Council planning record

Construction and operation of 12 wind turbines with a maximum height to the tip of the blade of 180 metres (above ground level), together with associated ancillary infrastructure comprising crane pads and hardstandings; new access tracks; improvement and widening works to Scout Road; onsite substation; underground electrical infrastructure and cabling; fencing and boundary treatments; external lighting; drainage infrastructure; habitat and moorland restoration works; public right of way works; landscaping; temporary construction compound and staging area; underground electrical grid connection to the Rossendale Bulk Supply Point; and associated engineering works; alongside the retention of and improvements to existing access tracks associated with the existing Scout Moor Wind Farm (Further Environmental Information).

Scout Moor Wind Farm Rochdale

Under ConsultationReference: 25/00680/FULRochdale Metropolitan Borough Council

Last published check: 10 Oct 2026, 16:46. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Application location

Scout Moor Wind Farm Rochdale

This record has no verified map location.

Application summary

Status
Under Consultation
Application type
Full planning permission
Received
Not published
Validated
7 Aug 2025
Determination deadline
27 Nov 2025
Local authority
Rochdale Metropolitan Borough Council

Application overview

Construction and operation of 12 wind turbines with a maximum height to the tip of the blade of 180 metres (above ground level), together with associated ancillary infrastructure comprising crane pads and hardstandings; new access tracks; improvement and widening works to Scout Road; onsite substation; underground electrical infrastructure and cabling; fencing and boundary treatments; external lighting; drainage infrastructure; habitat and moorland restoration works; public right of way works; landscaping; temporary construction compound and staging area; underground electrical grid connection to the Rossendale Bulk Supply Point; and associated engineering works; alongside the retention of and improvements to existing access tracks associated with the existing Scout Moor Wind Farm (Further Environmental Information).

Proposal details

Reference
25/00680/FUL
Ward
Norden
Parish
Rochdale North Township;Rossendale Council
Agent
Thomas Lord (Turley Associates)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 263 of 263

DocumentPublishedAction
Telecommunications Impact AssessmentReport · PDF8 Jul 2026View
ES V1 Figure 10.5 Breeding Bird Survey Results 2023 - SkylarkReport · PDF8 Jul 2026View
FEI ES V1 Figure 11.1 Landscape ContextReport · PDF8 Jul 2026View
TYPICAL CRANE HARDSTANDING – SK08 REV P4Plan · PDF8 Jul 2026View
ES V2 Appendix 9.3 Bat Activity ReportReport · PDF8 Jul 2026View
ES V1 Figure 12.4 Heritage Asset PlanReport · PDF8 Jul 2026View
Scout Moor II - Document and Drawing ScheduleReport27 Aug 2026View
FEI ES V1 Figure 11.13 Bare Earth ZTV with Visual ReceptorsPlan · PDF8 Jul 2026View
FEI ES V1 Figure 11.9a Landscape CharacterPlan · PDF8 Jul 2026View
ES V1 Figure 11.4 Cumulative Location PlanReport · PDF8 Jul 2026View
Planning Applications - - Published - 2500680FUL - EIA CONSULTATION - SCOUT MOOR-6716219.pdfPlanning Application · PDF15 Apr 2026View
ES V1 Figure 10.11 Vantage Point Survey Results - Raptors (April 2022 to August 2024)Report · PDF8 Jul 2026View
ES V1 Figure 12.10 Heritage Asset Plan with Assets assessed within the EIA with Blade TipReport · PDF8 Jul 2026View
Supporting Report - 28082025 - CONSULTATION RESPONSE FROM THE CANAL AND RIVER TRUST - 2500680FUL-6716824.PDFPL/01/01 Supporting Report · PDF5 Dec 2025View
ES V2 Appendix 1.1 Required InformationReport · PDF8 Jul 2026View
RVAA Figure 3BReport · PDF8 Jul 2026View
Supporting Report - 15072025 - BNG BLANK PAGES - 2500680FUL-6697942.PDFPL/01/01 Supporting Report · PDF5 Dec 2025View
ES V2 Appendix 11.6 RVAA Visuals (WEB)Report · PDF8 Jul 2026View
FEI ES V1 Figure 7.1 Construction Noise AssessmentReport · PDF12 Aug 2026View
FEI Site Boundary Comparison PlanPlan · PDF8 Jul 2026View
ES V2 Appendix 13.1 ADBA Part 1 of 4Report · PDF8 Jul 2026View
ES V2 Appendix 11.4 Viewpoint AnalysisReport · PDF8 Jul 2026View
ES V2 Appendix 11.6 RVAA Figure 1 (A3)Report · PDF8 Jul 2026View
FEI ES V1 Figure 11.8 ZTV to Hub Height with ScreeningPlan · PDF8 Jul 2026View
ES V2 Appendix 2.2 Statutory Consultation CommentsReport · PDF8 Jul 2026View
SCOUT MOOR QUARRIES ACCESS DESIGN SWEPT PATH ASSESSMENT – SK20 REV P5Plan · PDF8 Jul 2026View
RVAA Annex 3 Detailed Property Assessment SheetsReport · PDF8 Jul 2026View
FEI - Planning Design and Access StatementReport · PDF3 Sept 2026View
ES V2 Appendix 14.3 Outline Peat Management PlanReport · PDF8 Jul 2026View
ES V1 Chapter 14 Hydrology, Hydrogeology and PeatReport · PDF8 Jul 2026View
FEI ES V1 Chapter 12 Built HeritageReport · PDF27 Aug 2026View
ES V2 Appendix 2.3 Non-Statutory Consultation CommentsReport · PDF8 Jul 2026View
Preliminary Risk AssessmentReport · PDF8 Jul 2026View
ES V1 Figure 4.20 Typical Compound Fencing (SK13 REV 4)Report · PDF8 Jul 2026View
Supporting Report - 18072025 - VISULISATIONS NS WEB - 2500680FUL-6700401.PDFPL/01/01 Supporting Report · PDF5 Dec 2025View
ES V1 Figure 11.6 ZTV to Hub Height - Bare EarthReport · PDF8 Jul 2026View
ES V1 Figure 4.9 SMQ Access Design Swept Path Assessment (SK20 REV 5)Report · PDF8 Jul 2026View
Scout Moor II FEI - You Said We Heard We ActedReport · PDF12 Aug 2026View
FEI ES V2 Appendix 2.4 Post Submission Statutory Consultation CommentsReport · PDF12 Aug 2026View
Supporting Report - 18072025 - VISULISATIONS CH WEB - 2500680FUL-6700400.PDFPL/01/01 Supporting Report · PDF5 Dec 2025View
ES V2 Appendix 11.6 RVAA Figure 3B (A3)Report · PDF8 Jul 2026View
SCOUT MOOR QUARRIES ACCESS DESIGN GENERAL ARRANGEMENT – SK19 REV P5Plan · PDF8 Jul 2026View
RVAA-Visuals_WEBReport · PDF8 Jul 2026View
ES V2 Appendix 15.1 Carbon Calculator Input Data & ResultsReport · PDF8 Jul 2026View
ES V2 Appendix 10.1 Year 1 Ornithology ReportReport · PDF8 Jul 2026View
INDICATIVE ONSITE SUBSTATION LAYOUT - SK10 Rev P5Plan · PDF8 Jul 2026View
Supporting Report - 13112025 - RSPB CONSULTATION RESPONSE - 2500680FUL-6750097.pdfPL/01/01 Supporting Report · PDF27 Nov 2025View
Moorland Restoration and Management Plan.Report · PDF8 Jul 2026View
FEI ES V4 Non-Technical SummaryReport · PDF12 Aug 2026View
Supporting Report - 16072025 - ES V1 FIGURE 421 TYPICAL CROSSING METHODS - 2500680FUL-6698535.PDFPL/01/01 Supporting Report · PDF5 Dec 2025View
ES V1 Figure 4.19 Typical Construction Compound (SK12 REV 4)Report · PDF8 Jul 2026View
FEI ES V1 Figure 16.2 Cumulative Shadow Flicker AssessmentReport · PDF12 Aug 2026View
Economic and Social Benefits StatementReport · PDF8 Jul 2026View
ES V1 Figure 10.14 Vantage Point Locations and ViewshedsReport · PDF8 Jul 2026View
Supporting Report - 16072025 - ES V1 CHAPTER 1 INTRODUCTION - 2500680FUL-6698509.PDFPL/01/01 Supporting Report · PDF5 Dec 2025View
ROOLEY MOOR ROAD CROSSING CONSTRUCTION DETAIL – SK18 REV P4Plan · PDF8 Jul 2026View
INFRASTRUCTURE LAYOUT CONSTRUCTION PHASE – SK03 REV P4Plan · PDF8 Jul 2026View
ES V2 Appendix 14.1 Good Practice MethodsReport · PDF8 Jul 2026View
FEI ES V2 Heritage Assessment Appendices 8-12Report · PDF12 Aug 2026View
FEI ES V1 Figure 11.14 Bare Earth ZTV with DesignationsPlan · PDF8 Jul 2026View
Supporting Report - 15092025 - THE COAL AUTHORITY RESPONSE - 2500680FUL-6724466.pdfConsultee Response · PDF5 Dec 2025View
ES V2 Appendix 14.5 Watercourse Crossing InventoryReport · PDF8 Jul 2026View
ES V1 Figure 4.8 SMQ Laydown Area and Junction General Arrangement (SK21 REV 4)Report · PDF8 Jul 2026View
Health Impact AssessmentReport · PDF8 Jul 2026View
Supporting Report - 04112025 - CONSULTATION RESPONSE FROM LANCASHIRE WILDLIFE TRUST - 2500680FUL-6746350.pdfPL/01/01 Supporting Report · PDF27 Nov 2025View
RVAA Figure 3AReport · PDF8 Jul 2026View
ES V1 Figure 14.7 Groundwater Dependent Terrestrial Ecosystems (GWDTE)Report · PDF8 Jul 2026View
ES V1 Figure 14.10 Peat Restoration Areas.Report · PDF8 Jul 2026View
ES V2 Appendix 14.7 Public Water Supply AssessmentReport · PDF8 Jul 2026View
ES V1 Figure 9.6 eDNA ResultsReport · PDF8 Jul 2026View
ES V1 Figure 12.3 1930-31 Ordnance Survey 6 InchReport · PDF8 Jul 2026View
Bury CouncilConsultee Response · PDF23 Jan 2026View
ES V1 Figure 14.11 Peatland Condition Assessment.Report · PDF8 Jul 2026View
ES V1 Figure 12.8 Heritage Asset Plan with Hub Height with Screening ZTVReport · PDF8 Jul 2026View
ROOLEY MOOR ROAD CROSSING PLAN VIEW – SK17 REV P5Plan · PDF8 Jul 2026View
ES V1 Figure 1.1 Assessment BoundaryReport · PDF8 Jul 2026View
Natural EnglandConsultee Response · PDF26 Jan 2026View
FEI ES V1 Figure 11.15 Cumulative ZTV Operational with Scout Moor IIPlan · PDF8 Jul 2026View
ES V1 Figure 4.16 Indicative Onsite Substation Layout (P5)Report · PDF8 Jul 2026View
ES V1 Figure 4.24 Infrastructure Layout - Indicative Decommissioning Plan (SK05 REV P4)Report · PDF8 Jul 2026View
FEI ES V1 Chapter 7 Noise and VibrationReport · PDF12 Aug 2026View
ES V2 Contents PageReport · PDF8 Jul 2026View
Outline Habitat Management and Monitoring PlanReport · PDF8 Jul 2026View
ES V2 Appendix 11.6 RVAA Figure 3A (A3)Report · PDF8 Jul 2026View
Supporting Report - 02102025 - CONSULTEE - HISTORIC ENGLAND - 2500680FUL-6733686.pdfPL/01/01 Supporting Report · PDF27 Nov 2025View
ES V1 Figure 10.3 Breeding Bird Survey Results 2023Report · PDF8 Jul 2026View
Supporting Report - 29072025 - STATEMENT OF COMMUNITY INVOLVEMENT - 2500680FUL-6705140.PDFPL/01/01 Supporting Report · PDF5 Dec 2025View
ES V1 Figure 12.2 1894-5 Ordnance Survey 6 InchReport · PDF8 Jul 2026View
Mineral Resource AssessmentReport · PDF8 Jul 2026View
RVAA-Visuals_PRNT versionReport · PDF8 Jul 2026View
ES V1 Figure 4.4 Rooley Moor Road Crossing Plan View (SK17 REV 5)Report · PDF8 Jul 2026View
ES V1 Figure 12.6 Heritage Asset Plan with Bare Earth Hub Height ZTVReport · PDF8 Jul 2026View
ES V1 Chapter 9 Ecology 02.06.26 (CLEAN)Report · PDF8 Jul 2026View
National Air Traffic Services- consultee responseConsultee Response · PDF21 Sept 2026View
ES V1 Figure 10.2 Breeding Bird Survey Results 2022Report · PDF8 Jul 2026View
ES V1 Figure 4.21 Typical Track Details (SK14 REV 4)Report · PDF8 Jul 2026View
FEI ES V2 Appendix 7.1 Construction Noise ReportReport · PDF12 Aug 2026View
FEI ES V1 Figure 11.9b Local Landscape CharacterPlan · PDF8 Jul 2026View
ES V1 Figure 4.17 Indicative Onsite Substation Elevation (P5)Report · PDF8 Jul 2026View
Supporting Report - 22092025 - CONSULTATION RESPONSE FROM ENV AGENCY - 2500680FUL-6727531.pdfPL/01/01 Supporting Report · PDF5 Dec 2025View
ES V2 Appendix 12.7 Wireline Visualisations and Reference PhotographyReport · PDF8 Jul 2026View
FEI ES V1 Chapter 17 SummaryReport · PDF12 Aug 2026View
FEI ES V1 Figure 7.3 Cumulative Wind TurbinesReport · PDF12 Aug 2026View
TYPICAL WATER CROSSING METHODS – SK15 REV P4Plan · PDF8 Jul 2026View
Statutory_Biodiversity_Metric_Calculation_Tool Rev5Report8 Jul 2026View
Supporting Report - 18072025 - APPENDIX 1 APPLICATION DOCUMENTATION - 2500680FUL-6700647.DOCXPL/01/01 Supporting Report5 Dec 2025View
FEI Carbon Calculator FINAL 2026.05.21 excelReport5 Oct 2026View
TYPICAL TURBINE FOUNDATION DETAIL – SK07 REV P4Plan · PDF8 Jul 2026View
ES V1 Figure 14.4 Bedrock GeologyReport · PDF8 Jul 2026View
TYPICAL TURBINE ELEVATION – SK06 REV P4Plan · PDF8 Jul 2026View
ES V1 Chapter 4 Development SpecificationReport · PDF8 Jul 2026View
ES V1 Figure 10.4 Breeding Bird Survey Results 2024Report · PDF8 Jul 2026View
Outdoor Access MEPReport · PDF8 Jul 2026View
FEI ES V2 Appendix 7.2 Operational Noise ReportReport · PDF12 Aug 2026View
Indicative Fencing Layout (Version 10)Plan · PDF8 Jul 2026View
ES V1 Figure 4.3 Infrastructure Layout - Operational Phase (SK04 REV P5)Report · PDF8 Jul 2026View
Transport Assessment (inc AIL Survey)Report · PDF8 Jul 2026View
ES V2 Appendix 14.9 Peat Condition Assessment.Report · PDF8 Jul 2026View
FEI ES V2 Appendix 12.1 Heritage AssessmentReport · PDF27 Aug 2026View
ES V1 Contents PageReport · PDF8 Jul 2026View
ES V1 Figure 11.7 ZTV to Blade Tip with ScreeningReport · PDF8 Jul 2026View
ES V1 Chapter 10 OrnithologyReport · PDF8 Jul 2026View
Supporting Report - 13102025 - DRAINAGE CONSULTEE RESPONSE - 2500680FUL-6736110.docxPL/01/01 Supporting Report27 Nov 2025View
Supporting Report - 10102025 - CONSULTATION RESPONSE FROM NATIONAL TRUST - 2500680FUL-6735345.pdfPL/01/01 Supporting Report · PDF27 Nov 2025View
ES V1 Figure 14.5b Hydrological Features.Report · PDF8 Jul 2026View
FEI ES V1 Figure 11.16 Cumulative ZTV Calderdale with Scout Moor IIPlan · PDF8 Jul 2026View
ES V1 Figure 14.8 Peat Depth of Penetration and Probe Locations.Report · PDF8 Jul 2026View
ES V1 Chapter 3 Assessment Boundary ContextReport · PDF8 Jul 2026View
Public Rights of Way Officer CommentsConsultee Response12 May 2026View
ES V2 Appendix 1.2 Schedule of CompetenceReport · PDF8 Jul 2026View
Met Office consultation responseConsultee Response · PDF22 Dec 2025View
ES V1 Figure 4.1 Infrastructure Layout (SK02 REV P4)Report · PDF8 Jul 2026View
Supporting Report - 31072025 - OWNERSHIP SCHEDULE - REDACTED - 2500680FUL-6706816.pdfPL/01/01 Supporting Report · PDF5 Dec 2025View
ES V1 Chapter 13 ArchaeologyReport · PDF8 Jul 2026View
ROOLEY MOOR ROAD CROSSING PLAN LONGITUDINAL SECTION – SK16 REV P5Plan · PDF8 Jul 2026View
ES V1 Figure 10.1b Non-statutory Designations within 2km - OrnithologyReport · PDF8 Jul 2026View
ES V1 Figure 4.23 Proposed Indicative Fencing Layout/Access Point Locations V10Report · PDF8 Jul 2026View
FEI ES V1 Figure 16.1 Cumulative Project Plan (1)Report · PDF12 Aug 2026View
ES V1 Figure 9.2 UKHab Baseline Figure - OverviewReport · PDF8 Jul 2026View
Sustainability Energy and Climate Change Statement.Report · PDF8 Jul 2026View
Mining Risk AssessmentReport · PDF8 Jul 2026View
ES V1 Figure 14.5 Hydrological FeaturesReport · PDF8 Jul 2026View
Scout Moor II FEI - Applicant Response to Consultee Comments.Report · PDF12 Aug 2026View
ES V2 Appendix 11.6 RVAA Figure 2 (A3)Report · PDF8 Jul 2026View
ES V2 Appendix 10.2 Year 2 Ornithology ReportReport · PDF8 Jul 2026View
Supporting Report - 16072025 - ES V1 FIGURE 404 ROOLEY MOOR RD CROSSING -PLAN VIEW - 2500680FUL-6698520.PDFPL/01/01 Supporting Report · PDF5 Dec 2025View
Supporting Report - 26082025 - CONSULTATION RESPONSE FROM NATS SAFEGUARDING - 2500680FUL-6716332.pdfPL/01/01 Supporting Report · PDF5 Dec 2025View
ES V1 Figure 4.6 Rooley Moor Road Crossing Construction Detail (SK18 REV 4)Report · PDF8 Jul 2026View
ES V1 Figure 9.5 Bat Static LocationsReport · PDF8 Jul 2026View
ES V1 Figure 12.7 Heritage Asset Plan with Blade Tip with Screening ZTVReport · PDF8 Jul 2026View
FEI ES V2 Heritage Assessment Appendices 2-7Report · PDF12 Aug 2026View
ES V1 Figure 4.7 SMQ Access Design General Arrangement (SK19 REV 5)Report · PDF8 Jul 2026View
Supporting Report - 16072025 - ES V1 FIGURE 417 TYPICAL SUBSTATION ELEVATION - 2500680FUL-6698537.PDFPL/01/01 Supporting Report · PDF5 Dec 2025View
ES V1 Chapter 6 Transport and AccessReport · PDF8 Jul 2026View
ES V1 Figure 10.10 Vantage Point Survey Results - Waders (April 2022 to August 2024)Report · PDF8 Jul 2026View
Biodiversity Net Gain AssessmentReport · PDF8 Jul 2026View
Flood Risk AssessmentReport · PDF8 Jul 2026View
ES V1 Figure 12.11 Heritage Asset Plan-Assets assessed within the EIA with Hub HeightReport · PDF8 Jul 2026View
ES V1 Figure 14.5a Hydrological FeaturesReport · PDF8 Jul 2026View
Residential Visual Amenity AssessmentReport · PDF8 Jul 2026View
Supporting Report - 13102025 - CONSULTATION RESPONSE FROM LLFA OFFICER - 2500680FUL-6736672.PDFPL/01/01 Supporting Report · PDF27 Nov 2025View
INDICATIVE ONSITE SUBSTATION ELEVATIONS - SK11 Rev P5Plan · PDF8 Jul 2026View
ES V2 Appendix 11.7 LVIA Illustrative WirelinesReport · PDF8 Jul 2026View
FEI ES V1 Chapter 11 Landscape and VisualReport · PDF8 Jul 2026View
FEI ES V1 Figure 11.10 Design AnalysisPlan · PDF8 Jul 2026View
ES V1 Figure 9.1b Non-statutory DesignationsReport · PDF8 Jul 2026View
ES V1 Figure 4.10 SMQ Laydown Area and Junction Swept Path Assessment (SK22 REV 4)Report · PDF8 Jul 2026View
ES V2 Appendix 6.1 Transport Assessment.Report · PDF8 Jul 2026View
Supporting Report - 08092025 - CONSULTATION RESPONSE FROM MET OFFICE - 2500680FUL-6722507.pdfPL/01/01 Supporting Report · PDF5 Dec 2025View
Supporting Report - 16072025 - ES V1 CONTENTS PAGE - 2500680FUL-6698507.PDFPL/01/01 Supporting Report · PDF5 Dec 2025View
Supporting Report - 28072025 - MINING RISK ASSESSMENT - PART 16 - 2500680FUL-6704767.PDFPL/01/01 Supporting Report · PDF5 Dec 2025View
Supporting Report - 25092025 - MOD SAFEGUARDING CONSULTATION RESPONSE - 2500680FUL-6729493.pdfPL/01/01 Supporting Report · PDF5 Dec 2025View
TYPICAL CONSTRUCTION COMPOUND – SK12 REV P4Plan · PDF8 Jul 2026View
Supporting Report - 24092025 - CONSULTATION RESPONSE FROM GMAAS - 2500680FUL-6729428.pdfPL/01/01 Supporting Report · PDF5 Dec 2025View
RVAA Figure 1Report · PDF8 Jul 2026View
FEI ES V3 Environmental Management PlanReport · PDF12 Aug 2026View
Supporting Report - 28072025 - MINING RISK ASSESSMENT - PART 5 - 2500680FUL-6704756.PDFPL/01/01 Supporting Report · PDF5 Dec 2025View
Supporting Report - 29072025 - STATEMENT OF COMMUNITY INVOLVEMENT - 2500680FUL-6705116.PDFPL/01/01 Supporting Report · PDF5 Dec 2025View
ES V1 Chapter 8 Shadow Flicker 29.05.26 (CLEAN)Report · PDF8 Jul 2026View
TYPICAL CRANE HARDSTANDING – SK08 REV P4Plan · PDF8 Jul 2026View
Scout Moor Quarries Laydown Area and Junction GA - SK21 REV P4Plan · PDF8 Jul 2026View
Outline Decommissioning Restoration and Aftercare StrategyReport · PDF8 Jul 2026View
FEI ES V1 Figure 7.2 Operational Noise Assessment and Noise Monitoring LocationsReport · PDF12 Aug 2026View
Supporting Report - 13112025 - HYNDBURN COUNCIL CONSULTEE RESPONSE - 2500680FUL-6750349.pdfPL/01/01 Supporting Report · PDF27 Nov 2025View
TYPICAL TRACK DETAILS – SK14 REV P4Plan · PDF8 Jul 2026View
ES V2 Appendix 11.6 RVAA Annex 3 Detailed Property Assessment SheetsReport · PDF8 Jul 2026View
ES V1 Chapter 15 Climate ChangeReport · PDF8 Jul 2026View
ES V2 Appendix 13.1 ADBA Part 3 of 4Report · PDF8 Jul 2026View
ES V1 Figure 10.13 Vantage Point Survey Results - Waterfowl (April 2022 to August 2024)Report · PDF8 Jul 2026View
ES V1 Figure 4.12 Typical Turbine Elevation (SK06 REV 4)Report · PDF8 Jul 2026View
ES V1 Figure 11.5 ZTP to Blade Tip - Bare EarthReport · PDF8 Jul 2026View
ES V1 Figure 9.1a Designated Sites within 10kmReport · PDF8 Jul 2026View
ES V1 Figure 11.3 Cumulative Search AreaReport · PDF8 Jul 2026View
Supporting Report - 15072025 - STATEMENT OF COMMUNITY INVOLVEMENT - 2500680FUL-6698333.PDFPL/01/01 Supporting Report · PDF5 Dec 2025View
Natural EnglandConsultee Response · PDF3 Feb 2026View
ES V1 Figure 4.15 Typical Cable Trench Details (33kV & 132kV) (SK09 REV 5)Report · PDF8 Jul 2026View
ES V2 Appendix 14.2 Peat Survey ReportReport · PDF8 Jul 2026View
TYPICAL COMPOUND FENCING – SK13 REV P4Plan · PDF8 Jul 2026View
ES V1 Figure 14.5c Hydrological FeaturesReport · PDF8 Jul 2026View
ES V1 Figure 9.3 NVC Baseline Figure - OverviewReport · PDF8 Jul 2026View
ES V2 Appendix 14.8 Groundwater Dependent Terrestrial Ecosystems AssessmentReport · PDF8 Jul 2026View
ES V2 Appendix 2.1 EIA Scoping ReportReport · PDF8 Jul 2026View
Cable Route Options - Version 4Plan · PDF8 Jul 2026View
Air Quality AssessmentReport · PDF8 Jul 2026View
Aviation Lighting Plan- Version 8Plan · PDF8 Jul 2026View
ES V1 Figure 4.18 Cable Route Options (Version 4)Report · PDF8 Jul 2026View
ES V2 Appendix 14.4 Peat Landslide Hazard & Risk AssessmentReport · PDF8 Jul 2026View
Supporting Report - 28072025 - MINING RISK ASSESSMENT - PART 3 - 2500680FUL-6704754.PDFPL/01/01 Supporting Report · PDF5 Dec 2025View
ES V1 Figure 4.22 Typical Water Crossing Methods (SK15 REV 4)Report · PDF8 Jul 2026View
ES V1 Figure 12.1 1851 Ordnance Survey 6 InchReport · PDF8 Jul 2026View
ES V1 Figure 9.8 Peatland Restoration Proposals.Report · PDF8 Jul 2026View
Scout Moor Quarries Laydown Area - Junction Swept Path Assessment - SK22 Rev P4Plan · PDF8 Jul 2026View
ES V1 Chapter 1 IntroductionReport · PDF8 Jul 2026View
ES V1 Figure 4.2 Infrastructure Layout - Construction Phase (SK03 REV P4)Report · PDF8 Jul 2026View
INFRASTRUCTURE LAYOUT OPERATIONAL PHASE – SK04 REV P5Plan · PDF8 Jul 2026View
ES V2 Appendix 11.2 Visuals MethodologyReport · PDF8 Jul 2026View
FEI ES V1 Chapter 16 Assessment of Cumulative EffectsReport · PDF12 Aug 2026View
SITE LOCATION PLAN – SK01 REV P3Plan · PDF8 Jul 2026View
Supporting Report - 16072025 - ES V1 CHAPTER 16 ASSESSMENT OF CUMULATIVE EFFECTS - 2500680FUL-6698513.PDFPL/01/01 Supporting Report · PDF5 Dec 2025View
ES V2 Appendix 11.5 Landscape SensitivityReport · PDF8 Jul 2026View
FEI ES V1 Figure 11.11 Aviation Lighting ZTV - Bare EarthPlan · PDF8 Jul 2026View
ES V1 Figure 14.6 Hydrogeological RegimeReport · PDF8 Jul 2026View
Supporting Report - 18072025 - ES V1 FIGURE 97 POST DEVEOPMENT HABITATS - 2500680FUL-6698899.PDFPL/01/01 Supporting Report · PDF5 Dec 2025View
ES V1 Figure 14.5d Hydrological FeaturesReport · PDF8 Jul 2026View
ES V1 Figure 4.11 Aviation Lighting (Version 3)Report · PDF8 Jul 2026View
ES V2 Appendix 11.3 Landscape Character BaselineReport · PDF8 Jul 2026View
ES V2 Appendix 9.1 Desk Study and Habitats ResultsReport · PDF8 Jul 2026View
Supporting Report - 10102025 - CONSULTATION RESPONSE FROM UNITED UTILITIES - 2500680FUL-6735367.pdfPL/01/01 Supporting Report · PDF27 Nov 2025View
ES V2 Appendix 13.1 ADBA Part 2 of 4Report · PDF8 Jul 2026View
ES V1 Figure 8.1 Study Area and Shadow Flicker Assessment LocationsReport · PDF8 Jul 2026View
Drainage StrategyReport · PDF8 Jul 2026View
ES V2 Appendix 11.1 LVIA MethodologyReport · PDF8 Jul 2026View
ES V1 Figure 4.5 Rooley Moor Road Crossing Plan & Longitudinal Section (SK16 REV 5)Report · PDF8 Jul 2026View
ES V1 Figure 14.3 Superficial GeologyReport · PDF8 Jul 2026View
ES V1 Figure 14.2 Soils and Peat MappingReport · PDF8 Jul 2026View
ES V1 Figure 4.13 Typical Turbine Foundation Detail (SK07 REV 4)Report · PDF8 Jul 2026View
ES V2 Appendix 9.5 Grid Connection Ecology WalkoverReport · PDF8 Jul 2026View
ES V2 Appendix 14.6 Private Water Supply AssessmentReport · PDF8 Jul 2026View
ES V1 Figure 12.5 Heritage Asset Plan with Bare Earth Blade Tip ZTVReport · PDF8 Jul 2026View
ES V1 Figure 12.9 Heritage Asset Plan with Assets assessed within the EIAReport · PDF8 Jul 2026View
ES V2 Appendix 10.3 Year 3 Ornithology ReportReport · PDF8 Jul 2026View
ES V1 Figure 11.2 Existing Light EnvironmentReport · PDF8 Jul 2026View
RVAA Figure 2Report · PDF8 Jul 2026View
ES V1 Chapter 5 Consideration of AlternativesReport · PDF8 Jul 2026View
ES V2 Appendix 9.4 Great Crested Newt and AmphibiansReport · PDF8 Jul 2026View
CMS Legal Advice NoteReport · PDF28 Sept 2026View
ES V1 Figure 4.14 Typical Crane Hardstanding (SK08 REV 4)Report · PDF8 Jul 2026View
ES V1 Figure 14.1 Hydrological SettingReport · PDF8 Jul 2026View
ES V1 Figure 14.9 Estimated Peat DepthReport · PDF8 Jul 2026View
ES V1 Figure 10.12 Vantage Point Survey Results - Kestrel (April 2022 to August 2024)Report · PDF8 Jul 2026View
Supporting Report - 27082025 - CONSULTATION RESPONSE FROM HSE - 2500680FUL-6716829.PDFPL/01/01 Supporting Report · PDF5 Dec 2025View
Supporting Report - 16072025 - ES V1 FIGURE 416 TYPICAL SUBSTATION LAYOUT - 2500680FUL-6698536.PDFPL/01/01 Supporting Report · PDF5 Dec 2025View
ES V2 Appendix 13.1 ADBA Part 4 of 4Report · PDF8 Jul 2026View
ES V2 Appendix 12.2-12.6Report · PDF8 Jul 2026View
ES V1 Chapter 2 Approach to EIAReport · PDF8 Jul 2026View
INFRASTRUCTURE LAYOUT – SK02 REV P4Plan · PDF8 Jul 2026View
ES V1 Figure 10.6 Breeding Bird Survey Results 2024 - Skylark.Report · PDF8 Jul 2026View
ES V1 Figure 9.7 Post development habitats - OverviewReport · PDF8 Jul 2026View
INFRASTRUCTURE LAYOUT INDICATIVE DECOMMISSIONING PLAN – SK05 REV P4Plan · PDF8 Jul 2026View
Aviation and Met Radar AssessmentReport · PDF8 Jul 2026View
TYPICAL CABLE TRENCH DETAILS – SK09 REV P5Plan · PDF8 Jul 2026View
ES V1 Figure 10.1a Designated Sites within 10km - OrnithologyReport · PDF8 Jul 2026View
FEI ES V1 Figure 11.12 Bare Earth ZTV with Landscape CharacterPlan · PDF8 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Valid Date

    Published milestoneCouncil source
  2. Decision Date Due

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  3. Scheduled Decision Date

    Published milestoneCouncil source
  4. End of Consultation

    Scheduled

    Future date published by the council.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.