Council planning record

Discharge of Conditions 31 (Engineering Detials and Design Highways Works) of planning permission 22/0676/10 (Amended Plans Rec. 17/10/25)

Former Aberdare Hospital Site Off Abernant Road Aberdare CF44 0RF

Pending DecisionReference: 25/0419/DISRhondda Cynon Taf County Borough Council

Application location

Former Aberdare Hospital Site Off Abernant Road Aberdare CF44 0RF

This record has no verified map location.

View council map

Application summary

Status
Pending Decision
Application type
Discharge of Condition/s
Received
11 Apr 2025
Validated
11 Apr 2025
Determination deadline
6 Jun 2025
Local authority
Rhondda Cynon Taf County Borough Council

Application overview

Discharge of Conditions 31 (Engineering Detials and Design Highways Works) of planning permission 22/0676/10 (Amended Plans Rec. 17/10/25)

Proposal details

Reference
25/0419/DIS
Ward
Aberdare East
Agent
Asbri Planning

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 112 of 112

DocumentPublishedAction
2466-104-2-E SECTION 38AMDPLAN · PDF20 Oct 2025View
2466-105-1-E SECTION 38 LAYOUT PHASE 2 SOUTH SHEET 1 OF 2AMDPLAN · PDF20 Oct 2025View
2466-105-2-D-SECTION 38 LAYOUT PHASE 3 NORTH SHEET 2 OF 2AMDPLAN · PDF20 Oct 2025View
2466-106-1-D - LONGITUDINAL SECTIONS PHASE 1 SOUTHAMDPLAN · PDF20 Oct 2025View
2466-106-2-D - LONGITUDINAL SECTIONS PHASE 1 SOUTHEASTAMDPLAN · PDF20 Oct 2025View
2466-106-2-E - LONGITUDINAL SECTIONS PHASE 1 SOUTHEASTAMDPLAN · PDF20 Oct 2025View
2466-106-3-D - LONGITUDINAL SECTIONS PHASE 1 SOUTH WESTAMDPLAN · PDF20 Oct 2025View
2466-106-3-E - LONGITUDINAL SECTIONS PHASE 1 SOUTH WESTAMDPLAN · PDF20 Oct 2025View
2466-LANDSCAPE TREATMENTAMDPLAN20 Oct 2025View
2466-107-2-F LONGITUTINAL SECTIONS - PHASE 2 NORTH 2OF3AMDPLAN · PDF20 Oct 2025View
2466-107-3-C - LONITUDINAL SECTIONS PHASE 2 NORTH 3OF3AMDPLAN · PDF20 Oct 2025View
2466-107-3-D - LONGITUDINAL SECTIONS - PHASE 2 NORTH 3OF 3AMDPLAN · PDF20 Oct 2025View
2466-108 TYPICAL DRAINAGE CONSTRUCTION DETAILS - SECTION 104AMDPLAN · PDF20 Oct 2025View
2466-109-4-B MANHOLE SCHEDULES - CATCHMENT BAMDPLAN · PDF20 Oct 2025View
12580 ABERDARE HOSPITAL POST DEMOLITION GEOENVIRONMENTAL SITE INVESTIGATION REPOAMDPLAN · PDF20 Oct 2025View
12580 ABERDARE HOSPITAL POST DEMOLITION SITE INVESTIGATION REPORTAMDPLAN · PDF20 Oct 2025View
2466-100-1-R ENGINEERING LAYOUT PHASE 1 - SHEET 1 OF 5AMDPLAN · PDF20 Oct 2025View
2466-100-2-N ENGINEERING LAYOUT PHASE 1 - SHEET 2 OF 5AMDPLAN · PDF20 Oct 2025View
2466-100-3-P ENGINEERING LAYOUT PHASE 1 - SHEET 2 OF 5AMDPLAN · PDF20 Oct 2025View
2466-100-4P ENGINEERING LAYOUT PHASE 1 - SHEET 4 OF 5AMDPLAN · PDF20 Oct 2025View
2466-100-5-G ENGINEERING LAYOUT PHASE 1 - SHEET 5 OF 5AMDPLAN · PDF20 Oct 2025View
2466-101-1-J ENGINEERING LAYOUT PHASE 2 SHEET 1 OF 4AMDPLAN · PDF20 Oct 2025View
2466-101-2- G ENGINEERING LAYOUT PHASE 2 SHEET 2 OF 4AMDPLAN · PDF20 Oct 2025View
2466-101-3-E ENGINEERING LAYOUT PHASE 2 SHEET 3 OF 4AMDPLAN · PDF20 Oct 2025View
2466-101-4-K ENGINEERING LAYOUT PHASE 2 SHEET 4 OF 4AMDPLAN · PDF20 Oct 2025View
2466-104-1-E SECTION 38 LAYOUT PHASE 1 SOUTH SHEET 1 OF 2AMDPLAN · PDF20 Oct 2025View
2466-107-2-E LONGITUDINAL SECTIONS - PHASE 2 NORTH 2 OF 3AMDPLAN · PDF20 Oct 2025View
2466-107-1-B LONGITUDINAL SECTIONS PHASE 2 NORTH 1 OF 3AMDPLAN · PDF20 Oct 2025View
200710-WDL-TN001 THINK URBAN DRAINAGE STRATEGYAMDPLAN · PDF20 Oct 2025View
200710-WDL-D-011 B EXISTING AND PROPOSED IMPERMEABLE AREA PLANAMDPLAN · PDF20 Oct 2025View
2466-104-1-G SECTION 38 LAYOUT PHASE 1 SOUTH SHEET 1OF2AMDPLAN · PDF20 Oct 2025View
2466-104-2-G SECTION 38 LAYOUT PHASE 1 NORTH SHEET 2OF2AMDPLAN · PDF20 Oct 2025View
2466-106-1-D - LONGITUDINAL SECTIONS PHASE 1 SOUTHAMDPLAN · PDF20 Oct 2025View
2466-106-2-E - LONGITUDINAL SECTIONS - PHASE 1 SOUTH EASTAMDPLAN · PDF20 Oct 2025View
2466-106-3-E LONGITUDINAL SECTIONS PHASE 1 SOUTH WESTAMDPLAN · PDF20 Oct 2025View
2466-108- TYPICAL DRAINAGE CONSTRUCTION DETAILS - SECTION 104AMDPLAN · PDF20 Oct 2025View
2466-109-7-F MANHOLE SCHEDULES SW CATCHMENT CAMDPLAN · PDF20 Oct 2025View
2466-111-A-PRIVATE PERMEABLE PAVING SCHEDULESAMDPLAN · PDF20 Oct 2025View
2466-115-B SITE LOCATION PLAN S38AMDPLAN · PDF20 Oct 2025View
2466-116-GREENFIELD AREAS PLANAMDPLAN · PDF20 Oct 2025View
2466-122-1-J SAB ADOPTION PLAN CATCHMENT C SHEET 1OF3AMDPLAN · PDF20 Oct 2025View
2466-122-2 K SAB ADOPTION PLAN - CATCHMENT C SHEET 2OF 3AMDPLAN · PDF20 Oct 2025View
2466-122-3-G SAB ADOPTION PLAN - CATCHMENT C SHEET 3OF3AMDPLAN · PDF20 Oct 2025View
2466-130-C SUDS CATCHMENT PLANAMDPLAN · PDF20 Oct 2025View
2466-131- PRE-DEVELOPMENT RUN OFF PLANAMDPLAN · PDF20 Oct 2025View
2466-133-J IMPERMEABLE AREAS PLANAMDPLAN · PDF20 Oct 2025View
2466-136-B BASIN SECTIONS CATCHMENT CAMDPLAN · PDF20 Oct 2025View
2466-138-2-D BIORETENTION SCHEDULE - CATCHMENT CAMDPLAN · PDF20 Oct 2025View
2466-139-A PROPOSED EXCEEDANCE PLAN CATCHEMENT CAMDPLAN · PDF20 Oct 2025View
2466-140-6-E HYDROBRAKE CONSTRUCTION DETAILS SC15AMDPLAN · PDF20 Oct 2025View
2466-140-7-D-HYDROBRAKE CONSTRUCTION DETAIL SC40AMDPLAN · PDF20 Oct 2025View
12580 ABERDARE HOSPITAL POST DEMOLITION GEOENVIRONMENTAL SITE INVESTIGATION REPOAMDPLAN · PDF20 Oct 2025View
12580 ABERDARE HOSPITAL POST DEMOLITION GEOENVIRONMENTAL SITE INVESTIGATION REPOAMDPLAN · PDF20 Oct 2025View
20071-WDL-D011 B EXISTING AND PROPOSED IMPERMEABLE AREA PLANAMDPLAN · PDF20 Oct 2025View
20071-WDL-TN001 THINK URBAN DRAINAGE STRATEGYAMDPLAN · PDF20 Oct 2025View
2466-100-1-R ENGINEERING LAYOUT PHASE 1 SHEET 1 OF 5AMDPLAN · PDF20 Oct 2025View
2466-100-S-N ENGINEERING LAYOUT PHASE 1 SHEET 2 OF 5AMDPLAN · PDF20 Oct 2025View
2466-100-3- P ENGINEERING LAYOUT PHASE 1 SHEET 3 OF 5AMDPLAN · PDF20 Oct 2025View
2466-100-4-P ENGINEERING LAYOUT - PHASE 1 SHEET 4OF5AMDPLAN · PDF20 Oct 2025View
2466-100-5-G ENGINEERING LAYOUT - PHASE 1 SHEET 5OF 5AMDPLAN · PDF20 Oct 2025View
LLFACONSULTN9 Sept 2025View
2466-115-B SITE LOCATION PLANPLAN · PDF28 Aug 2025View
2466-145-B AQUAKERB CONSTRUCTION DETAILSPLAN · PDF28 Aug 2025View
2466-100-5-F- ENGINEERING LAYOUT PHASE 1 SHEET 5OF5PLAN · PDF28 Aug 2025View
2466-105-2-D SECTION 38 LAYOUT PHASE 2 NORTH SHEET 2OF2PLAN · PDF28 Aug 2025View
2466-116-1-C SWEPT PATH ANALYSIS- REFUSE -NORTH REV CPLAN · PDF28 Aug 2025View
2466-120-3-D SAB ADOPTION PLAN - CATCHMENT A SHEET 3 OF 5PLAN · PDF28 Aug 2025View
2466-126-2-E SURFACING AND KERBING LAYOUT - PHASE 2 - NORTH- SHEET 2OF2PLAN · PDF28 Aug 2025View
2466-146-A- BIORETENTION DIFFUSER CHAMBER DETAILS -A3L SIZEPLAN · PDF28 Aug 2025View
2466-101-1-I ENGINEERING LAYOUT - PHASE 2 - SHEET 1 OF 4PLAN · PDF28 Aug 2025View
2466-106-1-D- LONGITUTINAL SECTIONS - PHASE 1 - SOUTHPLAN · PDF28 Aug 2025View
2466-116-2-C SWEPT PATH ANALYSIS - REFUSE - SOUTH REV CPLAN · PDF28 Aug 2025View
2466-120-4-G-SAB ADOPTION PLANPLAN · PDF28 Aug 2025View
2466-127-1-E SURFACING AND KERBING LAYOUT - PHASE 1 SOUTH - SHEET 1OF 2PLAN · PDF28 Aug 2025View
2466 HIGHWAY CONSTRUCTION DETAILS - FOTHERGILL PARK REV. APLAN · PDF28 Aug 2025View
2466-101-2-F ENGINEERING LAYOUT - PHASE 2 SHEET 2 OF 4PLAN · PDF28 Aug 2025View
2466-106-2-E - LONGITUDINAL SECTIONS - PHASE 1 - SOUTH EASTPLAN · PDF28 Aug 2025View
2466-117-0 CONTOUR PLAN- S38PLAN · PDF28 Aug 2025View
2466-120-5-F-SAB ADOPTION PLAN CATCHMENT A SHEET 5OF5PLAN · PDF28 Aug 2025View
2466-127-2-E SURFACING AND KERBING LAYOUT PHASE 1 - NORTH SHEET 2OF2PLAN · PDF28 Aug 2025View
S3-EST-154 ABERDARE HOSPITAL SITE - PHASE 1 S.38 (V5)PLAN28 Aug 2025View
2466-101-3-D - ENGINEERING LAYOUT PHASE 2 - SHEET 3OF4PLAN · PDF28 Aug 2025View
2466-106-E LONGITUDINAL SECTIONS - PHASE 1 - SOUTH WESTPLAN · PDF28 Aug 2025View
2466-118-1-0- COMBINED SERVICES PLAN - SHEET 1PLAN · PDF28 Aug 2025View
2466-121-C SAB ADOPTION PLAN CATCHMENT BPLAN · PDF28 Aug 2025View
2466-128-B- SIGNING AND LINING DETAILSPLAN · PDF28 Aug 2025View
2466-100-1-Q ENGINEERING LAYOUT - PHASE 1 SHEET 1OF5PLAN · PDF28 Aug 2025View
2466-101-4-J- ENGINEERING LAYOUT - PHASE 2 SHEET 4OF4PLAN · PDF28 Aug 2025View
2466-107-1-B LONGITUDINAL SECTIONS - PHASE 2 - NORTH 1 OF 3PLAN · PDF28 Aug 2025View
2466-118-2-0- COMBINED SERVICES PLAN SHEET 2PLAN · PDF28 Aug 2025View
2466-122-1-H- SAB ADOPTION PLAN- CATCHMENT C SHEET 1OF 3PLAN · PDF28 Aug 2025View
2466-129-0 SIGNING AND LINING PLANPLAN · PDF28 Aug 2025View
2466-100-2-M ENGINEERING LAYOUT - PHASE 1 SHEET 2OF5PLAN · PDF28 Aug 2025View
2466-104-14-E SECTION 38 LAYOUT - PHASE 1 SOUTH - SHEET 1OF2PLAN · PDF28 Aug 2025View
2466-107-2-F LONGITUDINAL SECTIONS PHASE 2 - NORTH 2OF3PLAN · PDF28 Aug 2025View
2466-118-3-0- COMBINED SERVICES PLAN SHEET 3PLAN · PDF28 Aug 2025View
2466-122-2-I-SAB ADOPTION PLAN CATCHMENT C - SHEET 2OF3PLAN · PDF28 Aug 2025View
2466-141-1-G BIORETENTIONPLAN · PDF28 Aug 2025View
2466-100-3-0- ENGINEERING LAYOUT- PHASE 1 - SHEET 3OF5PLAN · PDF28 Aug 2025View
2466-104-2-E SECTION 38 LAYOUT PHASE 1 NORTH SHEET 2OF2PLAN · PDF28 Aug 2025View
2466-107-3-D LONGITUDINAL SECTIONS PHASE 2 NORTH 3OF3PLAN · PDF28 Aug 2025View
2466-120-1-D SAB ADOPTION PLAN - CATCHMENT A SHEET 1OF5PLAN · PDF28 Aug 2025View
2466-122-3-E- SAB ADOPTION PLAN CATCHMENT C SHEET 3OF3PLAN · PDF28 Aug 2025View
2466-143-1-B BASIN CONSTRUCTION DETAILSPLAN · PDF28 Aug 2025View
2466-100-A-O ENGINEERING LAYOUT - PHASE 1 SHEET 4OF5PLAN · PDF28 Aug 2025View
2466-105-1-E SECTION 38 LAYOUT PHASE 2 - SOUTH SHEET 1OF2PLAN · PDF28 Aug 2025View
2466-108 TYPICAL DRAINAGE CONSTRUCTION DETAILS - SECTION 104PLAN · PDF28 Aug 2025View
2466-120-2-G-SAB ADOPTION PLAN - CATCHMENT A - SHEET 2OF5PLAN · PDF28 Aug 2025View
2466-126-1-E SURFACING AND KERBING LAYOUT PHASE 2 SOUTH- SHEET 1OF2PLAN · PDF28 Aug 2025View
S3-EST-154 - ABERDARE HOSPITAL SITE - PHASE 1 S.38 (V4)Supporting Info1 Aug 2025View
APP FORMApplication Form · PDF11 Apr 2025View
COVERING LETTERSupporting Info · PDF11 Apr 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Registered

    Published milestoneCouncil source
  3. Application Validated

    Published milestoneCouncil source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.