Partial Discharge of Requirement 11 (Surface and Foul Water Drainage) for construction, which relate specifically to Work Nos. 1, 3B, 7 and 9A of the NZT DCO of reference number EN010103 for the Net Zero Teesside Order 2024 (the ‘Order’), which was made by the Secretary of State for the Department f...
LAND AT AND IN THE VICINITY OF THE FORMER REDCAR STEEL WORKS SITE REDCAR AND STOCKTON ON TEES TEESSIDE
Partial Discharge of Requirement 11 (Surface and Foul Water Drainage) for construction, which relate specifically to Work Nos. 1, 3B, 7 and 9A of the NZT DCO of reference number EN010103 for the Net Zero Teesside Order 2024 (the ‘Order’), which was made by the Secretary of State for the Department f...
Reference
R/2025/0104/CD
Agent
DWD PLANNING AND PROPERTY LIMITED
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.