONAL HIGHWAYS COMMENTSConsultee Comment · PDF | 8 Jan 2026 | View |
| LLFA - FURTHER COMMENTSConsultee Comment · PDF | 10 Dec 2025 | View |
| GROWTH LANCASHIRE - COMMENTSConsultee Comment · PDF | 10 Dec 2025 | View |
| A RAWSTERNE - OBJECTION 08.12.2025 01 SCOUT MOOR NOISE OBJECTION LETTERObjection Comment · PDF | 9 Dec 2025 | View |
| A RAWSTERNE - OBJECTION 08.12.2025 02 CONTENTS PAGE - GROS CONS REF 2025_0267 SCObjection Comment · PDF | 9 Dec 2025 | View |
| A RAWSTERNE - OBJECTION 08.12.2025 03 GROSVENOR CONSULTANCY REF 2025_0267 SCOUTObjection Comment · PDF | 9 Dec 2025 | View |
| A RAWSTERNE - OBJECTION 08.12.2025 04 ANNEX 1. GROS CONS - SCOUT MOOR 2 - RESIDEObjection Comment · PDF | 9 Dec 2025 | View |
| A RAWSTERNE - OBJECTION 08.12.2025 05 ANNEX 1A. GROS CONS -SCOUT MOOR 2 - RESIDEObjection Comment · PDF | 9 Dec 2025 | View |
| A RAWSTERNE - OBJECTION 08.12.2025 06 ANNEX 2 SCOUT MOOR INWG_WP1_11_NOV_2015_ DObjection Comment · PDF | 9 Dec 2025 | View |
| A RAWSTERNE - OBJECTION 08.12.2025 07 ANNEX 3 SCOUT MOOR 2 - IOA VOL. 37. PT.2 2Objection Comment · PDF | 9 Dec 2025 | View |
| A RAWSTERNE - OBJECTION 08.12.2025 08 ANNEX 4. GROS CONS SCOUT MOOR 2 RITA HOLMEObjection Comment · PDF | 9 Dec 2025 | View |
| A RAWSTERNE - OBJECTION 08.12.2025 09 ANNEX 5. GROS CONS - SCOUT MOOR 2 IARO-COMObjection Comment · PDF | 9 Dec 2025 | View |
| A RAWSTERNE - OBJECTION 08.12.2025 10 ANNEX 6. GROS CONS SCOUT MOOR 2 INWG ANALYObjection Comment · PDF | 9 Dec 2025 | View |
| A RAWSTERNE - OBJECTION 08.12.2025 11 ANNEX 7. GROS CONS SCOUT MOOR 2 - IARO RESObjection Comment · PDF | 9 Dec 2025 | View |
| A RAWSTERNE - OBJECTION 08.12.2025 12 ANNEX 8. CROS CONS SCOUT MOOR 2. PEER REVIObjection Comment · PDF | 9 Dec 2025 | View |
| A RAWSTERNE - OBJECTION 08.12.2025 13 ANNEX 9. GROS CONS SCOUT MOOR 2. MEETING MObjection Comment · PDF | 9 Dec 2025 | View |
| A RAWSTERNE - OBJECTION 08.12.2025 14 ANNEX 10. GROS CONS SCOUT MOOR 2. IARO CHAObjection Comment · PDF | 9 Dec 2025 | View |
| A RAWSTERNE - OBJECTION 08.12.2025 15 ANNEX 11. CROS CONS SCOUT MOOR 2- IRE-2024Objection Comment · PDF | 9 Dec 2025 | View |
| A RAWSTERNE - OBJECTION 08.12.2025 16 ANNEX 11A GROS CONS SCOUT MOOR 2. EXTRACTSObjection Comment · PDF | 9 Dec 2025 | View |
| A RAWSTERNE - OBJECTION 08.12.2025 17 ANNEX 12. GROS CONS SCOUT MOOR 2. 2025_IEHObjection Comment · PDF | 9 Dec 2025 | View |
| A RAWSTERNE - OBJECTION 08.12.2025 18 ANNEX 12A. GROS CONS SCOUT MOOR 2 - EXTRACObjection Comment · PDF | 9 Dec 2025 | View |
| A RAWSTERNE - OBJECTION 08.12.2025 19 ANNEX 13. GROS CONS SCOUT MOOR 2. WTN DANIObjection Comment · PDF | 9 Dec 2025 | View |
| A RAWSTERNE - OBJECTION 08.12.2025 20 ANNEX 14. GROS CONS SCOUT MOOR 2. FINNISHObjection Comment · PDF | 9 Dec 2025 | View |
| BARTON AERODROME - COMMENTSConsultee Comment · PDF | 3 Dec 2025 | View |
| A & A GIBSON - OBJECTION REDACTEDObjection Comment · PDF | 30 Nov 2025 | View |
| FRIENDS OF THE EARTH - SUPPORTING COMMENTSupport Comment · PDF | 17 Nov 2025 | View |
| RSPB - COMMENTS REDACTEDConsultee Comment · PDF | 14 Nov 2025 | View |
| HYNDBURN BC - COMMENTS REDACTEDConsultee Comment · PDF | 13 Nov 2025 | View |
| I & M TATTERSALL - OBJECTION REDACTEDObjection Comment · PDF | 11 Nov 2025 | View |
| P SUTHERLAND - OBJECTIONObjection Comment · PDF | 11 Nov 2025 | View |
| PETER DAWSON - OBJECTIONObjection Comment · PDF | 10 Nov 2025 | View |
| JOANNE ASH - OBJECTIONObjection Comment · PDF | 10 Nov 2025 | View |
| LCC HIGHWAYS - COMMENTSConsultee Comment · PDF | 10 Nov 2025 | View |
| LANCASHIRE WILDLIFE TRUST - COMMENTSConsultee Comment · PDF | 3 Nov 2025 | View |
| A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 02.11.2025 REDACTEDObjection Comment · PDF | 2 Nov 2025 | View |
| N MORRELL - OBJECTIONObjection Comment · PDF | 23 Oct 2025 | View |
| NORDEN AREA FORUM - OBJECTIONObjection Comment · PDF | 23 Oct 2025 | View |
| JANE MURPHY - OBJECTIONObjection Comment · PDF | 23 Oct 2025 | View |
| OBJECTION S THORPEObjection Comment · PDF | 22 Oct 2025 | View |
| OBJECTION K THORPEObjection Comment · PDF | 22 Oct 2025 | View |
| KAREN COWLEY - OBJECTIONObjection Comment · PDF | 22 Oct 2025 | View |
| MARGARET TURNER - OBJECTIONObjection Comment · PDF | 20 Oct 2025 | View |
| J HIGNETT - FURTHER OBJECTION REDACTEDObjection Comment · PDF | 19 Oct 2025 | View |
| C HIGNETT - FURTHER OBJECTION REDACTEDObjection Comment · PDF | 19 Oct 2025 | View |
| PAUL BUCHANAN - OBJECTIONObjection Comment · PDF | 15 Oct 2025 | View |
| ECOLOGY - COMMENTSConsultee Comment · PDF | 13 Oct 2025 | View |
| ROSSENDALE CIVIC TRUST - COMMENTSObjection Comment · PDF | 13 Oct 2025 | View |
| J COLLINS - OBJECTION - SUPPORTING DOCUMENTS - NOT REDACTED AS REQUESTED BY J COObjection Comment · PDF | 13 Oct 2025 | View |
| J COLLINS - OBJECTION - PUBLIC SUBMISSIONS ON SCOUT MOORE IIM - NOT REDACTED ASObjection Comment · PDF | 13 Oct 2025 | View |
| J COLLINS - OBJECTION - COVER LETTER - NOT REDACTED AS REQUESTED BY J COLLINSObjection Comment · PDF | 13 Oct 2025 | View |
| NATIONAL TRUST - COMMENTS REDACTEDConsultee Comment · PDF | 10 Oct 2025 | View |
| UNITED UTILITIES - COMMENTSConsultee Comment · PDF | 10 Oct 2025 | View |
| MET OFFICE - COMMENTSConsultee Comment · PDF | 9 Oct 2025 | View |
| SUSAN HARRISON - OBJECTIONObjection Comment · PDF | 9 Oct 2025 | View |
| APPLICANT RESPONSE TO PUBLIC QUERIESSuperseded · PDF | 8 Oct 2025 | View |
| ANN ELMER - REDACTED - OBJECTIONObjection Comment · PDF | 8 Oct 2025 | View |
| A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 07.10.2025 REDACTEDObjection Comment · PDF | 7 Oct 2025 | View |
| J NEWCOMBE - FURTHER OBJECTIONObjection Comment · PDF | 7 Oct 2025 | View |
| S DAVISON - OBJECTIONObjection Comment · PDF | 7 Oct 2025 | View |
| K BENTHAM - OBJECTION REDACTEDObjection Comment · PDF | 6 Oct 2025 | View |
| GARDENS TRUST - COMMENTS REDACTEDConsultee Comment · PDF | 5 Oct 2025 | View |
| SCOUT MOOR II - STATEMENT OF COMMUNITY INVOLVEMENTReport · PDF | 3 Oct 2025 | View |
| SCOUT MOOR II - BIODIVERSITY NET GAIN ASSESSMENTSuperseded · PDF | 3 Oct 2025 | View |
| HISTORIC ENGLAND - COMMENTSConsultee Comment · PDF | 2 Oct 2025 | View |
| MHCLG EMAIL 20TH AUGUST 2025Report · PDF | 1 Oct 2025 | View |
| MHCLG EMAIL 27TH AUGUST 2025Report · PDF | 1 Oct 2025 | View |
| MHCLG EMAIL 29TH SEPTEMBER 2025Report · PDF | 1 Oct 2025 | View |
| NBH BRIDLEWAYS ASSOCIATION - COMMENTSConsultee Comment · PDF | 30 Sept 2025 | View |
| W WRIGHT - OBJECTIONObjection Comment · PDF | 30 Sept 2025 | View |
| SMWFII CARBON CALCULATORSuperseded | 29 Sept 2025 | View |
| A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 29.09.2025 REDACTEDObjection Comment · PDF | 29 Sept 2025 | View |
| A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 27.09.2025 REDACTEDObjection Comment · PDF | 27 Sept 2025 | View |
| ENVIRONMENTAL PROTECTION - COMMENTSConsultee Comment · PDF | 26 Sept 2025 | View |
| A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 26.09.2025 REDACTEDObjection Comment · PDF | 26 Sept 2025 | View |
| LCC HISTORIC ENVIRONMENT TEAM - COMMENTS REDACTEDConsultee Comment · PDF | 25 Sept 2025 | View |
| LLFA RESPONSEConsultee Comment · PDF | 24 Sept 2025 | View |
| A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 24.09.2025 REDACTEDObjection Comment · PDF | 24 Sept 2025 | View |
| S & C HIGGINBOTHAM - OBJECTIONObjection Comment · PDF | 24 Sept 2025 | View |
| M HIGGINBOTHAM - OBJECTIONObjection Comment · PDF | 24 Sept 2025 | View |
| E DALBY - OBJECTIONObjection Comment · PDF | 24 Sept 2025 | View |
| JOHN BURNS - OBJECTIONObjection Comment · PDF | 23 Sept 2025 | View |
| RBC CLIMATE CHANGE - COMMENTS REDACTEDConsultee Comment · PDF | 23 Sept 2025 | View |
| ENVIRONMENT AGENCY - COMMENTSConsultee Comment · PDF | 22 Sept 2025 | View |
| A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 22.09.2025 REDACTEDObjection Comment · PDF | 22 Sept 2025 | View |
| JOHN NEWCOMBE ON BEHALF OF THE P&BFCA VILLAGE HERITAGE ASSET - OBJECTIONConsultee Comment · PDF | 20 Sept 2025 | View |
| A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 20.09.2025 REDACTEDObjection Comment · PDF | 20 Sept 2025 | View |
| THE COAL AUTHORITY - COMMENTSConsultee Comment · PDF | 17 Sept 2025 | View |
| MAG SAFEGUARDING - COMMENTSConsultee Comment · PDF | 17 Sept 2025 | View |
| POLICE ARCHITECTURAL LIAISON - COMMENTSConsultee Comment · PDF | 16 Sept 2025 | View |
| J HIGNETT - OBJECTION REDCATEDObjection Comment · PDF | 15 Sept 2025 | View |
| C HIGNETT - OBJECTION REDACTEDObjection Comment · PDF | 15 Sept 2025 | View |
| C PEAT FOREST OF ROSSENDALE BRIDLEWAYS ASSOCIATION - FURTHER OBJECTION REDACTEDObjection Comment · PDF | 12 Sept 2025 | View |
| HEALTH & SAFETY EXECUTIVE - FURTHER COMMENTSConsultee Comment · PDF | 11 Sept 2025 | View |
| A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 10.09.2025 REDACTEDObjection Comment · PDF | 10 Sept 2025 | View |
| COUNCIL OF BRITISH ARCHAEOLOGY - COMMENTS REDACTEDConsultee Comment · PDF | 10 Sept 2025 | View |
| A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 10.09.2025 1Objection Comment · PDF | 10 Sept 2025 | View |
| A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 10.09.2025 2Objection Comment · PDF | 10 Sept 2025 | View |
| A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 10.09.2025 2 ATTACHMENT BObjection Comment | 10 Sept 2025 | View |
| A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 10.09.2025 2 ATTACHMENT AObjection Comment | 10 Sept 2025 | View |
| A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 10.09.2025 3Objection Comment · PDF | 10 Sept 2025 | View |
| A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 10.09.2025 4Objection Comment · PDF | 10 Sept 2025 | View |
| A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 10.09.2025 5Objection Comment · PDF | 10 Sept 2025 | View |
| HEALTH & SAFETY EXECUTIVE - COMMENTSConsultee Comment · PDF | 9 Sept 2025 | View |
| A RAWSTERNE ON BEHALF OF ROOLEY MOOR NEIGHBOURHOOD FORUM-OBJECTION REDACTEDObjection Comment · PDF | 9 Sept 2025 | View |
| NATS SAFEGUARDING - COMMENTSConsultee Comment · PDF | 8 Sept 2025 | View |
| BOLTON COUNCIL - COMMENTSConsultee Comment · PDF | 8 Sept 2025 | View |
| BURNLEY COUNCIL - FURTHER COMMENTSConsultee Comment · PDF | 8 Sept 2025 | View |
| BURNLEY COUNCIL - COMMENTS REDACTEDConsultee Comment · PDF | 5 Sept 2025 | View |
| CANAL & RIVER TRUST - COMMENTSConsultee Comment · PDF | 5 Sept 2025 | View |
| NEIL GRAYSON - OBJECTIONObjection Comment · PDF | 3 Sept 2025 | View |
| C PEAT FOREST OF ROSSENDALE BRIDLEWAYS ASSOCIATION - OBJECTION REDACTEDObjection Comment · PDF | 3 Sept 2025 | View |
| DAVID TRIVETT - FURTHER OBJECTIONObjection Comment · PDF | 1 Sept 2025 | View |
| S FLETCHER - OBJECTIONObjection Comment · PDF | 23 Aug 2025 | View |
| K FLETCHER - OBJECTIONObjection Comment · PDF | 23 Aug 2025 | View |
| J WHITEHEAD ON BEHALF OF SAY NO TO SCOUT MOOR 2 GROUP - OBJECTIONObjection Comment · PDF | 21 Aug 2025 | View |
| DAVID TRIVETT - OBJECTIONObjection Comment · PDF | 21 Aug 2025 | View |
| RMNF - OBJECTIONObjection Comment · PDF | 14 Aug 2025 | View |
| DATED JULY 2025 - OUTLINE DECOMMISSIONING STRATEGYSuperseded · PDF | 7 Aug 2025 | View |
| DATED JULY 2025 - SECTION 106 HEAD OF TERMSSuperseded · PDF | 7 Aug 2025 | View |
| BNG ADDENDUMSuperseded · PDF | 7 Aug 2025 | View |
| VISUALISATIONS (CH)Superseded · PDF | 1 Aug 2025 | View |
| OWNERSHIP SCHEDULESuperseded · PDF | 31 Jul 2025 | View |
| T HUNTER - SUPPORTSupport Comment · PDF | 31 Jul 2025 | View |
| DATED JULY 2025 - PLANNING DESIGN AND ACCESS STATEMENTSuperseded · PDF | 23 Jul 2025 | View |
| APPLICATION FORM REDACTEDSuperseded · PDF | 23 Jul 2025 | View |
| COVERING LETTEROther · PDF | 23 Jul 2025 | View |
| SK01 REV P1 - SITE LOCATION PLANSuperseded · PDF | 2 Jul 2025 | View |
| SK02 REV P1 - INFRASTRUCTURE LAYOUTSuperseded · PDF | 2 Jul 2025 | View |
| SK03 REV P1 - INFRASTRUCTURE LAYOUT - CONSTRUCTION PHASESuperseded · PDF | 2 Jul 2025 | View |
| SK04 REV P2 - INFRASTRUCTURE LAYOUT - OPERATIONAL PHASESuperseded · PDF | 2 Jul 2025 | View |
| SK16 REV 2 - CROSSING PLAN & SECTIONSuperseded · PDF | 2 Jul 2025 | View |
| SK17 REV 2 - CROSSING PLAN VIEWSuperseded · PDF | 2 Jul 2025 | View |
| SK18 REV 2 - CROSSING CONSTRUCTION DETAILSuperseded · PDF | 2 Jul 2025 | View |
| SK19 REV 2 - ACCESS DESIGN GASuperseded · PDF | 2 Jul 2025 | View |
| SK21 REV 2 - LAYDOWN AND JUNCTION GASuperseded · PDF | 2 Jul 2025 | View |
| SK20 REV 2 - ACCESS DESIGN SWEPT PATHSuperseded · PDF | 2 Jul 2025 | View |
| SK22 REV 2 - LAYDOWN AND JUNCTION SWEPT PATHSuperseded · PDF | 2 Jul 2025 | View |
| SK15 REV 2 - TYPICAL WATERCOURSE CROSSING METHODSSuperseded · PDF | 2 Jul 2025 | View |
| SK14 REV 2 - TYPICAL TRACK DETAILSSuperseded · PDF | 2 Jul 2025 | View |
| SK13 REV 2 - TYPICAL COMPOUND FENCINGSuperseded · PDF | 2 Jul 2025 | View |
| SK12 REV 2 - TYPICAL CONSTRUCTION COMPOUNDSuperseded · PDF | 2 Jul 2025 | View |
| SK11 REV 2 - INDICATIVE ONSITE SUBSTATION ELEVATIONSuperseded · PDF | 2 Jul 2025 | View |
| SK10 REV 2 - INDICATIVE ONSITE SUBSTATION LAYOUTSuperseded · PDF | 2 Jul 2025 | View |
| SK09 REV 2 - TYPICAL CABLE TRENCH DETAILSuperseded · PDF | 2 Jul 2025 | View |
| SK08 REV 2 - TYPICAL CRANE HARDSTANDING DETAILSuperseded · PDF | 2 Jul 2025 | View |
| SK07 REV 2 - TYPICAL TURBINE FOUNDATION DETAILSuperseded · PDF | 2 Jul 2025 | View |
| SK06 REV 2 - TYPICAL TURBINE ELEVATIONSuperseded · PDF | 2 Jul 2025 | View |
| SK05 REV P1 - INFRASTRUCTURE LAYOUT - INDICATIVE DECOMMISSIONING PLANSuperseded · PDF | 2 Jul 2025 | View |
| VERSION 6 (DATED 20/05/2025) - PROPOSED INDICATIVE FENCING LAYOUT WITH ACCESS POSuperseded · PDF | 2 Jul 2025 | View |
| 230509 REV S01 - DRAINAGE STRATEGYSuperseded · PDF | 2 Jul 2025 | View |
| 8706 HMMP REV 3 - HABITAT MANAGEMENT AND MONITORING PLAN (REV 3)Superseded · PDF | 2 Jul 2025 | View |
| 8706 MRMP REV 5 - MOORLAND RESORATION AND MANAGEMENT PLAN (REV 5)Superseded · PDF | 2 Jul 2025 | View |
| DATED JUNE 2025 - OUTDOOR ACCESS MANAGEMENT & ENHANCEMENT PLANSuperseded · PDF | 2 Jul 2025 | View |
| J10-15729B-10 F2 - AIR QUALITY ASSESSMENTSuperseded · PDF | 2 Jul 2025 | View |
| DATED 07 MAY 2025 - AVIATION AND MET RADAR IMPACT ASSESSMENTSuperseded · PDF | 2 Jul 2025 | View |
| FIGURE 3A - RESIDENTIAL VISUAL AMENITY ASSESSMENTSuperseded · PDF | 2 Jul 2025 | View |
| FIGURE 3B - RESIDENTIAL VISUAL AMENITY ASSESSMENTSuperseded · PDF | 2 Jul 2025 | View |
| 130125 REV P03 - FLOOD RISK ASSESSMENTSuperseded · PDF | 2 Jul 2025 | View |
| DATED JUNE 2025 - HEALTH IMPACT ASSESSMENTSuperseded · PDF | 2 Jul 2025 | View |
| 109692-PEF-ZZ-XX-RP-GG-7002 P03 - MINERAL RESOURCE ASSESSMENTSuperseded · PDF | 2 Jul 2025 | View |
| 109692-PEF-ZZ-XX-RP-GG-6001 P03 - PRELIMINARY RISK ASSESSMENTSuperseded · PDF | 2 Jul 2025 | View |
| DATED JUNE 2005 - RESIDENTIAL VISUAL AMENITY ASSESSMENT (RVAA)Superseded · PDF | 2 Jul 2025 | View |
| ANNEX 3 - RESIDENTIAL VISUAL AMENITY ASSESSMENT DETAILED PROPERTY ASSESSMENT SHESuperseded · PDF | 2 Jul 2025 | View |
| FIGURE 1 - RESIDENTIAL VISUAL AMENITY ASSESSMENTSuperseded · PDF | 2 Jul 2025 | View |
| FIGURE 2 - RESIDENTIAL VISUAL AMENITY ASSESSMENTSuperseded · PDF | 2 Jul 2025 | View |
| DATED JUNE 2025 - RESIDENTIAL VISUAL AMENITY ASSESSMENT VISUALSSuperseded · PDF | 2 Jul 2025 | View |
| DATED JUNE 2025 - SUSTAINABILITY ENERGY & CLIMATE CHANGE STATEMENTSuperseded · PDF | 2 Jul 2025 | View |
| 13110B ISSUE 03 - TELECOMMUNICATIONS IMPACT ASSESSMENTSuperseded · PDF | 2 Jul 2025 | View |
| 250330 V2 - TRANSPORT ASSESSMENTSuperseded · PDF | 2 Jul 2025 | View |
| DATED JUNE 2025 - ECONOMIC AND SOCIAL BENEFITS STATEMENTSuperseded · PDF | 2 Jul 2025 | View |
| 109692-PEF-ZZ-XX-RP-GT-6001 P01 - MINING RISK ASSESSMENTSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V4 - NON-TECHNICAL SUMMARYSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V3 - ENVIRONMENTAL MANAGEMENT PLANSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 1.1 - REQUIRED INFORMATIONSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 - CONTENTS PAGESuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 9.4 - GCN TECHNICAL APPENDIXSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 9.3 - BAT SURVEYS TECHNICAL APPENDIXSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 9.2 - PROTECTED SPECIES TECHNICAL APPENDIXSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 9.1Superseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 7.2 - OPERATIONAL NOISE REPORTSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 7.1 - CONSTRUCTION NOISE REPORTSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 6.1 - TRANSPORT ASSESSMENTSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 2.3 - NON-STATUTORY CONSULTATION COMMENTSSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 2.2 - STATUTORY CONSULTATION COMMENTSSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 2.1 - EIA SCOPING REPORTSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 15.1 - CARBON CALCULATOR INPUT DATA & RESULTSSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 14.9 - PEAT CONDITION ASSESSMENTSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 14.8 - GROUNDWATER DEPENDENT TERRESTRIAL ECOSYSTEMSSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 14.7 - PUBLIC WATER SUPPLY ASSESSMENTSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 14.6 - PRIVATE WATER SUPPLY ASSESSMENTSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 14.5 - WATERCOURSE CROSSING INVENTORYSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 14.4 - PEAT LANDSLIDE HAZARD RISK ASSESSMENTSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 14.3 - OUTLINE PEAT MANAGEMENT PLANSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 14.2 - PEAT SURVEY REPORTSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 14.1 - GOOD PRACTICE METHODSSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 13.1 - ARCHAEOLOGICAL DESK BASED ASSESSMENTSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 12.2-12.6 - NEARBY DESIGNATED HERITAGE ASSETS STUDYSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 12.1 - HERITAGE ASSESSMENTSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 11.5 - LANDSCAPE SENSITIVITYSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 11.4 - VIEWPOINT ANALYSISSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 11.3 - LANDSCAPE CHARACTER BASELINESuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 11.2 - VISUALS METHODOLOGYSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 11.1 - LVIA METHODOLOGYSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 10.3 - ORNITHOLOGY REPORT YEAR 3Superseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 10.2 - ORNITHOLOGY REPORT YEAR 2Superseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 10.1 - ORNITHOLOGY REPORT YEAR 1Superseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V2 APPENDIX 1.2 - SCHEDULE OF COMPETENCESuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 9.8 - PEATLAND RESTORATION PROPOSALSSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 9.7 - POST DEVELOPMENT HABITATSSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 9.6 - EDNA RESULTSSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 9.5 - BAT STATIC LOCATIONSSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 9.3 - NVC BASELINE FIGURESuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 9.2 - UKHAB BASELINE FIGURESuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 9.1B - DESIGNATED SITES WITHIN 10KMSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 9.1A - DESIGNATED SITES WITHIN 10KMSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 8.1 - SHADOW FLICKER ASSESSMENT LOCATIONSSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 7.1 - CONSTRUCTION NOISE ASSESSMENTSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 4.23 - INFRASTRUCTURE LAYOUT - INDICATIVE DECOMMISSIONINSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 4.22 - PROPOSED INDICATIVE FENCING LAYOUT WITH ACCESS POSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 4.21 - TYPICAL WATER CROSSING METHODSSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 4.20 - TYPICAL TRACK DETAILSSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 4.19 - TYPICAL COMPOUND FENCINGSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 4.18 - TYPICAL CONSTRUCTION COMPOUNDSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 4.17 - INDICATIVE ONSITE SUBSTATION ELEVATIONSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 4.16 - INDICATIVE ONSITE SUBSTATION LAYOUTSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 4.15 - TYPICAL CABLE TRENCH DETAILSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 4.14 - TYPICAL CRANE HARDSTANDINGSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 4.13 - TYPICAL TURBINE FOUNDATION DETAILSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 4.12 - TYPICAL TURBINE ELEVATIONSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 4.11 - AVIATION LIGHTING PLANSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 4.10 - LAYDOWN AREA AND JUNCTION SWEPT PATH ASSESSMENTSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 4.09 - ACCESS DESIGN SWEPT PATH ASSESSMENTSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 4.08 - LAYDOWN AREA AND JUNCTION GENERAL ARRANGEMENTSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 4.07 - ACCESS DESIGN GENERAL ARRANGEMENTSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 4.06 - CROSSING CONSTRUCTION DETAILSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 4.05 - CROSSING PLAN & LONGITUDINAL SECTIONSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 4.04 - PLAN VIEWSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 4.03 - INFRASTRUCTURE LAYOUT - OPERATIONAL STAGESuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 4.02 - INFRASTRUCTURE LAYOUT - CONSTRUCTION STAGESuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 4.01 - INFRASTRUCTURE LAYOUTSuperseded · PDF | 2 Jul 2025 | View |
| VISUALISATIONS (NS)Superseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 - CONTENTS PAGESuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 - CHAPTER 9 ECOLOGYSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 - CHAPTER 8 SHADOW FLICKERSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 - CHAPTER 7 NOISE AND VIBRATIONSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 - CHAPTER 6 TRANSPORT AND ACCESSSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 - CHAPTER 5 CONSIDERATION OF ALTERNATIVESSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 - CHAPTER 4 DEVELOPMENT SPECIFICATIONSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 - CHAPTER 3 ASSESSMENT BOUNDARY CONTEXT 010625Superseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 - CHAPTER 2 APPROACH TO EIASuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 - CHAPTER 17 SUMMARYSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 - CHAPTER 16 ASSESSMENT OF CUMULATIVE EFFECTSSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 - CHAPTER 15 CLIMATE CHANGESuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 - CHAPTER 14 HYDROLOGY, HYDROGEOLOGY AND PEASuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 - CHAPTER 13 ARCHAEOLOGYSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 - CHAPTER 12 BUILT HERITAGESuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 - CHAPTER 11 LANDSCAPE AND VISUALSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 - CHAPTER 10 ORNITHOLOGYSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 - CHAPTER 1 INTRODUCTIONSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 10.1A - DESIGNATED SITES WITHIN 10KM - ORNITHOLOGYSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 10.1B - NON-STATUTORY DESIGNATIONS WITHIN 2KM - ORNITHOLSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 10.2 - BREEDING BIRD SURVEY RESULTS 2022Superseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE - BREEDING BIRD SURVEY RESULTS 2023Superseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 10.4 - BREEDING BIRD SURVEY RESULTSSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 10.5 OR 013B - BREEDING BIRD SURVEY RESULTS 2023 - SKYLASuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 10.6 OR 037B - BREEDING BIRD SURVEY RESULTS 2024 - SKYLASuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 10.14 OR 004C - VANTAGE POINT LOCATIONS AND VIEWSHEDSSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 10.13 OR 048A - VANTAGE POINT SURVEY RESULTS - WATERFOWLSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 10.12 OR 056A - VANTAGE POINT SURVEY RESULTS - KESTREL (Superseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 10.11 OR 047A - VANTAGE POINT SURVEY RESULTS - RAPTORS (Superseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 10.10 OR 046B - VANTAGE POINT SURVEY RESULTS - WADERS (ASuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 16.2 - CUMULATIVE SHADOW FLICKER ASSESSMENSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 16.1 - CUMULATIVE PROJECT PLANSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 14.1 - HYDROLOGICAL SETTINGSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 14.10 - PEAT RESTORATION AREASSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 14.11 - PEATLAND CONDITION ASSESSMENTSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 14.2 - SOILS AND PEAT MAPPINGSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 14.3 - SUPERFICIAL GEOLOGYSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 14.4 - BEDROCK GEOLOGYSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 14.5 - HYDROLOGICAL FEATURESSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 14.5A - HYDROLOGICAL FEATURESSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 14.5B - HYDROLOGICAL FEATURESSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 14.5C - HYDROLOGICAL FEATURESSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 14.5D - HYDROLOGICAL FEATURESSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 14.6 - HYDROLOGICAL REGIMESuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 14.7 - GROUNDWATER DEPENDENT TERRESTRIAL ECOSYSTEMSSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 14.8 - PEAT DEPTH OF PENETRATION AND PROBE LOCATIONSSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 14.9 - ESTIMATED PEAT DEPTHSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 14.10 - PEAT RESTORATION AREASSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 14.11 - PEATLAND CONDITION ASSESSMENTSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 11.1 - LANDSCAPE CONTEXT - 45KMSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 11.10 - DESIGN ANALYSIS - 5KMSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 11.11 - AVIATION LIGHTING ZTV ? BARE EARTH - 10KMSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 11.12 - BARE EARTH ZTV WITH LANDSCAPE CHARACTER 10KMSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 11.13 - BARE EARTH ZTV WITH VISUAL RECEPTORSSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 11.14 - BARE EARTH ZTV WITH DESIGNATIONS - 10KMSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 11.15 - CUMULATIVE ZTV OPERATIONAL WITH SCOUT MOOR IISuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 11.2 - EXISTING LIGHT ENVIRONMENT -20KMSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 11.3 - CUMULATIVE SEARCH AREA 45KMSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 11.4 - CUMULATIVE LOCATION PLAN 20KMSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 11.5 - BARE EARTH BLADE TIP ZTV 45KMSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 11.6 - BARE EARTH HUB HEIGHT ZTV 45KMSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 11.7 - ZTV TO BLADE TIP WITH SCREENING 45KMSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 11.8 - ZTV TO HUB HEIGHT WITH SCREENING 45KMSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 11.9A - LOCAL LANDSCAPE CHARACTER - 20KMSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 11.9B - LOCAL LANDSCAPE CHARACTER KEY - 20KMSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 12.1 - 1851 ORDNANCE SURVEY 6 INCHSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 12.10 - HERITAGE ASSET PLAN WITH ASSETS ASSESSED WITHINSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 12.11 - HERITAGE ASSET PLAN WITH ASSETS ASSESSED WITHINSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 12.2 - 1894-95 ORDNANCE SURVEY 6 INCHSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 12.3 - 1930-31 ORDNANCE SURVEY 6 INCHSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 12.4 - HERITAGE ASSET PLAN (15KM STUDY AREA)Superseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 12.5 - HERITAGE ASSET PLAN WITH BARE EARTH BLADE TIP ZTVSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 12.6 - HERITAGE ASSET PLAN WITH BARE EARTH HUB HEIGHT ZTSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 12.7 - HERITAGE ASSET PLAN WITH BLADE TIP WITH SCREENINGSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 12.8 - HERITAGE ASSET PLAN WITH HUB HEIGHT WITH SCREENINSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 12.9 - HERITAGE ASSET PLAN WITH ASSETS ASSESSED WITHIN TSuperseded · PDF | 2 Jul 2025 | View |
| DATED JULY 2025 SCOUT MOOR II - STATEMENT OF COMMUNITY INVOLVEMENTSuperseded · PDF | 2 Jul 2025 | View |
| SCOUT MOOR II - BIODIVERSITY NET GAIN ASSESSMENT (APPENDIX A - CONDITION ASSESSMSuperseded | 2 Jul 2025 | View |
| SCOUT MOOR II - BIODIVERSITY NET GAIN ASSESSMENT (APPENDIX B - STATUTORY BNG METSuperseded | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 7.3 CUMULATIVE WIND TURBINESSuperseded · PDF | 2 Jul 2025 | View |
| 01137 SMII ES V1 FIGURE 7.2 OPERATIONAL NOISE ASSESSMENT AND NOISE MONITORING LOSuperseded · PDF | 2 Jul 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
We haven’t collected any decision conditions for this application.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.