Submission of details for Requirement 31 (1) and (2) (Light Emissions) in relation to Stage 9 for two offshore wind turbine generating stations and associated infrastructure in the Dogger Bank Zone and the Borough of Redcar and Cleveland. The full description of the authorised development is specifi...
DOGGER BANK WIND FARM C ONSHORE CONVERTER STATION (OCS) AND ASSOCIATED WORKS NEAR LACKENBY NATIONAL GRID SUBSTATION
Submission of details for Requirement 31 (1) and (2) (Light Emissions) in relation to Stage 9 for two offshore wind turbine generating stations and associated infrastructure in the Dogger Bank Zone and the Borough of Redcar and Cleveland. The full description of the authorised development is specifi...
Reference
R/2025/0045/CD
Agent
Royal HaskoningDHV
Sign in to view all collected council fields and recorded changes.
LF700013-CST-DOG-REP-0172 Appendix B Drawings and Calculations.pdfAppendix B Drawings And Calculations23 Jan 2025View
LF700013-CST-DOG-REP-0172 Appendix A Consent Boundaries and Staging Plans Stage 9.pdfAppendix A Consent Boundaries And Staging Plans Stage 923 Jan 2025View
LF700013-CST-DOG-REP-0172 Scheme for the Management and Mitigation of Artificial Light Emissions DCO Stage 9.pdfScheme For The Management And Mitigation Of Artificial Light Emissions Dco Stage 923 Jan 2025View
AU-PM763-016-00010_Cover Letter R31 Artifical Lighting Scheme DCO Stage 9.pdfCover Letter23 Jan 2025View
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.