Council planning record

Construction and operation of 12 wind turbines with a maximum height to the tip of the blade of 180 metres (above ground level), together with associated ancillary infrastructure comprising crane pads and hardstandings; new access tracks; improvement and widening works to Scout Road; onsite substation; underground electrical infrastructure and cabling; fencing and boundary treatments; external lighting; drainage infrastructure; habitat and moorland restoration works; public right of way works; landscaping; temporary construction compound and staging area; underground electrical grid connection to the Rossendale Bulk Supply Point; and associated engineering works; alongside the retention of and improvements to existing access tracks associated with the existing Scout Moor Wind Farm (Further Environmental Information).

Land At And Adjacent To Scout Moor Wind Farm Rossendale And Rochdale

Pending ConsiderationReference: 2025/0267Rossendale Borough Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Standard Consultation Date

    Published milestoneCouncil source
  6. Last Advertised In Press Date

    Published milestoneCouncil source
  7. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  8. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Latest Advertisement Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Latest Consultation Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Neighbour Consultation Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Agreed Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Pending Consideration
Application type
Full Application
Received
2 Jul 2025
Validated
7 Aug 2025
Determination deadline
6 Nov 2025
Local authority
Rossendale Borough Council

Application overview

Construction and operation of 12 wind turbines with a maximum height to the tip of the blade of 180 metres (above ground level), together with associated ancillary infrastructure comprising crane pads and hardstandings; new access tracks; improvement and widening works to Scout Road; onsite substation; underground electrical infrastructure and cabling; fencing and boundary treatments; external lighting; drainage infrastructure; habitat and moorland restoration works; public right of way works; landscaping; temporary construction compound and staging area; underground electrical grid connection to the Rossendale Bulk Supply Point; and associated engineering works; alongside the retention of and improvements to existing access tracks associated with the existing Scout Moor Wind Farm (Further Environmental Information).

Proposal details

Reference
2025/0267
Ward
Hareholme And Waterfoot
Agent
Turley

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land At And Adjacent To Scout Moor Wind Farm Rossendale And Rochdale

This record has no verified map location.

View council map

Documents 616 of 616

DocumentPublishedAction
TURLEY RESPONSE TO HISTORIC ENGLAND.PDFCorrespondence · PDF16 Oct 2026View
HISTORIC ENGLAND - FURTHER COMMENTSConsultee Comment · PDF16 Oct 2026View
GRAYSON- OBJECTIONObjection Comment · PDF15 Oct 2026View
C. ALBY-OBJECTIONObjection Comment · PDF15 Oct 2026View
ENVIRONMENT AGENCY -RESPONSE.Consultee Comment · PDF15 Oct 2026View
STEPHEN DAVISON - RMNF - OBJECTION 09.10.2026Objection Comment · PDF14 Oct 2026View
TOM PICKUP - OBJECTION - SM2-ROUND2-STATEMENTObjection Comment · PDF14 Oct 2026View
TOM PICKUP - OBJECTION - APPENDIX-C-ROUND2-FIG1116Objection Comment · PDF14 Oct 2026View
TOM PICKUP - OBJECTION - APPENDIX-B-ROUND2-SETTLEMENTSObjection Comment · PDF14 Oct 2026View
TOM PICKUP - OBJECTION - APPENDIX-A-ROUND2-METHODObjection Comment · PDF14 Oct 2026View
JIM MURPHY - OBJECTIONObjection Comment · PDF14 Oct 2026View
GARRY & PAULA BRADBURY - OBJECTIONObjection Comment · PDF13 Oct 2026View
RUTH MAURIELLO - OBJECTIONObjection Comment · PDF13 Oct 2026View
WILLIAM DRINKWATER - OBJECTIONObjection Comment · PDF13 Oct 2026View
J SCOTT - OBJECTIONObjection Comment · PDF13 Oct 2026View
ANN GOLDIE - OBJECTIONObjection Comment · PDF13 Oct 2026View
ERIC SENIOR - OBJECTIONObjection Comment · PDF13 Oct 2026View
MR JOSHUA LOCK - OBJECTIONObjection Comment · PDF13 Oct 2026View
DAMIAN LIMMACK - OBJECTIONObjection Comment · PDF13 Oct 2026View
RMNF - COMMENTS 10.10.2026Consultee Comment · PDF13 Oct 2026View
ALAN BILLINGSLEY - REMOVAL & REPOSITIONING OF TURBINES OBJECTIONObjection Comment · PDF13 Oct 2026View
J MORTON - OBJECTIONObjection Comment · PDF13 Oct 2026View
A DUNHAM - OBJECTIONObjection Comment · PDF13 Oct 2026View
D & C WILSON - OBJECTIONObjection Comment · PDF12 Oct 2026View
ALAN BILLINGSLEY - PEAT EXCAVATION OBJECTION AMENDEDObjection Comment · PDF12 Oct 2026View
RMNF - OBJECTION 8.10.2026Objection Comment · PDF12 Oct 2026View
A RAWSTERNE - OBJECTION 07.10.2026Objection Comment · PDF12 Oct 2026View
E METCALFE - OBJECTIONObjection Comment · PDF12 Oct 2026View
S PARKER - OBJECTIONObjection Comment · PDF12 Oct 2026View
A MEEK - OBJECTIONObjection Comment · PDF12 Oct 2026View
ROCHDALE & BURY BRIDLEWAYS ASSOCIATION - OBJECTIONObjection Comment · PDF9 Oct 2026View
THE COAL AUTHORITY - RESPONSEConsultee Comment · PDF9 Oct 2026View
EDDIE ROBERTS - ROSSENDALE WILDLIFE ADVISORY GRP BIRD REPORT 14 SEPT 1993Objection Comment · PDF7 Oct 2026View
EDDIE ROBBERTS - ORNITHOLOGY OBJECTION_REDACTEDObjection Comment · PDF7 Oct 2026View
SMWFII FEI CARBON CALCULATOR FINAL 2026.05.21Report6 Oct 2026View
HISTORIC ENGLAND - COMMENTSConsultee Comment · PDF5 Oct 2026View
RMNF - COMMENTS 25.09.2026 REDACTEDConsultee Comment · PDF2 Oct 2026View
RBC CLIMATE CHANGE OFFICER - COMMENTS REDACTEDConsultee Comment · PDF1 Oct 2026View
ANNE KCKEOWN - OBJECTION 30.09.2026Objection Comment · PDF30 Sept 2026View
INDICATIVE PLANS AND MICRO-SITING CONDITIONS ADVICE NOTEReport · PDF29 Sept 2026View
MAN AIRPORT RE-CONSULTATION RESPONSE - OBJECTIONConsultee Comment · PDF29 Sept 2026View
CANAL AND RIVER TRUST - NO COMMENTSConsultee Comment · PDF29 Sept 2026View
CADENT GAS - COMMENTS WITH MAPSConsultee Comment · PDF29 Sept 2026View
NATS SAFEGUARDING - OBJECTIONConsultee Comment · PDF29 Sept 2026View
BARTON AERODROME - NO OBJECTIONConsultee Comment · PDF29 Sept 2026View
LANCASHIRE CONSTABULARY DESIGNING OUT TEAM - COMMENTSConsultee Comment · PDF29 Sept 2026View
01137 SMII FEI ES V1 FIGURE 11.3 CUMULATIVE SEARCH AREA (A3)Report · PDF28 Sept 2026View
01137 SMII FEI ES V1 FIGURE 11.2 EXISTING LIGHT ENVIRONMENT (A3)Report · PDF28 Sept 2026View
01137 SMII FEI ES V1 FIGURE 11.1 LANDSCAPE CONTEXT (A3)Report · PDF28 Sept 2026View
01137 SMII FEI ES V1 FIGURE 11.6 ZTV TO HUB HEIGHT - BARE EARTH (A1)Report · PDF28 Sept 2026View
01137 SMII FEI ES V1 FIGURE 11.5 ZTP TO BLADE TIP - BARE EARTH (A1)Report · PDF28 Sept 2026View
01137 SMII FEI ES V1 FIGURE 11.4 CUMULATIVE LOCATION PLAN (A3)Report · PDF28 Sept 2026View
01137 SMII FEI ES V1 FIGURE 11.9A LANDSCAPE CHARACTER (A3)Report · PDF28 Sept 2026View
01137 SMII FEI ES V1 FIGURE 11.8 ZTV TO HUB HEIGHT WITH SCREENING (A1)Report · PDF28 Sept 2026View
01137 SMII FEI ES V1 FIGURE 11.7 ZTV TO BLADE TIP WITH SCREENING (A1)Report · PDF28 Sept 2026View
01137 SMII FEI ES V1 FIGURE 11.9B LOCAL LANDSCAPE CHARACTER KEY (A3)Report · PDF28 Sept 2026View
01137 SMII FEI ES V1 FIGURE 11.11 AVIATION LIGHTING ZTV ? BARE EARTH (A3)Report · PDF28 Sept 2026View
01137 SMII FEI ES V1 FIGURE 11.10 DESIGN ANALYSIS (A3)Report · PDF28 Sept 2026View
01137 SMII FEI ES V1 FIGURE 11.14 BARE EARTH ZTV WITH DESIGNATIONS (A3)Report · PDF28 Sept 2026View
01137 SMII FEI ES V1 FIGURE 11.13 BARE EARTH ZTV WITH VISUAL RECEPTORS (A3)Report · PDF28 Sept 2026View
01137 SMII FEI ES V1 FIGURE 11.12 BARE EARTH ZTV WITH LANDSCAPE CHARACTER (A3)Report · PDF28 Sept 2026View
01137 SMII FEI ES V1 FIGURE 11.16 CUMULATIVE ZTV CALDERDALE AND SCOUT MOOR II (AReport · PDF28 Sept 2026View
01137 SMII FEI ES V1 FIGURE 11.15 CUMULATIVE ZTV OPERATIONAL WITH SCOUT MOOR IIReport · PDF28 Sept 2026View
A BILLINGSLEY - OBJECTIONObjection Comment · PDF24 Sept 2026View
NATIONAL HIGHWAYS- RESPONSEConsultee Comment · PDF14 Sept 2026View
NEIGHBOUR COMMENT (OBJECTION) SUBMITTED ONLINEObjection Comment · PDF7 Sept 2026View
SCOUT MOOR II FEI - PLANNING DESIGN AND ACCESS STATEMENTReport · PDF3 Sept 2026View
SCOUT MOOR II - DOCUMENT AND DRAWING SCHEDULEReport27 Aug 2026View
01137 SMII FEI ES V2 APPENDIX 12.1 HERITAGE ASSESSMENTReport · PDF27 Aug 2026View
01137 SMII FEI ES V1 CHAPTER 12 BUILT HERITAGEReport · PDF27 Aug 2026View
T PICKUP - OBJECTION & REGULATION 25 REQUEST REDACTEDObjection Comment · PDF24 Aug 2026View
T PICKUP - FIGURE 1 - CUMULATIVE ZONE OF THEORETICAL VISIBILITYObjection Comment24 Aug 2026View
T PICKUP - APPENDIX B - SETTLEMENTS WITHIN THE OVERLAPObjection Comment · PDF24 Aug 2026View
T PICKUP - APPENDIX A - METHOD NOTE AND VERIFICATIONObjection Comment · PDF24 Aug 2026View
01137 SMII FEI ES V1 CHAPTER 16 ASSESSMENT OF CUMULATIVE EFFECTSReport · PDF13 Aug 2026View
01137 SMII FEI ES V1 FIGURE 7.3 CUMULATIVE WIND TURBINESReport · PDF13 Aug 2026View
01137 SMII FEI ES V1 FIGURE 7.2 OPERATIONAL NOISE ASSESSMENT AND NOISE MONITORINReport · PDF13 Aug 2026View
01137 SMII FEI ES V1 FIGURE 7.1 CONSTRUCTION NOISE ASSESSMENTReport · PDF13 Aug 2026View
01137 SMII FEI ES V1 CHAPTER 17 SUMMARYReport · PDF13 Aug 2026View
01137 SMII FEI ES V1 FIGURE 16.2 CUMULATIVE SHADOW FLICKER ASSESSMENTReport · PDF13 Aug 2026View
01137 SMII FEI ES V1 FIGURE 16.1 CUMULATIVE PROJECT PLAN (1)Report · PDF13 Aug 2026View
01137 SMII FEI ES V2 APPENDIX 7.1 CONSTRUCTION NOISE REPORTReport · PDF13 Aug 2026View
01137 SMII FEI ES V2 APPENDIX 2.4 POST SUBMISSION STATUTORY CONSULTATION COMMENTReport · PDF13 Aug 2026View
01137 SMII FEI ES V2 APPENDIX 7.2 OPERATIONAL NOISE REPORTReport · PDF13 Aug 2026View
01137 SMII FEI ES V2 HERITAGE ASSESSMENT APPENDICES 2-7Report · PDF13 Aug 2026View
01137 SMII FEI ES V2 HERITAGE ASSESSMENT APPENDICES 8-12Report · PDF13 Aug 2026View
SCOUT MOOR II FEI - APPLICANT RESPONSE TO CONSULTEE COMMENTSReport · PDF13 Aug 2026View
01137 SMII FEI ES V4 NON-TECHNICAL SUMMARYReport · PDF13 Aug 2026View
01137 SMII FEI ES V3 ENVIRONMENTAL MANAGEMENT PLANReport · PDF13 Aug 2026View
SCOUT MOOR II FEI - YOU SAID WE HEARD WE ACTEDReport · PDF13 Aug 2026View
01137 SMII FEI ES V1 CHAPTER 7 NOISE AND VIBRATIONReport · PDF13 Aug 2026View
01137 SMII FEI ES V1 CHAPTER 11 LANDSCAPE AND VISUALReport · PDF13 Aug 2026View
SCOUT MOOR II FEI - OWNERSHIP SCHEDULE (REDACTED)Report · PDF9 Jul 2026View
SCOUT MOOR II FEI - COVERING LETTER - ROSSENDALEReport · PDF9 Jul 2026View
SCOUT MOOR II FEI - COVERING LETTER - ROCHDALEReport · PDF9 Jul 2026View
SCOUT MOOR II ? TYPICAL WATER CROSSING METHODS ? SK15 REV P4Report · PDF9 Jul 2026View
SCOUT MOOR II ? TYPICAL TURBINE FOUNDATION DETAIL ? SK07 REV P4Report · PDF9 Jul 2026View
SCOUT MOOR II ? TYPICAL TURBINE ELEVATION ? SK06 REV P4Report · PDF9 Jul 2026View
SCOUT MOOR II ? TYPICAL TRACK DETAILS ? SK14 REV P4Report · PDF9 Jul 2026View
SCOUT MOOR II ? TYPICAL CRANE HARDSTANDING ? SK08 REV P4Report · PDF9 Jul 2026View
SCOUT MOOR II ? TYPICAL CONSTRUCTION COMPOUND ? SK12 REV P4Report · PDF9 Jul 2026View
SCOUT MOOR II ? TYPICAL COMPOUND FENCING ? SK13 REV P4Report · PDF9 Jul 2026View
SCOUT MOOR II ? TYPICAL CABLE TRENCH DETAILS ? SK09 REV P5Drawing · PDF9 Jul 2026View
SCOUT MOOR II ? SITE LOCATION PLAN ? SK01 REV P3Drawing · PDF9 Jul 2026View
SCOUT MOOR II ? SCOUT MOOR QUARRIES ACCESS DESIGN SWEPT PATH ASSESSMENT ? SK20 RDrawing · PDF9 Jul 2026View
SCOUT MOOR II ? SCOUT MOOR QUARRIES ACCESS DESIGN GENERAL ARRANGEMENT ? SK19 REVDrawing · PDF9 Jul 2026View
SCOUT MOOR II ? ROOLEY MOOR ROAD CROSSING PLAN VIEW ? SK17 REV P5Drawing · PDF9 Jul 2026View
SCOUT MOOR II ? ROOLEY MOOR ROAD CROSSING PLAN LONGITUDINAL SECTION ? SK16 REV PDrawing · PDF9 Jul 2026View
SCOUT MOOR II ? ROOLEY MOOR ROAD CROSSING CONSTRUCTION DETAIL ? SK18 REV P4Drawing · PDF9 Jul 2026View
SCOUT MOOR II ? INFRASTRUCTURE LAYOUT ? SK02 REV P4Drawing · PDF9 Jul 2026View
SCOUT MOOR II ? INFRASTRUCTURE LAYOUT OPERATIONAL PHASE ? SK04 REV P5Drawing · PDF9 Jul 2026View
SCOUT MOOR II ? INFRASTRUCTURE LAYOUT INDICATIVE DECOMMISSIONING PLAN ? SK05 REVDrawing · PDF9 Jul 2026View
SCOUT MOOR II ? INFRASTRUCTURE LAYOUT CONSTRUCTION PHASE ? SK03 REV P4Drawing · PDF9 Jul 2026View
SCOUT MOOR II - SCOUT MOOR QUARRIES LAYDOWN AREA AND JUNCTION SWEPT PATH ASSESSMDrawing · PDF9 Jul 2026View
SCOUT MOOR II - SCOUT MOOR QUARRIES LAYDOWN AREA AND JUNCTION GA - SK21 REV P4Drawing · PDF9 Jul 2026View
SCOUT MOOR II - INDICATIVE ONSITE SUBSTATION LAYOUT - SK10 REV P5Drawing · PDF9 Jul 2026View
SCOUT MOOR II - INDICATIVE ONSITE SUBSTATION ELEVATIONS - SK11 REV P5Drawing · PDF9 Jul 2026View
SCOUT MOOR II - INDICATIVE FENCING LAYOUT (VERSION 10)Drawing · PDF9 Jul 2026View
SCOUT MOOR II - FEI SITE BOUNDARY COMPARISON PLANDrawing · PDF9 Jul 2026View
SCOUT MOOR II - CABLE ROUTE OPTIONS - VERSION 4Drawing · PDF9 Jul 2026View
SCOUT MOOR II - AVIATION LIGHTING - VERSION 8Drawing · PDF9 Jul 2026View
SCOUT MOOR II FEI - DRAFT SECTION 106 AGREEMENT ROSSENDALE (01-06-26)Report · PDF9 Jul 2026View
SCOUT MOOR II FEI - DRAFT SECTION 106 AGREEMENT ROCHDALE (01-06-26)Report · PDF9 Jul 2026View
SCOUT MOOR II FEI - BIODIVERSITY NET GAIN REPORTReport · PDF9 Jul 2026View
SCOUT MOOR II FEI - AVIATION AND MET RADAR ASSESSMENTReport · PDF9 Jul 2026View
SCOUT MOOR II FEI - AIR QUALITY ASSESSMENTReport · PDF9 Jul 2026View
SCOUT MOOR II FEI - MINERAL RESOURCE ASSESSMENTReport · PDF9 Jul 2026View
SCOUT MOOR II FEI - HEALTH IMPACT ASSESSMENTReport · PDF9 Jul 2026View
SCOUT MOOR II FEI - FLOOD RISK ASSESSMENTReport · PDF9 Jul 2026View
SCOUT MOOR II FEI - ECONOMIC AND SOCIAL BENEFITS STATEMENTReport · PDF9 Jul 2026View
SCOUT MOOR II FEI - DRAINAGE STRATEGYReport · PDF9 Jul 2026View
SCOUT MOOR II FEI - OUTLINE HABITAT MANAGEMENT AND MONITORING PLANReport · PDF9 Jul 2026View
SCOUT MOOR II FEI - OUTLINE DECOMMISSIONING RESTORATION AND AFTERCARE STRATEGYReport · PDF9 Jul 2026View
SCOUT MOOR II FEI - OUTDOOR ACCESS MEPReport · PDF9 Jul 2026View
SCOUT MOOR II FEI - MOORLAND RESTORATION AND MANAGEMENT PLANReport · PDF9 Jul 2026View
SCOUT MOOR II FEI - MINING RISK ASSESSMENTReport · PDF9 Jul 2026View
SCOUT MOOR II FEI - MINING RISK ASSESSMENTReport · PDF9 Jul 2026View
SCOUT MOOR II FEI - RVAA ANNEX 3 DETAILED PROPERTY ASSESSMENT SHEETSReport · PDF9 Jul 2026View
SCOUT MOOR II FEI - RESIDENTIAL VISUAL AMENITY ASSESSMENTReport · PDF9 Jul 2026View
SCOUT MOOR II FEI - PRELIMINARY RISK ASSESSMENTReport · PDF9 Jul 2026View
SCOUT MOOR II FEI - RVAA-VISUALS_WEBReport · PDF9 Jul 2026View
SCOUT MOOR II FEI - RVAA FIGURE 3BReport · PDF9 Jul 2026View
SCOUT MOOR II FEI - RVAA FIGURE 3AReport · PDF9 Jul 2026View
SCOUT MOOR II FEI - RVAA FIGURE 2Report · PDF9 Jul 2026View
SCOUT MOOR II FEI - RVAA FIGURE 1Report · PDF9 Jul 2026View
SCOUT MOOR II FEI - RVAA-VISUALS_PRNTReport · PDF9 Jul 2026View
SCOUT MOOR II FEI - TELECOMMUNICATIONS IMPACT ASSESSMENTReport · PDF9 Jul 2026View
SCOUT MOOR II FEI - SUSTAINABILITY ENERGY AND CLIMATE CHANGE STATEMENTReport · PDF9 Jul 2026View
SCOUT MOOR II FEI - RVAA-VISUALS_WEBReport · PDF9 Jul 2026View
SCOUT MOOR II FEI - THE_STATUTORY_BIODIVERSITY_METRIC_CALCULATION_TOOL REV5Report9 Jul 2026View
SCOUT MOOR II FEI - TRANSPORT ASSESSMENT (INC AIL SURVEY)Report · PDF9 Jul 2026View
01137 SMII FEI ES V1 CONTENTS PAGEReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 1.1 ASSESSMENT BOUNDARYReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 CHAPTER 1 INTRODUCTIONReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 CHAPTER 2 APPROACH TO EIAReport · PDF9 Jul 2026View
01137 SMII ES V1 CHAPTER 3 ASSESSMENT BOUNDARY CONTEXTReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 4.9 SMQ ACCESS DESIGN SWEPT PATH ASSESSMENT (SK20 REReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 4.8 SMQ LAYDOWN AREA AND JUNCTION GENERAL ARRANGEMENReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 4.7 SMQ ACCESS DESIGN GENERAL ARRANGEMENT (SK19 REVReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 4.6 ROOLEY MOOR ROAD CROSSING CONSTRUCTION DETAIL (SReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 4.5 ROOLEY MOOR ROAD CROSSING PLAN & LONGITUDINAL SEReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 4.4 ROOLEY MOOR ROAD CROSSING PLAN VIEW (SK17 REV 5)Report · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 4.3 INFRASTRUCTURE LAYOUT - OPERATIONAL PHASE (SK04Report · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 4.24 INFRASTRUCTURE LAYOUT - INDICATIVE DECOMMISSIONReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 4.23 PROPOSED INDICATIVE FENCING LAYOUT WITH ACCESSReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 4.22 TYPICAL WATER CROSSING METHODS (SK15 REV 4)Report · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 4.21 TYPICAL TRACK DETAILS (SK14 REV 4)Report · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 4.20 TYPICAL COMPOUND FENCING (SK13 REV 4)Report · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 4.2 INFRASTRUCTURE LAYOUT - CONSTRUCTION PHASE (SK03Report · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 4.19 TYPICAL CONSTRUCTION COMPOUND (SK12 REV 4)Report · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 4.18 CABLE ROUTE OPTIONS (VERSION 4)Report · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 4.17 INDICATIVE ONSITE SUBSTATION ELEVATION (P5)Report · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 4.16 INDICATIVE ONSITE SUBSTATION LAYOUT (P5)Report · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 4.15 TYPICAL CABLE TRENCH DETAILS (33KV & 132KV) (SKReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 4.14 TYPICAL CRANE HARDSTANDING (SK08 REV 4)Report · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 4.13 TYPICAL TURBINE FOUNDATION DETAIL (SK07 REV 4)Report · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 4.12 TYPICAL TURBINE ELEVATION (SK06 REV 4)Report · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 4.11 AVIATION LIGHTING (VERSION 3)Report · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 4.10 SMQ LAYDOWN AREA AND JUNCTION SWEPT PATH ASSESSReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 4.1 INFRASTRUCTURE LAYOUT (SK02 REV P4)Report · PDF9 Jul 2026View
01137 SMII FEI ES V1 CHAPTER 4 DEVELOPMENT SPECIFICATIONReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 CHAPTER 5 CONSIDERATION OF ALTERNATIVESReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 CHAPTER 6 TRANSPORT AND ACCESSReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 8.1 STUDY AREA AND SHADOW FLICKER ASSESSMENT LOCATIOReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 CHAPTER 8 SHADOW FLICKER 29.05.26 (CLEAN)Report · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 9.8 PEATLAND RESTORATION PROPOSALSReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 9.7 POST DEVELOPMENT HABITATS - OVERVIEWReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 9.6 EDNA RESULTSReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 9.5 BAT STATIC LOCATIONSReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 9.3 NVC BASELINE FIGURE - OVERVIEWReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 9.2 UKHAB BASELINE FIGURE - OVERVIEWReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 9.1B NON-STATUTORY DESIGNATIONSReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 9.1A DESIGNATED SITES WITHIN 10KMReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 CHAPTER 9 ECOLOGY 02.06.26 (CLEAN)Report · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 10.6 BREEDING BIRD SURVEY RESULTS 2024 - SKYLARKReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 10.5 BREEDING BIRD SURVEY RESULTS 2023 - SKYLARKReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 10.4 BREEDING BIRD SURVEY RESULTS 2024Report · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 10.3 BREEDING BIRD SURVEY RESULTS 2023Report · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 10.2 BREEDING BIRD SURVEY RESULTS 2022Report · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 10.1B NON-STATUTORY DESIGNATIONS WITHIN 2KM - ORNITHReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 10.1A DESIGNATED SITES WITHIN 10KM - ORNITHOLOGYReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 10.14 VANTAGE POINT LOCATIONS AND VIEWSHEDSReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 10.13 VANTAGE POINT SURVEY RESULTS - WATERFOWL (APRIReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 10.12 VANTAGE POINT SURVEY RESULTS - KESTREL (APRILReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 10.11 VANTAGE POINT SURVEY RESULTS - RAPTORS (APRILReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 10.10 VANTAGE POINT SURVEY RESULTS - WADERS (APRIL 2Report · PDF9 Jul 2026View
01137 SMII FEI ES V1 CHAPTER 10 ORNITHOLOGYReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 12.9 HERITAGE ASSET PLAN WITH ASSETS ASSESSED WITHINReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 12.8 HERITAGE ASSET PLAN WITH HUB HEIGHT WITH SCREENReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 12.7 HERITAGE ASSET PLAN WITH BLADE TIP WITH SCREENIReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 12.6 HERITAGE ASSET PLAN WITH BARE EARTH HUB HEIGHTReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 12.5 HERITAGE ASSET PLAN WITH BARE EARTH BLADE TIP ZReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 12.4 HERITAGE ASSET PLANReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 12.3 1930-31 ORDNANCE SURVEY 6 INCHReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 12.2 1894-5 ORDNANCE SURVEY 6 INCHReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 12.11 HERITAGE ASSET PLAN WITH ASSETS ASSESSED WITHIReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 12.10 HERITAGE ASSET PLAN WITH ASSETS ASSESSED WITHIReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 12.1 1851 ORDNANCE SURVEY 6 INCHReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 CHAPTER 13 ARCHAEOLOGYReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 14.9 ESTIMATED PEAT DEPTHReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 14.8 PEAT DEPTH OF PENETRATION AND PROBE LOCATIONSReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 14.7 GROUNDWATER DEPENDENT TERRESTRIAL ECOSYSTEMS (GReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 14.6 HYDROGEOLOGICAL REGIMEReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 14.5D HYDROLOGICAL FEATURESReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 14.5C HYDROLOGICAL FEATURESReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 14.5B HYDROLOGICAL FEATURESReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 14.5A HYDROLOGICAL FEATURESReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 14.5 HYDROLOGICAL FEATURESReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 14.4 BEDROCK GEOLOGYReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 14.3 SUPERFICIAL GEOLOGYReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 14.2 SOILS AND PEAT MAPPINGReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 14.11 PEATLAND CONDITION ASSESSMENTReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 14.10 PEAT RESTORATION AREASReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 FIGURE 14.1 HYDROLOGICAL SETTINGReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 CHAPTER 14 HYDROLOGY, HYDROGEOLOGY AND PEATReport · PDF9 Jul 2026View
01137 SMII FEI ES V1 CHAPTER 15 CLIMATE CHANGEReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 CONTENTS PAGEReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 1.2 SCHEDULE OF COMPETENCEReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 1.1 REQUIRED INFORMATIONReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 2.3 NON-STATUTORY CONSULTATION COMMENTSReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 2.2 STATUTORY CONSULTATION COMMENTSReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 2.1 EIA SCOPING REPORTReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 6.1 TRANSPORT ASSESSMENTReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 9.5 GRID CONNECTION ECOLOGY WALKOVER.Report · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 9.4 GREAT CRESTED NEWT AND AMPHIBIANSReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 9.3 BAT ACTIVITY REPORTReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 9.1 DESK STUDY AND HABITATS RESULTSReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 10.3 YEAR 3 ORNITHOLOGY REPORTReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 10.2 YEAR 2 ORNITHOLOGY REPORTReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 10.1 YEAR 1 ORNITHOLOGY REPORTReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 11.7 LVIA ILLUSTRATIVE WIRELINESReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 11.6 RVAA VISUALS (WEB)Report · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 11.6 RVAA ANNEX 3 DETAILED PROPERTY ASSESSMENT SHEReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 11.6 RESIDENTIAL VISUAL AMENITY ASSESSMENT (RVAA)Report · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 11.6 RVAA FIGURE 3B (A3)Report · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 11.6 RVAA FIGURE 3A (A3)Report · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 11.6 RVAA FIGURE 2 (A3)Report · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 11.6 RVAA FIGURE 1 (A3)Report · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 11.5 LANDSCAPE SENSITIVITYReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 11.4 VIEWPOINT ANALYSISReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 11.3 LANDSCAPE CHARACTER BASELINEReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 11.2 VISUALS METHODOLOGYReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 11.1 LVIA METHODOLOGYReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 12.7 WIRELINE VISUALISATIONS AND REFERENCE PHOTOGRReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 12.2-12.6Report · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 13.1 ADBA PART 4 OF 4Report · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 13.1 ADBA PART 3 OF 4Report · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 13.1 ADBA PART 2 OF 4Report · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 13.1 ADBA PART 1 OF 4Report · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 14.9 PEAT CONDITION ASSESSMENTReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 14.8 GROUNDWATER DEPENDENT TERRESTRIAL ECOSYSTEMSReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 14.7 PUBLIC WATER SUPPLY ASSESSMENTReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 14.6 PRIVATE WATER SUPPLY ASSESSMENTReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 14.5 WATERCOURSE CROSSING INVENTORYReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 14.4 PEAT LANDSLIDE HAZARD & RISK ASSESSMENTReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 14.3 OUTLINE PEAT MANAGEMENT PLANReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 14.2 PEAT SURVEY REPORTReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 14.1 GOOD PRACTICE METHODSReport · PDF9 Jul 2026View
01137 SMII FEI ES V2 APPENDIX 15.1 CARBON CALCULATOR INPUT DATA & RESULTSReport · PDF9 Jul 2026View
01137 FEI VISUALISATIONS (CH) - WEBReport · PDF9 Jul 2026View
01137 FEI VISUALISATIONS (NS) - WEBReport · PDF9 Jul 2026View
01137 FEI VISUALISATIONS (NS) - WEBReport · PDF9 Jul 2026View
01137 FEI VISUALISATIONS (NS) - WEBReport · PDF9 Jul 2026View
NATIONAL HIGHWAYS - COMMENTS 12.06.2026Consultee Comment · PDF12 Jun 2026View
A BILLINGSLEY - OBJECTION - ANALYSIS OF INTERCONNECTION ROADS SCOUT MOOR 2Objection Comment · PDF26 May 2026View
JBA CONSULTING COMMENTSConsultee Comment · PDF12 May 2026View
A GERDES - OBJECTIONObjection Comment · PDF16 Apr 2026View
NATIONAL HIGHWAYS - COMMENTS 11.03.2026 REDACTEDConsultee Comment · PDF17 Mar 2026View
LCC PUBLIC RIGHTS OF WAY - COMMENTSConsultee Comment · PDF17 Mar 2026View
METRICA - COMMENTSConsultee Comment · PDF9 Mar 2026View
NATURAL ENGLAND - (UPDATED COMMENTS)Consultee Comment · PDF5 Feb 2026View
LCC MINERALS PLANNING TEAM - COMMENTSConsultee Comment · PDF2 Feb 2026View
BURY DEVELOPMENT MANAGEMENT - COMMENTS.Consultee Comment · PDF26 Jan 2026View
NATURAL ENGLAND - COMMENTSConsultee Comment · PDF26 Jan 2026View
NATIONAL HIGHWAYS COMMENTSConsultee Comment · PDF8 Jan 2026View
LLFA - FURTHER COMMENTSConsultee Comment · PDF10 Dec 2025View
GROWTH LANCASHIRE - COMMENTSConsultee Comment · PDF10 Dec 2025View
A RAWSTERNE - OBJECTION 08.12.2025 01 SCOUT MOOR NOISE OBJECTION LETTERObjection Comment · PDF9 Dec 2025View
A RAWSTERNE - OBJECTION 08.12.2025 02 CONTENTS PAGE - GROS CONS REF 2025_0267 SCObjection Comment · PDF9 Dec 2025View
A RAWSTERNE - OBJECTION 08.12.2025 03 GROSVENOR CONSULTANCY REF 2025_0267 SCOUTObjection Comment · PDF9 Dec 2025View
A RAWSTERNE - OBJECTION 08.12.2025 04 ANNEX 1. GROS CONS - SCOUT MOOR 2 - RESIDEObjection Comment · PDF9 Dec 2025View
A RAWSTERNE - OBJECTION 08.12.2025 05 ANNEX 1A. GROS CONS -SCOUT MOOR 2 - RESIDEObjection Comment · PDF9 Dec 2025View
A RAWSTERNE - OBJECTION 08.12.2025 06 ANNEX 2 SCOUT MOOR INWG_WP1_11_NOV_2015_ DObjection Comment · PDF9 Dec 2025View
A RAWSTERNE - OBJECTION 08.12.2025 07 ANNEX 3 SCOUT MOOR 2 - IOA VOL. 37. PT.2 2Objection Comment · PDF9 Dec 2025View
A RAWSTERNE - OBJECTION 08.12.2025 08 ANNEX 4. GROS CONS SCOUT MOOR 2 RITA HOLMEObjection Comment · PDF9 Dec 2025View
A RAWSTERNE - OBJECTION 08.12.2025 09 ANNEX 5. GROS CONS - SCOUT MOOR 2 IARO-COMObjection Comment · PDF9 Dec 2025View
A RAWSTERNE - OBJECTION 08.12.2025 10 ANNEX 6. GROS CONS SCOUT MOOR 2 INWG ANALYObjection Comment · PDF9 Dec 2025View
A RAWSTERNE - OBJECTION 08.12.2025 11 ANNEX 7. GROS CONS SCOUT MOOR 2 - IARO RESObjection Comment · PDF9 Dec 2025View
A RAWSTERNE - OBJECTION 08.12.2025 12 ANNEX 8. CROS CONS SCOUT MOOR 2. PEER REVIObjection Comment · PDF9 Dec 2025View
A RAWSTERNE - OBJECTION 08.12.2025 13 ANNEX 9. GROS CONS SCOUT MOOR 2. MEETING MObjection Comment · PDF9 Dec 2025View
A RAWSTERNE - OBJECTION 08.12.2025 14 ANNEX 10. GROS CONS SCOUT MOOR 2. IARO CHAObjection Comment · PDF9 Dec 2025View
A RAWSTERNE - OBJECTION 08.12.2025 15 ANNEX 11. CROS CONS SCOUT MOOR 2- IRE-2024Objection Comment · PDF9 Dec 2025View
A RAWSTERNE - OBJECTION 08.12.2025 16 ANNEX 11A GROS CONS SCOUT MOOR 2. EXTRACTSObjection Comment · PDF9 Dec 2025View
A RAWSTERNE - OBJECTION 08.12.2025 17 ANNEX 12. GROS CONS SCOUT MOOR 2. 2025_IEHObjection Comment · PDF9 Dec 2025View
A RAWSTERNE - OBJECTION 08.12.2025 18 ANNEX 12A. GROS CONS SCOUT MOOR 2 - EXTRACObjection Comment · PDF9 Dec 2025View
A RAWSTERNE - OBJECTION 08.12.2025 19 ANNEX 13. GROS CONS SCOUT MOOR 2. WTN DANIObjection Comment · PDF9 Dec 2025View
A RAWSTERNE - OBJECTION 08.12.2025 20 ANNEX 14. GROS CONS SCOUT MOOR 2. FINNISHObjection Comment · PDF9 Dec 2025View
BARTON AERODROME - COMMENTSConsultee Comment · PDF3 Dec 2025View
A & A GIBSON - OBJECTION REDACTEDObjection Comment · PDF30 Nov 2025View
FRIENDS OF THE EARTH - SUPPORTING COMMENTSupport Comment · PDF17 Nov 2025View
RSPB - COMMENTS REDACTEDConsultee Comment · PDF14 Nov 2025View
HYNDBURN BC - COMMENTS REDACTEDConsultee Comment · PDF13 Nov 2025View
I & M TATTERSALL - OBJECTION REDACTEDObjection Comment · PDF11 Nov 2025View
P SUTHERLAND - OBJECTIONObjection Comment · PDF11 Nov 2025View
PETER DAWSON - OBJECTIONObjection Comment · PDF10 Nov 2025View
JOANNE ASH - OBJECTIONObjection Comment · PDF10 Nov 2025View
LCC HIGHWAYS - COMMENTSConsultee Comment · PDF10 Nov 2025View
LANCASHIRE WILDLIFE TRUST - COMMENTSConsultee Comment · PDF3 Nov 2025View
A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 02.11.2025 REDACTEDObjection Comment · PDF2 Nov 2025View
N MORRELL - OBJECTIONObjection Comment · PDF23 Oct 2025View
NORDEN AREA FORUM - OBJECTIONObjection Comment · PDF23 Oct 2025View
JANE MURPHY - OBJECTIONObjection Comment · PDF23 Oct 2025View
OBJECTION S THORPEObjection Comment · PDF22 Oct 2025View
OBJECTION K THORPEObjection Comment · PDF22 Oct 2025View
KAREN COWLEY - OBJECTIONObjection Comment · PDF22 Oct 2025View
MARGARET TURNER - OBJECTIONObjection Comment · PDF20 Oct 2025View
J HIGNETT - FURTHER OBJECTION REDACTEDObjection Comment · PDF19 Oct 2025View
C HIGNETT - FURTHER OBJECTION REDACTEDObjection Comment · PDF19 Oct 2025View
PAUL BUCHANAN - OBJECTIONObjection Comment · PDF15 Oct 2025View
ECOLOGY - COMMENTSConsultee Comment · PDF13 Oct 2025View
ROSSENDALE CIVIC TRUST - COMMENTSObjection Comment · PDF13 Oct 2025View
J COLLINS - OBJECTION - SUPPORTING DOCUMENTS - NOT REDACTED AS REQUESTED BY J COObjection Comment · PDF13 Oct 2025View
J COLLINS - OBJECTION - PUBLIC SUBMISSIONS ON SCOUT MOORE IIM - NOT REDACTED ASObjection Comment · PDF13 Oct 2025View
J COLLINS - OBJECTION - COVER LETTER - NOT REDACTED AS REQUESTED BY J COLLINSObjection Comment · PDF13 Oct 2025View
NATIONAL TRUST - COMMENTS REDACTEDConsultee Comment · PDF10 Oct 2025View
UNITED UTILITIES - COMMENTSConsultee Comment · PDF10 Oct 2025View
MET OFFICE - COMMENTSConsultee Comment · PDF9 Oct 2025View
SUSAN HARRISON - OBJECTIONObjection Comment · PDF9 Oct 2025View
APPLICANT RESPONSE TO PUBLIC QUERIESSuperseded · PDF8 Oct 2025View
ANN ELMER - REDACTED - OBJECTIONObjection Comment · PDF8 Oct 2025View
A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 07.10.2025 REDACTEDObjection Comment · PDF7 Oct 2025View
J NEWCOMBE - FURTHER OBJECTIONObjection Comment · PDF7 Oct 2025View
S DAVISON - OBJECTIONObjection Comment · PDF7 Oct 2025View
K BENTHAM - OBJECTION REDACTEDObjection Comment · PDF6 Oct 2025View
GARDENS TRUST - COMMENTS REDACTEDConsultee Comment · PDF5 Oct 2025View
SCOUT MOOR II - STATEMENT OF COMMUNITY INVOLVEMENTReport · PDF3 Oct 2025View
SCOUT MOOR II - BIODIVERSITY NET GAIN ASSESSMENTSuperseded · PDF3 Oct 2025View
HISTORIC ENGLAND - COMMENTSConsultee Comment · PDF2 Oct 2025View
MHCLG EMAIL 20TH AUGUST 2025Report · PDF1 Oct 2025View
MHCLG EMAIL 27TH AUGUST 2025Report · PDF1 Oct 2025View
MHCLG EMAIL 29TH SEPTEMBER 2025Report · PDF1 Oct 2025View
NBH BRIDLEWAYS ASSOCIATION - COMMENTSConsultee Comment · PDF30 Sept 2025View
W WRIGHT - OBJECTIONObjection Comment · PDF30 Sept 2025View
SMWFII CARBON CALCULATORSuperseded29 Sept 2025View
A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 29.09.2025 REDACTEDObjection Comment · PDF29 Sept 2025View
A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 27.09.2025 REDACTEDObjection Comment · PDF27 Sept 2025View
ENVIRONMENTAL PROTECTION - COMMENTSConsultee Comment · PDF26 Sept 2025View
A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 26.09.2025 REDACTEDObjection Comment · PDF26 Sept 2025View
LCC HISTORIC ENVIRONMENT TEAM - COMMENTS REDACTEDConsultee Comment · PDF25 Sept 2025View
LLFA RESPONSEConsultee Comment · PDF24 Sept 2025View
A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 24.09.2025 REDACTEDObjection Comment · PDF24 Sept 2025View
S & C HIGGINBOTHAM - OBJECTIONObjection Comment · PDF24 Sept 2025View
M HIGGINBOTHAM - OBJECTIONObjection Comment · PDF24 Sept 2025View
E DALBY - OBJECTIONObjection Comment · PDF24 Sept 2025View
JOHN BURNS - OBJECTIONObjection Comment · PDF23 Sept 2025View
RBC CLIMATE CHANGE - COMMENTS REDACTEDConsultee Comment · PDF23 Sept 2025View
ENVIRONMENT AGENCY - COMMENTSConsultee Comment · PDF22 Sept 2025View
A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 22.09.2025 REDACTEDObjection Comment · PDF22 Sept 2025View
JOHN NEWCOMBE ON BEHALF OF THE P&BFCA VILLAGE HERITAGE ASSET - OBJECTIONConsultee Comment · PDF20 Sept 2025View
A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 20.09.2025 REDACTEDObjection Comment · PDF20 Sept 2025View
THE COAL AUTHORITY - COMMENTSConsultee Comment · PDF17 Sept 2025View
MAG SAFEGUARDING - COMMENTSConsultee Comment · PDF17 Sept 2025View
POLICE ARCHITECTURAL LIAISON - COMMENTSConsultee Comment · PDF16 Sept 2025View
J HIGNETT - OBJECTION REDCATEDObjection Comment · PDF15 Sept 2025View
C HIGNETT - OBJECTION REDACTEDObjection Comment · PDF15 Sept 2025View
C PEAT FOREST OF ROSSENDALE BRIDLEWAYS ASSOCIATION - FURTHER OBJECTION REDACTEDObjection Comment · PDF12 Sept 2025View
HEALTH & SAFETY EXECUTIVE - FURTHER COMMENTSConsultee Comment · PDF11 Sept 2025View
A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 10.09.2025 REDACTEDObjection Comment · PDF10 Sept 2025View
COUNCIL OF BRITISH ARCHAEOLOGY - COMMENTS REDACTEDConsultee Comment · PDF10 Sept 2025View
A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 10.09.2025 1Objection Comment · PDF10 Sept 2025View
A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 10.09.2025 2Objection Comment · PDF10 Sept 2025View
A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 10.09.2025 2 ATTACHMENT BObjection Comment10 Sept 2025View
A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 10.09.2025 2 ATTACHMENT AObjection Comment10 Sept 2025View
A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 10.09.2025 3Objection Comment · PDF10 Sept 2025View
A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 10.09.2025 4Objection Comment · PDF10 Sept 2025View
A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 10.09.2025 5Objection Comment · PDF10 Sept 2025View
HEALTH & SAFETY EXECUTIVE - COMMENTSConsultee Comment · PDF9 Sept 2025View
A RAWSTERNE ON BEHALF OF ROOLEY MOOR NEIGHBOURHOOD FORUM-OBJECTION REDACTEDObjection Comment · PDF9 Sept 2025View
NATS SAFEGUARDING - COMMENTSConsultee Comment · PDF8 Sept 2025View
BOLTON COUNCIL - COMMENTSConsultee Comment · PDF8 Sept 2025View
BURNLEY COUNCIL - FURTHER COMMENTSConsultee Comment · PDF8 Sept 2025View
BURNLEY COUNCIL - COMMENTS REDACTEDConsultee Comment · PDF5 Sept 2025View
CANAL & RIVER TRUST - COMMENTSConsultee Comment · PDF5 Sept 2025View
NEIL GRAYSON - OBJECTIONObjection Comment · PDF3 Sept 2025View
C PEAT FOREST OF ROSSENDALE BRIDLEWAYS ASSOCIATION - OBJECTION REDACTEDObjection Comment · PDF3 Sept 2025View
DAVID TRIVETT - FURTHER OBJECTIONObjection Comment · PDF1 Sept 2025View
S FLETCHER - OBJECTIONObjection Comment · PDF23 Aug 2025View
K FLETCHER - OBJECTIONObjection Comment · PDF23 Aug 2025View
J WHITEHEAD ON BEHALF OF SAY NO TO SCOUT MOOR 2 GROUP - OBJECTIONObjection Comment · PDF21 Aug 2025View
DAVID TRIVETT - OBJECTIONObjection Comment · PDF21 Aug 2025View
RMNF - OBJECTIONObjection Comment · PDF14 Aug 2025View
DATED JULY 2025 - OUTLINE DECOMMISSIONING STRATEGYSuperseded · PDF7 Aug 2025View
DATED JULY 2025 - SECTION 106 HEAD OF TERMSSuperseded · PDF7 Aug 2025View
BNG ADDENDUMSuperseded · PDF7 Aug 2025View
VISUALISATIONS (CH)Superseded · PDF1 Aug 2025View
OWNERSHIP SCHEDULESuperseded · PDF31 Jul 2025View
T HUNTER - SUPPORTSupport Comment · PDF31 Jul 2025View
DATED JULY 2025 - PLANNING DESIGN AND ACCESS STATEMENTSuperseded · PDF23 Jul 2025View
APPLICATION FORM REDACTEDSuperseded · PDF23 Jul 2025View
COVERING LETTEROther · PDF23 Jul 2025View
SK01 REV P1 - SITE LOCATION PLANSuperseded · PDF2 Jul 2025View
SK02 REV P1 - INFRASTRUCTURE LAYOUTSuperseded · PDF2 Jul 2025View
SK03 REV P1 - INFRASTRUCTURE LAYOUT - CONSTRUCTION PHASESuperseded · PDF2 Jul 2025View
SK04 REV P2 - INFRASTRUCTURE LAYOUT - OPERATIONAL PHASESuperseded · PDF2 Jul 2025View
SK16 REV 2 - CROSSING PLAN & SECTIONSuperseded · PDF2 Jul 2025View
SK17 REV 2 - CROSSING PLAN VIEWSuperseded · PDF2 Jul 2025View
SK18 REV 2 - CROSSING CONSTRUCTION DETAILSuperseded · PDF2 Jul 2025View
SK19 REV 2 - ACCESS DESIGN GASuperseded · PDF2 Jul 2025View
SK21 REV 2 - LAYDOWN AND JUNCTION GASuperseded · PDF2 Jul 2025View
SK20 REV 2 - ACCESS DESIGN SWEPT PATHSuperseded · PDF2 Jul 2025View
SK22 REV 2 - LAYDOWN AND JUNCTION SWEPT PATHSuperseded · PDF2 Jul 2025View
SK15 REV 2 - TYPICAL WATERCOURSE CROSSING METHODSSuperseded · PDF2 Jul 2025View
SK14 REV 2 - TYPICAL TRACK DETAILSSuperseded · PDF2 Jul 2025View
SK13 REV 2 - TYPICAL COMPOUND FENCINGSuperseded · PDF2 Jul 2025View
SK12 REV 2 - TYPICAL CONSTRUCTION COMPOUNDSuperseded · PDF2 Jul 2025View
SK11 REV 2 - INDICATIVE ONSITE SUBSTATION ELEVATIONSuperseded · PDF2 Jul 2025View
SK10 REV 2 - INDICATIVE ONSITE SUBSTATION LAYOUTSuperseded · PDF2 Jul 2025View
SK09 REV 2 - TYPICAL CABLE TRENCH DETAILSuperseded · PDF2 Jul 2025View
SK08 REV 2 - TYPICAL CRANE HARDSTANDING DETAILSuperseded · PDF2 Jul 2025View
SK07 REV 2 - TYPICAL TURBINE FOUNDATION DETAILSuperseded · PDF2 Jul 2025View
SK06 REV 2 - TYPICAL TURBINE ELEVATIONSuperseded · PDF2 Jul 2025View
SK05 REV P1 - INFRASTRUCTURE LAYOUT - INDICATIVE DECOMMISSIONING PLANSuperseded · PDF2 Jul 2025View
VERSION 6 (DATED 20/05/2025) - PROPOSED INDICATIVE FENCING LAYOUT WITH ACCESS POSuperseded · PDF2 Jul 2025View
230509 REV S01 - DRAINAGE STRATEGYSuperseded · PDF2 Jul 2025View
8706 HMMP REV 3 - HABITAT MANAGEMENT AND MONITORING PLAN (REV 3)Superseded · PDF2 Jul 2025View
8706 MRMP REV 5 - MOORLAND RESORATION AND MANAGEMENT PLAN (REV 5)Superseded · PDF2 Jul 2025View
DATED JUNE 2025 - OUTDOOR ACCESS MANAGEMENT & ENHANCEMENT PLANSuperseded · PDF2 Jul 2025View
J10-15729B-10 F2 - AIR QUALITY ASSESSMENTSuperseded · PDF2 Jul 2025View
DATED 07 MAY 2025 - AVIATION AND MET RADAR IMPACT ASSESSMENTSuperseded · PDF2 Jul 2025View
FIGURE 3A - RESIDENTIAL VISUAL AMENITY ASSESSMENTSuperseded · PDF2 Jul 2025View
FIGURE 3B - RESIDENTIAL VISUAL AMENITY ASSESSMENTSuperseded · PDF2 Jul 2025View
130125 REV P03 - FLOOD RISK ASSESSMENTSuperseded · PDF2 Jul 2025View
DATED JUNE 2025 - HEALTH IMPACT ASSESSMENTSuperseded · PDF2 Jul 2025View
109692-PEF-ZZ-XX-RP-GG-7002 P03 - MINERAL RESOURCE ASSESSMENTSuperseded · PDF2 Jul 2025View
109692-PEF-ZZ-XX-RP-GG-6001 P03 - PRELIMINARY RISK ASSESSMENTSuperseded · PDF2 Jul 2025View
DATED JUNE 2005 - RESIDENTIAL VISUAL AMENITY ASSESSMENT (RVAA)Superseded · PDF2 Jul 2025View
ANNEX 3 - RESIDENTIAL VISUAL AMENITY ASSESSMENT DETAILED PROPERTY ASSESSMENT SHESuperseded · PDF2 Jul 2025View
FIGURE 1 - RESIDENTIAL VISUAL AMENITY ASSESSMENTSuperseded · PDF2 Jul 2025View
FIGURE 2 - RESIDENTIAL VISUAL AMENITY ASSESSMENTSuperseded · PDF2 Jul 2025View
DATED JUNE 2025 - RESIDENTIAL VISUAL AMENITY ASSESSMENT VISUALSSuperseded · PDF2 Jul 2025View
DATED JUNE 2025 - SUSTAINABILITY ENERGY & CLIMATE CHANGE STATEMENTSuperseded · PDF2 Jul 2025View
13110B ISSUE 03 - TELECOMMUNICATIONS IMPACT ASSESSMENTSuperseded · PDF2 Jul 2025View
250330 V2 - TRANSPORT ASSESSMENTSuperseded · PDF2 Jul 2025View
DATED JUNE 2025 - ECONOMIC AND SOCIAL BENEFITS STATEMENTSuperseded · PDF2 Jul 2025View
109692-PEF-ZZ-XX-RP-GT-6001 P01 - MINING RISK ASSESSMENTSuperseded · PDF2 Jul 2025View
01137 SMII ES V4 - NON-TECHNICAL SUMMARYSuperseded · PDF2 Jul 2025View
01137 SMII ES V3 - ENVIRONMENTAL MANAGEMENT PLANSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 1.1 - REQUIRED INFORMATIONSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 - CONTENTS PAGESuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 9.4 - GCN TECHNICAL APPENDIXSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 9.3 - BAT SURVEYS TECHNICAL APPENDIXSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 9.2 - PROTECTED SPECIES TECHNICAL APPENDIXSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 9.1Superseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 7.2 - OPERATIONAL NOISE REPORTSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 7.1 - CONSTRUCTION NOISE REPORTSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 6.1 - TRANSPORT ASSESSMENTSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 2.3 - NON-STATUTORY CONSULTATION COMMENTSSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 2.2 - STATUTORY CONSULTATION COMMENTSSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 2.1 - EIA SCOPING REPORTSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 15.1 - CARBON CALCULATOR INPUT DATA & RESULTSSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 14.9 - PEAT CONDITION ASSESSMENTSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 14.8 - GROUNDWATER DEPENDENT TERRESTRIAL ECOSYSTEMSSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 14.7 - PUBLIC WATER SUPPLY ASSESSMENTSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 14.6 - PRIVATE WATER SUPPLY ASSESSMENTSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 14.5 - WATERCOURSE CROSSING INVENTORYSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 14.4 - PEAT LANDSLIDE HAZARD RISK ASSESSMENTSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 14.3 - OUTLINE PEAT MANAGEMENT PLANSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 14.2 - PEAT SURVEY REPORTSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 14.1 - GOOD PRACTICE METHODSSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 13.1 - ARCHAEOLOGICAL DESK BASED ASSESSMENTSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 12.2-12.6 - NEARBY DESIGNATED HERITAGE ASSETS STUDYSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 12.1 - HERITAGE ASSESSMENTSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 11.5 - LANDSCAPE SENSITIVITYSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 11.4 - VIEWPOINT ANALYSISSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 11.3 - LANDSCAPE CHARACTER BASELINESuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 11.2 - VISUALS METHODOLOGYSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 11.1 - LVIA METHODOLOGYSuperseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 10.3 - ORNITHOLOGY REPORT YEAR 3Superseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 10.2 - ORNITHOLOGY REPORT YEAR 2Superseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 10.1 - ORNITHOLOGY REPORT YEAR 1Superseded · PDF2 Jul 2025View
01137 SMII ES V2 APPENDIX 1.2 - SCHEDULE OF COMPETENCESuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 9.8 - PEATLAND RESTORATION PROPOSALSSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 9.7 - POST DEVELOPMENT HABITATSSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 9.6 - EDNA RESULTSSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 9.5 - BAT STATIC LOCATIONSSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 9.3 - NVC BASELINE FIGURESuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 9.2 - UKHAB BASELINE FIGURESuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 9.1B - DESIGNATED SITES WITHIN 10KMSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 9.1A - DESIGNATED SITES WITHIN 10KMSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 8.1 - SHADOW FLICKER ASSESSMENT LOCATIONSSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 7.1 - CONSTRUCTION NOISE ASSESSMENTSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 4.23 - INFRASTRUCTURE LAYOUT - INDICATIVE DECOMMISSIONINSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 4.22 - PROPOSED INDICATIVE FENCING LAYOUT WITH ACCESS POSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 4.21 - TYPICAL WATER CROSSING METHODSSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 4.20 - TYPICAL TRACK DETAILSSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 4.19 - TYPICAL COMPOUND FENCINGSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 4.18 - TYPICAL CONSTRUCTION COMPOUNDSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 4.17 - INDICATIVE ONSITE SUBSTATION ELEVATIONSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 4.16 - INDICATIVE ONSITE SUBSTATION LAYOUTSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 4.15 - TYPICAL CABLE TRENCH DETAILSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 4.14 - TYPICAL CRANE HARDSTANDINGSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 4.13 - TYPICAL TURBINE FOUNDATION DETAILSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 4.12 - TYPICAL TURBINE ELEVATIONSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 4.11 - AVIATION LIGHTING PLANSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 4.10 - LAYDOWN AREA AND JUNCTION SWEPT PATH ASSESSMENTSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 4.09 - ACCESS DESIGN SWEPT PATH ASSESSMENTSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 4.08 - LAYDOWN AREA AND JUNCTION GENERAL ARRANGEMENTSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 4.07 - ACCESS DESIGN GENERAL ARRANGEMENTSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 4.06 - CROSSING CONSTRUCTION DETAILSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 4.05 - CROSSING PLAN & LONGITUDINAL SECTIONSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 4.04 - PLAN VIEWSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 4.03 - INFRASTRUCTURE LAYOUT - OPERATIONAL STAGESuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 4.02 - INFRASTRUCTURE LAYOUT - CONSTRUCTION STAGESuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 4.01 - INFRASTRUCTURE LAYOUTSuperseded · PDF2 Jul 2025View
VISUALISATIONS (NS)Superseded · PDF2 Jul 2025View
01137 SMII ES V1 - CONTENTS PAGESuperseded · PDF2 Jul 2025View
01137 SMII ES V1 - CHAPTER 9 ECOLOGYSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 - CHAPTER 8 SHADOW FLICKERSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 - CHAPTER 7 NOISE AND VIBRATIONSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 - CHAPTER 6 TRANSPORT AND ACCESSSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 - CHAPTER 5 CONSIDERATION OF ALTERNATIVESSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 - CHAPTER 4 DEVELOPMENT SPECIFICATIONSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 - CHAPTER 3 ASSESSMENT BOUNDARY CONTEXT 010625Superseded · PDF2 Jul 2025View
01137 SMII ES V1 - CHAPTER 2 APPROACH TO EIASuperseded · PDF2 Jul 2025View
01137 SMII ES V1 - CHAPTER 17 SUMMARYSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 - CHAPTER 16 ASSESSMENT OF CUMULATIVE EFFECTSSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 - CHAPTER 15 CLIMATE CHANGESuperseded · PDF2 Jul 2025View
01137 SMII ES V1 - CHAPTER 14 HYDROLOGY, HYDROGEOLOGY AND PEASuperseded · PDF2 Jul 2025View
01137 SMII ES V1 - CHAPTER 13 ARCHAEOLOGYSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 - CHAPTER 12 BUILT HERITAGESuperseded · PDF2 Jul 2025View
01137 SMII ES V1 - CHAPTER 11 LANDSCAPE AND VISUALSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 - CHAPTER 10 ORNITHOLOGYSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 - CHAPTER 1 INTRODUCTIONSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 10.1A - DESIGNATED SITES WITHIN 10KM - ORNITHOLOGYSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 10.1B - NON-STATUTORY DESIGNATIONS WITHIN 2KM - ORNITHOLSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 10.2 - BREEDING BIRD SURVEY RESULTS 2022Superseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE - BREEDING BIRD SURVEY RESULTS 2023Superseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 10.4 - BREEDING BIRD SURVEY RESULTSSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 10.5 OR 013B - BREEDING BIRD SURVEY RESULTS 2023 - SKYLASuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 10.6 OR 037B - BREEDING BIRD SURVEY RESULTS 2024 - SKYLASuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 10.14 OR 004C - VANTAGE POINT LOCATIONS AND VIEWSHEDSSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 10.13 OR 048A - VANTAGE POINT SURVEY RESULTS - WATERFOWLSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 10.12 OR 056A - VANTAGE POINT SURVEY RESULTS - KESTREL (Superseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 10.11 OR 047A - VANTAGE POINT SURVEY RESULTS - RAPTORS (Superseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 10.10 OR 046B - VANTAGE POINT SURVEY RESULTS - WADERS (ASuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 16.2 - CUMULATIVE SHADOW FLICKER ASSESSMENSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 16.1 - CUMULATIVE PROJECT PLANSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 14.1 - HYDROLOGICAL SETTINGSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 14.10 - PEAT RESTORATION AREASSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 14.11 - PEATLAND CONDITION ASSESSMENTSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 14.2 - SOILS AND PEAT MAPPINGSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 14.3 - SUPERFICIAL GEOLOGYSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 14.4 - BEDROCK GEOLOGYSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 14.5 - HYDROLOGICAL FEATURESSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 14.5A - HYDROLOGICAL FEATURESSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 14.5B - HYDROLOGICAL FEATURESSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 14.5C - HYDROLOGICAL FEATURESSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 14.5D - HYDROLOGICAL FEATURESSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 14.6 - HYDROLOGICAL REGIMESuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 14.7 - GROUNDWATER DEPENDENT TERRESTRIAL ECOSYSTEMSSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 14.8 - PEAT DEPTH OF PENETRATION AND PROBE LOCATIONSSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 14.9 - ESTIMATED PEAT DEPTHSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 14.10 - PEAT RESTORATION AREASSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 14.11 - PEATLAND CONDITION ASSESSMENTSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 11.1 - LANDSCAPE CONTEXT - 45KMSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 11.10 - DESIGN ANALYSIS - 5KMSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 11.11 - AVIATION LIGHTING ZTV ? BARE EARTH - 10KMSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 11.12 - BARE EARTH ZTV WITH LANDSCAPE CHARACTER 10KMSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 11.13 - BARE EARTH ZTV WITH VISUAL RECEPTORSSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 11.14 - BARE EARTH ZTV WITH DESIGNATIONS - 10KMSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 11.15 - CUMULATIVE ZTV OPERATIONAL WITH SCOUT MOOR IISuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 11.2 - EXISTING LIGHT ENVIRONMENT -20KMSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 11.3 - CUMULATIVE SEARCH AREA 45KMSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 11.4 - CUMULATIVE LOCATION PLAN 20KMSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 11.5 - BARE EARTH BLADE TIP ZTV 45KMSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 11.6 - BARE EARTH HUB HEIGHT ZTV 45KMSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 11.7 - ZTV TO BLADE TIP WITH SCREENING 45KMSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 11.8 - ZTV TO HUB HEIGHT WITH SCREENING 45KMSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 11.9A - LOCAL LANDSCAPE CHARACTER - 20KMSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 11.9B - LOCAL LANDSCAPE CHARACTER KEY - 20KMSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 12.1 - 1851 ORDNANCE SURVEY 6 INCHSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 12.10 - HERITAGE ASSET PLAN WITH ASSETS ASSESSED WITHINSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 12.11 - HERITAGE ASSET PLAN WITH ASSETS ASSESSED WITHINSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 12.2 - 1894-95 ORDNANCE SURVEY 6 INCHSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 12.3 - 1930-31 ORDNANCE SURVEY 6 INCHSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 12.4 - HERITAGE ASSET PLAN (15KM STUDY AREA)Superseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 12.5 - HERITAGE ASSET PLAN WITH BARE EARTH BLADE TIP ZTVSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 12.6 - HERITAGE ASSET PLAN WITH BARE EARTH HUB HEIGHT ZTSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 12.7 - HERITAGE ASSET PLAN WITH BLADE TIP WITH SCREENINGSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 12.8 - HERITAGE ASSET PLAN WITH HUB HEIGHT WITH SCREENINSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 12.9 - HERITAGE ASSET PLAN WITH ASSETS ASSESSED WITHIN TSuperseded · PDF2 Jul 2025View
DATED JULY 2025 SCOUT MOOR II - STATEMENT OF COMMUNITY INVOLVEMENTSuperseded · PDF2 Jul 2025View
SCOUT MOOR II - BIODIVERSITY NET GAIN ASSESSMENT (APPENDIX A - CONDITION ASSESSMSuperseded2 Jul 2025View
SCOUT MOOR II - BIODIVERSITY NET GAIN ASSESSMENT (APPENDIX B - STATUTORY BNG METSuperseded2 Jul 2025View
01137 SMII ES V1 FIGURE 7.3 CUMULATIVE WIND TURBINESSuperseded · PDF2 Jul 2025View
01137 SMII ES V1 FIGURE 7.2 OPERATIONAL NOISE ASSESSMENT AND NOISE MONITORING LOSuperseded · PDF2 Jul 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.