Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Scout Moor Wind Farm Rochdale
Last published check: 10 Oct 2026, 16:46. Check the council record for more recent changes.
We couldn’t update every section. Some information is from an earlier collection.
Scout Moor Wind Farm Rochdale
This record has no verified map location.
Construction and operation of 12 wind turbines with a maximum height to the tip of the blade of 180 metres (above ground level), together with associated ancillary infrastructure comprising crane pads and hardstandings; new access tracks; improvement and widening works to Scout Road; onsite substation; underground electrical infrastructure and cabling; fencing and boundary treatments; external lighting; drainage infrastructure; habitat and moorland restoration works; public right of way works; landscaping; temporary construction compound and staging area; underground electrical grid connection to the Rossendale Bulk Supply Point; and associated engineering works; alongside the retention of and improvements to existing access tracks associated with the existing Scout Moor Wind Farm (Further Environmental Information).
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Telecommunications Impact AssessmentReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 10.5 Breeding Bird Survey Results 2023 - SkylarkReport · PDF | 8 Jul 2026 | View |
| FEI ES V1 Figure 11.1 Landscape ContextReport · PDF | 8 Jul 2026 | View |
| TYPICAL CRANE HARDSTANDING – SK08 REV P4Plan · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 9.3 Bat Activity ReportReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 12.4 Heritage Asset PlanReport · PDF | 8 Jul 2026 | View |
| Scout Moor II - Document and Drawing ScheduleReport | 27 Aug 2026 | View |
| FEI ES V1 Figure 11.13 Bare Earth ZTV with Visual ReceptorsPlan · PDF | 8 Jul 2026 | View |
| FEI ES V1 Figure 11.9a Landscape CharacterPlan · PDF | 8 Jul 2026 | View |
| ES V1 Figure 11.4 Cumulative Location PlanReport · PDF | 8 Jul 2026 | View |
| Planning Applications - - Published - 2500680FUL - EIA CONSULTATION - SCOUT MOOR-6716219.pdfPlanning Application · PDF | 15 Apr 2026 | View |
| ES V1 Figure 10.11 Vantage Point Survey Results - Raptors (April 2022 to August 2024)Report · PDF | 8 Jul 2026 | View |
| ES V1 Figure 12.10 Heritage Asset Plan with Assets assessed within the EIA with Blade TipReport · PDF | 8 Jul 2026 | View |
| Supporting Report - 28082025 - CONSULTATION RESPONSE FROM THE CANAL AND RIVER TRUST - 2500680FUL-6716824.PDFPL/01/01 Supporting Report · PDF | 5 Dec 2025 | View |
| ES V2 Appendix 1.1 Required InformationReport · PDF | 8 Jul 2026 | View |
| RVAA Figure 3BReport · PDF | 8 Jul 2026 | View |
| Supporting Report - 15072025 - BNG BLANK PAGES - 2500680FUL-6697942.PDFPL/01/01 Supporting Report · PDF | 5 Dec 2025 | View |
| ES V2 Appendix 11.6 RVAA Visuals (WEB)Report · PDF | 8 Jul 2026 | View |
| FEI ES V1 Figure 7.1 Construction Noise AssessmentReport · PDF | 12 Aug 2026 | View |
| FEI Site Boundary Comparison PlanPlan · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 13.1 ADBA Part 1 of 4Report · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 11.4 Viewpoint AnalysisReport · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 11.6 RVAA Figure 1 (A3)Report · PDF | 8 Jul 2026 | View |
| FEI ES V1 Figure 11.8 ZTV to Hub Height with ScreeningPlan · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 2.2 Statutory Consultation CommentsReport · PDF | 8 Jul 2026 | View |
| SCOUT MOOR QUARRIES ACCESS DESIGN SWEPT PATH ASSESSMENT – SK20 REV P5Plan · PDF | 8 Jul 2026 | View |
| RVAA Annex 3 Detailed Property Assessment SheetsReport · PDF | 8 Jul 2026 | View |
| FEI - Planning Design and Access StatementReport · PDF | 3 Sept 2026 | View |
| ES V2 Appendix 14.3 Outline Peat Management PlanReport · PDF | 8 Jul 2026 | View |
| ES V1 Chapter 14 Hydrology, Hydrogeology and PeatReport · PDF | 8 Jul 2026 | View |
| FEI ES V1 Chapter 12 Built HeritageReport · PDF | 27 Aug 2026 | View |
| ES V2 Appendix 2.3 Non-Statutory Consultation CommentsReport · PDF | 8 Jul 2026 | View |
| Preliminary Risk AssessmentReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 4.20 Typical Compound Fencing (SK13 REV 4)Report · PDF | 8 Jul 2026 | View |
| Supporting Report - 18072025 - VISULISATIONS NS WEB - 2500680FUL-6700401.PDFPL/01/01 Supporting Report · PDF | 5 Dec 2025 | View |
| ES V1 Figure 11.6 ZTV to Hub Height - Bare EarthReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 4.9 SMQ Access Design Swept Path Assessment (SK20 REV 5)Report · PDF | 8 Jul 2026 | View |
| Scout Moor II FEI - You Said We Heard We ActedReport · PDF | 12 Aug 2026 | View |
| FEI ES V2 Appendix 2.4 Post Submission Statutory Consultation CommentsReport · PDF | 12 Aug 2026 | View |
| Supporting Report - 18072025 - VISULISATIONS CH WEB - 2500680FUL-6700400.PDFPL/01/01 Supporting Report · PDF | 5 Dec 2025 | View |
| ES V2 Appendix 11.6 RVAA Figure 3B (A3)Report · PDF | 8 Jul 2026 | View |
| SCOUT MOOR QUARRIES ACCESS DESIGN GENERAL ARRANGEMENT – SK19 REV P5Plan · PDF | 8 Jul 2026 | View |
| RVAA-Visuals_WEBReport · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 15.1 Carbon Calculator Input Data & ResultsReport · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 10.1 Year 1 Ornithology ReportReport · PDF | 8 Jul 2026 | View |
| INDICATIVE ONSITE SUBSTATION LAYOUT - SK10 Rev P5Plan · PDF | 8 Jul 2026 | View |
| Supporting Report - 13112025 - RSPB CONSULTATION RESPONSE - 2500680FUL-6750097.pdfPL/01/01 Supporting Report · PDF | 27 Nov 2025 | View |
| Moorland Restoration and Management Plan.Report · PDF | 8 Jul 2026 | View |
| FEI ES V4 Non-Technical SummaryReport · PDF | 12 Aug 2026 | View |
| Supporting Report - 16072025 - ES V1 FIGURE 421 TYPICAL CROSSING METHODS - 2500680FUL-6698535.PDFPL/01/01 Supporting Report · PDF | 5 Dec 2025 | View |
| ES V1 Figure 4.19 Typical Construction Compound (SK12 REV 4)Report · PDF | 8 Jul 2026 | View |
| FEI ES V1 Figure 16.2 Cumulative Shadow Flicker AssessmentReport · PDF | 12 Aug 2026 | View |
| Economic and Social Benefits StatementReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 10.14 Vantage Point Locations and ViewshedsReport · PDF | 8 Jul 2026 | View |
| Supporting Report - 16072025 - ES V1 CHAPTER 1 INTRODUCTION - 2500680FUL-6698509.PDFPL/01/01 Supporting Report · PDF | 5 Dec 2025 | View |
| ROOLEY MOOR ROAD CROSSING CONSTRUCTION DETAIL – SK18 REV P4Plan · PDF | 8 Jul 2026 | View |
| INFRASTRUCTURE LAYOUT CONSTRUCTION PHASE – SK03 REV P4Plan · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 14.1 Good Practice MethodsReport · PDF | 8 Jul 2026 | View |
| FEI ES V2 Heritage Assessment Appendices 8-12Report · PDF | 12 Aug 2026 | View |
| FEI ES V1 Figure 11.14 Bare Earth ZTV with DesignationsPlan · PDF | 8 Jul 2026 | View |
| Supporting Report - 15092025 - THE COAL AUTHORITY RESPONSE - 2500680FUL-6724466.pdfConsultee Response · PDF | 5 Dec 2025 | View |
| ES V2 Appendix 14.5 Watercourse Crossing InventoryReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 4.8 SMQ Laydown Area and Junction General Arrangement (SK21 REV 4)Report · PDF | 8 Jul 2026 | View |
| Health Impact AssessmentReport · PDF | 8 Jul 2026 | View |
| Supporting Report - 04112025 - CONSULTATION RESPONSE FROM LANCASHIRE WILDLIFE TRUST - 2500680FUL-6746350.pdfPL/01/01 Supporting Report · PDF | 27 Nov 2025 | View |
| RVAA Figure 3AReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 14.7 Groundwater Dependent Terrestrial Ecosystems (GWDTE)Report · PDF | 8 Jul 2026 | View |
| ES V1 Figure 14.10 Peat Restoration Areas.Report · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 14.7 Public Water Supply AssessmentReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 9.6 eDNA ResultsReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 12.3 1930-31 Ordnance Survey 6 InchReport · PDF | 8 Jul 2026 | View |
| Bury CouncilConsultee Response · PDF | 23 Jan 2026 | View |
| ES V1 Figure 14.11 Peatland Condition Assessment.Report · PDF | 8 Jul 2026 | View |
| ES V1 Figure 12.8 Heritage Asset Plan with Hub Height with Screening ZTVReport · PDF | 8 Jul 2026 | View |
| ROOLEY MOOR ROAD CROSSING PLAN VIEW – SK17 REV P5Plan · PDF | 8 Jul 2026 | View |
| ES V1 Figure 1.1 Assessment BoundaryReport · PDF | 8 Jul 2026 | View |
| Natural EnglandConsultee Response · PDF | 26 Jan 2026 | View |
| FEI ES V1 Figure 11.15 Cumulative ZTV Operational with Scout Moor IIPlan · PDF | 8 Jul 2026 | View |
| ES V1 Figure 4.16 Indicative Onsite Substation Layout (P5)Report · PDF | 8 Jul 2026 | View |
| ES V1 Figure 4.24 Infrastructure Layout - Indicative Decommissioning Plan (SK05 REV P4)Report · PDF | 8 Jul 2026 | View |
| FEI ES V1 Chapter 7 Noise and VibrationReport · PDF | 12 Aug 2026 | View |
| ES V2 Contents PageReport · PDF | 8 Jul 2026 | View |
| Outline Habitat Management and Monitoring PlanReport · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 11.6 RVAA Figure 3A (A3)Report · PDF | 8 Jul 2026 | View |
| Supporting Report - 02102025 - CONSULTEE - HISTORIC ENGLAND - 2500680FUL-6733686.pdfPL/01/01 Supporting Report · PDF | 27 Nov 2025 | View |
| ES V1 Figure 10.3 Breeding Bird Survey Results 2023Report · PDF | 8 Jul 2026 | View |
| Supporting Report - 29072025 - STATEMENT OF COMMUNITY INVOLVEMENT - 2500680FUL-6705140.PDFPL/01/01 Supporting Report · PDF | 5 Dec 2025 | View |
| ES V1 Figure 12.2 1894-5 Ordnance Survey 6 InchReport · PDF | 8 Jul 2026 | View |
| Mineral Resource AssessmentReport · PDF | 8 Jul 2026 | View |
| RVAA-Visuals_PRNT versionReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 4.4 Rooley Moor Road Crossing Plan View (SK17 REV 5)Report · PDF | 8 Jul 2026 | View |
| ES V1 Figure 12.6 Heritage Asset Plan with Bare Earth Hub Height ZTVReport · PDF | 8 Jul 2026 | View |
| ES V1 Chapter 9 Ecology 02.06.26 (CLEAN)Report · PDF | 8 Jul 2026 | View |
| National Air Traffic Services- consultee responseConsultee Response · PDF | 21 Sept 2026 | View |
| ES V1 Figure 10.2 Breeding Bird Survey Results 2022Report · PDF | 8 Jul 2026 | View |
| ES V1 Figure 4.21 Typical Track Details (SK14 REV 4)Report · PDF | 8 Jul 2026 | View |
| FEI ES V2 Appendix 7.1 Construction Noise ReportReport · PDF | 12 Aug 2026 | View |
| FEI ES V1 Figure 11.9b Local Landscape CharacterPlan · PDF | 8 Jul 2026 | View |
| ES V1 Figure 4.17 Indicative Onsite Substation Elevation (P5)Report · PDF | 8 Jul 2026 | View |
| Supporting Report - 22092025 - CONSULTATION RESPONSE FROM ENV AGENCY - 2500680FUL-6727531.pdfPL/01/01 Supporting Report · PDF | 5 Dec 2025 | View |
| ES V2 Appendix 12.7 Wireline Visualisations and Reference PhotographyReport · PDF | 8 Jul 2026 | View |
| FEI ES V1 Chapter 17 SummaryReport · PDF | 12 Aug 2026 | View |
| FEI ES V1 Figure 7.3 Cumulative Wind TurbinesReport · PDF | 12 Aug 2026 | View |
| TYPICAL WATER CROSSING METHODS – SK15 REV P4Plan · PDF | 8 Jul 2026 | View |
| Statutory_Biodiversity_Metric_Calculation_Tool Rev5Report | 8 Jul 2026 | View |
| Supporting Report - 18072025 - APPENDIX 1 APPLICATION DOCUMENTATION - 2500680FUL-6700647.DOCXPL/01/01 Supporting Report | 5 Dec 2025 | View |
| FEI Carbon Calculator FINAL 2026.05.21 excelReport | 5 Oct 2026 | View |
| TYPICAL TURBINE FOUNDATION DETAIL – SK07 REV P4Plan · PDF | 8 Jul 2026 | View |
| ES V1 Figure 14.4 Bedrock GeologyReport · PDF | 8 Jul 2026 | View |
| TYPICAL TURBINE ELEVATION – SK06 REV P4Plan · PDF | 8 Jul 2026 | View |
| ES V1 Chapter 4 Development SpecificationReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 10.4 Breeding Bird Survey Results 2024Report · PDF | 8 Jul 2026 | View |
| Outdoor Access MEPReport · PDF | 8 Jul 2026 | View |
| FEI ES V2 Appendix 7.2 Operational Noise ReportReport · PDF | 12 Aug 2026 | View |
| Indicative Fencing Layout (Version 10)Plan · PDF | 8 Jul 2026 | View |
| ES V1 Figure 4.3 Infrastructure Layout - Operational Phase (SK04 REV P5)Report · PDF | 8 Jul 2026 | View |
| Transport Assessment (inc AIL Survey)Report · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 14.9 Peat Condition Assessment.Report · PDF | 8 Jul 2026 | View |
| FEI ES V2 Appendix 12.1 Heritage AssessmentReport · PDF | 27 Aug 2026 | View |
| ES V1 Contents PageReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 11.7 ZTV to Blade Tip with ScreeningReport · PDF | 8 Jul 2026 | View |
| ES V1 Chapter 10 OrnithologyReport · PDF | 8 Jul 2026 | View |
| Supporting Report - 13102025 - DRAINAGE CONSULTEE RESPONSE - 2500680FUL-6736110.docxPL/01/01 Supporting Report | 27 Nov 2025 | View |
| Supporting Report - 10102025 - CONSULTATION RESPONSE FROM NATIONAL TRUST - 2500680FUL-6735345.pdfPL/01/01 Supporting Report · PDF | 27 Nov 2025 | View |
| ES V1 Figure 14.5b Hydrological Features.Report · PDF | 8 Jul 2026 | View |
| FEI ES V1 Figure 11.16 Cumulative ZTV Calderdale with Scout Moor IIPlan · PDF | 8 Jul 2026 | View |
| ES V1 Figure 14.8 Peat Depth of Penetration and Probe Locations.Report · PDF | 8 Jul 2026 | View |
| ES V1 Chapter 3 Assessment Boundary ContextReport · PDF | 8 Jul 2026 | View |
| Public Rights of Way Officer CommentsConsultee Response | 12 May 2026 | View |
| ES V2 Appendix 1.2 Schedule of CompetenceReport · PDF | 8 Jul 2026 | View |
| Met Office consultation responseConsultee Response · PDF | 22 Dec 2025 | View |
| ES V1 Figure 4.1 Infrastructure Layout (SK02 REV P4)Report · PDF | 8 Jul 2026 | View |
| Supporting Report - 31072025 - OWNERSHIP SCHEDULE - REDACTED - 2500680FUL-6706816.pdfPL/01/01 Supporting Report · PDF | 5 Dec 2025 | View |
| ES V1 Chapter 13 ArchaeologyReport · PDF | 8 Jul 2026 | View |
| ROOLEY MOOR ROAD CROSSING PLAN LONGITUDINAL SECTION – SK16 REV P5Plan · PDF | 8 Jul 2026 | View |
| ES V1 Figure 10.1b Non-statutory Designations within 2km - OrnithologyReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 4.23 Proposed Indicative Fencing Layout/Access Point Locations V10Report · PDF | 8 Jul 2026 | View |
| FEI ES V1 Figure 16.1 Cumulative Project Plan (1)Report · PDF | 12 Aug 2026 | View |
| ES V1 Figure 9.2 UKHab Baseline Figure - OverviewReport · PDF | 8 Jul 2026 | View |
| Sustainability Energy and Climate Change Statement.Report · PDF | 8 Jul 2026 | View |
| Mining Risk AssessmentReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 14.5 Hydrological FeaturesReport · PDF | 8 Jul 2026 | View |
| Scout Moor II FEI - Applicant Response to Consultee Comments.Report · PDF | 12 Aug 2026 | View |
| ES V2 Appendix 11.6 RVAA Figure 2 (A3)Report · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 10.2 Year 2 Ornithology ReportReport · PDF | 8 Jul 2026 | View |
| Supporting Report - 16072025 - ES V1 FIGURE 404 ROOLEY MOOR RD CROSSING -PLAN VIEW - 2500680FUL-6698520.PDFPL/01/01 Supporting Report · PDF | 5 Dec 2025 | View |
| Supporting Report - 26082025 - CONSULTATION RESPONSE FROM NATS SAFEGUARDING - 2500680FUL-6716332.pdfPL/01/01 Supporting Report · PDF | 5 Dec 2025 | View |
| ES V1 Figure 4.6 Rooley Moor Road Crossing Construction Detail (SK18 REV 4)Report · PDF | 8 Jul 2026 | View |
| ES V1 Figure 9.5 Bat Static LocationsReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 12.7 Heritage Asset Plan with Blade Tip with Screening ZTVReport · PDF | 8 Jul 2026 | View |
| FEI ES V2 Heritage Assessment Appendices 2-7Report · PDF | 12 Aug 2026 | View |
| ES V1 Figure 4.7 SMQ Access Design General Arrangement (SK19 REV 5)Report · PDF | 8 Jul 2026 | View |
| Supporting Report - 16072025 - ES V1 FIGURE 417 TYPICAL SUBSTATION ELEVATION - 2500680FUL-6698537.PDFPL/01/01 Supporting Report · PDF | 5 Dec 2025 | View |
| ES V1 Chapter 6 Transport and AccessReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 10.10 Vantage Point Survey Results - Waders (April 2022 to August 2024)Report · PDF | 8 Jul 2026 | View |
| Biodiversity Net Gain AssessmentReport · PDF | 8 Jul 2026 | View |
| Flood Risk AssessmentReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 12.11 Heritage Asset Plan-Assets assessed within the EIA with Hub HeightReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 14.5a Hydrological FeaturesReport · PDF | 8 Jul 2026 | View |
| Residential Visual Amenity AssessmentReport · PDF | 8 Jul 2026 | View |
| Supporting Report - 13102025 - CONSULTATION RESPONSE FROM LLFA OFFICER - 2500680FUL-6736672.PDFPL/01/01 Supporting Report · PDF | 27 Nov 2025 | View |
| INDICATIVE ONSITE SUBSTATION ELEVATIONS - SK11 Rev P5Plan · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 11.7 LVIA Illustrative WirelinesReport · PDF | 8 Jul 2026 | View |
| FEI ES V1 Chapter 11 Landscape and VisualReport · PDF | 8 Jul 2026 | View |
| FEI ES V1 Figure 11.10 Design AnalysisPlan · PDF | 8 Jul 2026 | View |
| ES V1 Figure 9.1b Non-statutory DesignationsReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 4.10 SMQ Laydown Area and Junction Swept Path Assessment (SK22 REV 4)Report · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 6.1 Transport Assessment.Report · PDF | 8 Jul 2026 | View |
| Supporting Report - 08092025 - CONSULTATION RESPONSE FROM MET OFFICE - 2500680FUL-6722507.pdfPL/01/01 Supporting Report · PDF | 5 Dec 2025 | View |
| Supporting Report - 16072025 - ES V1 CONTENTS PAGE - 2500680FUL-6698507.PDFPL/01/01 Supporting Report · PDF | 5 Dec 2025 | View |
| Supporting Report - 28072025 - MINING RISK ASSESSMENT - PART 16 - 2500680FUL-6704767.PDFPL/01/01 Supporting Report · PDF | 5 Dec 2025 | View |
| Supporting Report - 25092025 - MOD SAFEGUARDING CONSULTATION RESPONSE - 2500680FUL-6729493.pdfPL/01/01 Supporting Report · PDF | 5 Dec 2025 | View |
| TYPICAL CONSTRUCTION COMPOUND – SK12 REV P4Plan · PDF | 8 Jul 2026 | View |
| Supporting Report - 24092025 - CONSULTATION RESPONSE FROM GMAAS - 2500680FUL-6729428.pdfPL/01/01 Supporting Report · PDF | 5 Dec 2025 | View |
| RVAA Figure 1Report · PDF | 8 Jul 2026 | View |
| FEI ES V3 Environmental Management PlanReport · PDF | 12 Aug 2026 | View |
| Supporting Report - 28072025 - MINING RISK ASSESSMENT - PART 5 - 2500680FUL-6704756.PDFPL/01/01 Supporting Report · PDF | 5 Dec 2025 | View |
| Supporting Report - 29072025 - STATEMENT OF COMMUNITY INVOLVEMENT - 2500680FUL-6705116.PDFPL/01/01 Supporting Report · PDF | 5 Dec 2025 | View |
| ES V1 Chapter 8 Shadow Flicker 29.05.26 (CLEAN)Report · PDF | 8 Jul 2026 | View |
| TYPICAL CRANE HARDSTANDING – SK08 REV P4Plan · PDF | 8 Jul 2026 | View |
| Scout Moor Quarries Laydown Area and Junction GA - SK21 REV P4Plan · PDF | 8 Jul 2026 | View |
| Outline Decommissioning Restoration and Aftercare StrategyReport · PDF | 8 Jul 2026 | View |
| FEI ES V1 Figure 7.2 Operational Noise Assessment and Noise Monitoring LocationsReport · PDF | 12 Aug 2026 | View |
| Supporting Report - 13112025 - HYNDBURN COUNCIL CONSULTEE RESPONSE - 2500680FUL-6750349.pdfPL/01/01 Supporting Report · PDF | 27 Nov 2025 | View |
| TYPICAL TRACK DETAILS – SK14 REV P4Plan · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 11.6 RVAA Annex 3 Detailed Property Assessment SheetsReport · PDF | 8 Jul 2026 | View |
| ES V1 Chapter 15 Climate ChangeReport · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 13.1 ADBA Part 3 of 4Report · PDF | 8 Jul 2026 | View |
| ES V1 Figure 10.13 Vantage Point Survey Results - Waterfowl (April 2022 to August 2024)Report · PDF | 8 Jul 2026 | View |
| ES V1 Figure 4.12 Typical Turbine Elevation (SK06 REV 4)Report · PDF | 8 Jul 2026 | View |
| ES V1 Figure 11.5 ZTP to Blade Tip - Bare EarthReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 9.1a Designated Sites within 10kmReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 11.3 Cumulative Search AreaReport · PDF | 8 Jul 2026 | View |
| Supporting Report - 15072025 - STATEMENT OF COMMUNITY INVOLVEMENT - 2500680FUL-6698333.PDFPL/01/01 Supporting Report · PDF | 5 Dec 2025 | View |
| Natural EnglandConsultee Response · PDF | 3 Feb 2026 | View |
| ES V1 Figure 4.15 Typical Cable Trench Details (33kV & 132kV) (SK09 REV 5)Report · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 14.2 Peat Survey ReportReport · PDF | 8 Jul 2026 | View |
| TYPICAL COMPOUND FENCING – SK13 REV P4Plan · PDF | 8 Jul 2026 | View |
| ES V1 Figure 14.5c Hydrological FeaturesReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 9.3 NVC Baseline Figure - OverviewReport · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 14.8 Groundwater Dependent Terrestrial Ecosystems AssessmentReport · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 2.1 EIA Scoping ReportReport · PDF | 8 Jul 2026 | View |
| Cable Route Options - Version 4Plan · PDF | 8 Jul 2026 | View |
| Air Quality AssessmentReport · PDF | 8 Jul 2026 | View |
| Aviation Lighting Plan- Version 8Plan · PDF | 8 Jul 2026 | View |
| ES V1 Figure 4.18 Cable Route Options (Version 4)Report · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 14.4 Peat Landslide Hazard & Risk AssessmentReport · PDF | 8 Jul 2026 | View |
| Supporting Report - 28072025 - MINING RISK ASSESSMENT - PART 3 - 2500680FUL-6704754.PDFPL/01/01 Supporting Report · PDF | 5 Dec 2025 | View |
| ES V1 Figure 4.22 Typical Water Crossing Methods (SK15 REV 4)Report · PDF | 8 Jul 2026 | View |
| ES V1 Figure 12.1 1851 Ordnance Survey 6 InchReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 9.8 Peatland Restoration Proposals.Report · PDF | 8 Jul 2026 | View |
| Scout Moor Quarries Laydown Area - Junction Swept Path Assessment - SK22 Rev P4Plan · PDF | 8 Jul 2026 | View |
| ES V1 Chapter 1 IntroductionReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 4.2 Infrastructure Layout - Construction Phase (SK03 REV P4)Report · PDF | 8 Jul 2026 | View |
| INFRASTRUCTURE LAYOUT OPERATIONAL PHASE – SK04 REV P5Plan · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 11.2 Visuals MethodologyReport · PDF | 8 Jul 2026 | View |
| FEI ES V1 Chapter 16 Assessment of Cumulative EffectsReport · PDF | 12 Aug 2026 | View |
| SITE LOCATION PLAN – SK01 REV P3Plan · PDF | 8 Jul 2026 | View |
| Supporting Report - 16072025 - ES V1 CHAPTER 16 ASSESSMENT OF CUMULATIVE EFFECTS - 2500680FUL-6698513.PDFPL/01/01 Supporting Report · PDF | 5 Dec 2025 | View |
| ES V2 Appendix 11.5 Landscape SensitivityReport · PDF | 8 Jul 2026 | View |
| FEI ES V1 Figure 11.11 Aviation Lighting ZTV - Bare EarthPlan · PDF | 8 Jul 2026 | View |
| ES V1 Figure 14.6 Hydrogeological RegimeReport · PDF | 8 Jul 2026 | View |
| Supporting Report - 18072025 - ES V1 FIGURE 97 POST DEVEOPMENT HABITATS - 2500680FUL-6698899.PDFPL/01/01 Supporting Report · PDF | 5 Dec 2025 | View |
| ES V1 Figure 14.5d Hydrological FeaturesReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 4.11 Aviation Lighting (Version 3)Report · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 11.3 Landscape Character BaselineReport · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 9.1 Desk Study and Habitats ResultsReport · PDF | 8 Jul 2026 | View |
| Supporting Report - 10102025 - CONSULTATION RESPONSE FROM UNITED UTILITIES - 2500680FUL-6735367.pdfPL/01/01 Supporting Report · PDF | 27 Nov 2025 | View |
| ES V2 Appendix 13.1 ADBA Part 2 of 4Report · PDF | 8 Jul 2026 | View |
| ES V1 Figure 8.1 Study Area and Shadow Flicker Assessment LocationsReport · PDF | 8 Jul 2026 | View |
| Drainage StrategyReport · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 11.1 LVIA MethodologyReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 4.5 Rooley Moor Road Crossing Plan & Longitudinal Section (SK16 REV 5)Report · PDF | 8 Jul 2026 | View |
| ES V1 Figure 14.3 Superficial GeologyReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 14.2 Soils and Peat MappingReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 4.13 Typical Turbine Foundation Detail (SK07 REV 4)Report · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 9.5 Grid Connection Ecology WalkoverReport · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 14.6 Private Water Supply AssessmentReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 12.5 Heritage Asset Plan with Bare Earth Blade Tip ZTVReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 12.9 Heritage Asset Plan with Assets assessed within the EIAReport · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 10.3 Year 3 Ornithology ReportReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 11.2 Existing Light EnvironmentReport · PDF | 8 Jul 2026 | View |
| RVAA Figure 2Report · PDF | 8 Jul 2026 | View |
| ES V1 Chapter 5 Consideration of AlternativesReport · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 9.4 Great Crested Newt and AmphibiansReport · PDF | 8 Jul 2026 | View |
| CMS Legal Advice NoteReport · PDF | 28 Sept 2026 | View |
| ES V1 Figure 4.14 Typical Crane Hardstanding (SK08 REV 4)Report · PDF | 8 Jul 2026 | View |
| ES V1 Figure 14.1 Hydrological SettingReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 14.9 Estimated Peat DepthReport · PDF | 8 Jul 2026 | View |
| ES V1 Figure 10.12 Vantage Point Survey Results - Kestrel (April 2022 to August 2024)Report · PDF | 8 Jul 2026 | View |
| Supporting Report - 27082025 - CONSULTATION RESPONSE FROM HSE - 2500680FUL-6716829.PDFPL/01/01 Supporting Report · PDF | 5 Dec 2025 | View |
| Supporting Report - 16072025 - ES V1 FIGURE 416 TYPICAL SUBSTATION LAYOUT - 2500680FUL-6698536.PDFPL/01/01 Supporting Report · PDF | 5 Dec 2025 | View |
| ES V2 Appendix 13.1 ADBA Part 4 of 4Report · PDF | 8 Jul 2026 | View |
| ES V2 Appendix 12.2-12.6Report · PDF | 8 Jul 2026 | View |
| ES V1 Chapter 2 Approach to EIAReport · PDF | 8 Jul 2026 | View |
| INFRASTRUCTURE LAYOUT – SK02 REV P4Plan · PDF | 8 Jul 2026 | View |
| ES V1 Figure 10.6 Breeding Bird Survey Results 2024 - Skylark.Report · PDF | 8 Jul 2026 | View |
| ES V1 Figure 9.7 Post development habitats - OverviewReport · PDF | 8 Jul 2026 | View |
| INFRASTRUCTURE LAYOUT INDICATIVE DECOMMISSIONING PLAN – SK05 REV P4Plan · PDF | 8 Jul 2026 | View |
| Aviation and Met Radar AssessmentReport · PDF | 8 Jul 2026 | View |
| TYPICAL CABLE TRENCH DETAILS – SK09 REV P5Plan · PDF | 8 Jul 2026 | View |
| ES V1 Figure 10.1a Designated Sites within 10km - OrnithologyReport · PDF | 8 Jul 2026 | View |
| FEI ES V1 Figure 11.12 Bare Earth ZTV with Landscape CharacterPlan · PDF | 8 Jul 2026 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceWe haven’t collected any decision conditions for this application.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.