Council planning record

Discharge of Requirement 17 (Protection of Highway Surfaces), Requirement 18 (Construction Traffic Management Plan) and Requirement 19 (Construction Workers Travel Plan) ) in relation to Work Nos.2A & 2b and 6 of the NZT DCO of reference number EN010103 for theThe Net Zero Teesside Order 2024 (the ‘...

LAND AT AND IN THE VICINITY OF THE FORMER REDCAR STEEL WORKS SITE REDCAR AND STOCKTON ON TEES TEESSIDE

ApprovedReference: R/2025/0585/CDRedcar and Cleveland Borough Council

Application location

LAND AT AND IN THE VICINITY OF THE FORMER REDCAR STEEL WORKS SITE REDCAR AND STOCKTON ON TEES TEESSIDE

This record has no verified map location.

Application summary

Status
Approved
Application type
Condition Discharge
Received
8 Sept 2025
Validated
8 Sept 2025
Determination deadline
Not published
Local authority
Redcar and Cleveland Borough Council

Application overview

Discharge of Requirement 17 (Protection of Highway Surfaces), Requirement 18 (Construction Traffic Management Plan) and Requirement 19 (Construction Workers Travel Plan) ) in relation to Work Nos.2A & 2b and 6 of the NZT DCO of reference number EN010103 for theThe Net Zero Teesside Order 2024 (the ‘...

Proposal details

Reference
R/2025/0585/CD
Agent
Mr Robert Booth

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 10 of 10

DocumentPublishedAction
ApplicationFormRedacted.pdfApplication Form8 Sept 2025View
National Highways.pdfConsultee Response - National Highways1 Oct 2025View
Decision Notice.pdfDecision Notice16 Dec 2025View
Compliance Officer report _R20250585CD(1).pdfCompliance Officer Report R20250585CD16 Dec 2025View
NZT DCO OSBL Req 17 18 and 19 Covering Letter.pdfCovering Letter8 Sept 2025View
NZT DCO - Highway Condition Survey Scope EV-00011 Rev 01.pdfRequirement 17 - Protection of Highway Surfaces8 Sept 2025View
NZT DCO Construction traffic management Plan DCO 02A2B6 Rev1.pdfRequirement 18 - Construction Traffic Management Plan8 Sept 2025View
NZT DCO Construction Worker Travel Plan DC02AB6 Rev R1.pdfRequirement 19 - Construction Worker Travel Plan8 Sept 2025View
NZT - OSBL Works Plans.pdfWorks Plans8 Sept 2025View
NZT OSBL South Traffic Movements (RCBC).xlsxSouth Traffic Movements RCBC6 Nov 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source

Decision & conditions

CONDITION DISCHARGE GRANTED
Decision Notice.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.