Installation and operation of an Energy Storage System (ESS) including energy storage units, power conversion units, substation, site access, landscaping and supporting infrastructure

Land at Long Acres Teesworks site North West of the A1085 Redcar

WithdrawnReference: R/2024/0843/FFMRedcar and Cleveland Borough Council

Last published check: 15 Sept 2026, 00:26. Check the council record for more recent changes.

Application location

Land at Long Acres Teesworks site North West of the A1085 Redcar

This record has no verified map location.

Application summary

Status
Withdrawn
Application type
Major Application
Received
19 Dec 2024
Validated
19 Dec 2024
Determination deadline
Not published
Local authority
Redcar and Cleveland Borough Council

Application overview

Installation and operation of an Energy Storage System (ESS) including energy storage units, power conversion units, substation, site access, landscaping and supporting infrastructure

Proposal details

Reference
R/2024/0843/FFM
Agent
Lichfields

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 55 of 55

DocumentPublishedAction
ApplicationFormRedacted.pdfApplication Form19 Dec 2024View
BESS - Planning 0843(1).pdfConsultee response - Cleveland Fire Brigade7 Jan 2025View
Consultee Response Northumbrian Water.pdfConsultee response - Northumbrian Water7 Jan 2025View
EA_R.2024.0843.FFM_Official_09.01.2025.pdfConsultee response - Environment Agency9 Jan 2025View
HSL-241220103145-321-FinalOutcome 0843.pdfConsultee response - Health & Safety Executive PADHI+9 Jan 2025View
Consultee Response - Active Travel(1).pdfConsultee Response - Active Travel9 Jan 2025View
R-2024-0843-FFM Long Acres Site Teesworks.pdfConsultee response - Strategic Planning (Policy)9 Jan 2025View
Police ALO.pdfConsultee response - Cleveland Police10 Jan 2025View
2025 01 13 BESS LongAcres REC NON DET.pdfConsultee response - National Highways14 Jan 2025View
0843.pdfCondition - CATs Pipeline15 Jan 2025View
0843(1).pdfConsultee response - Environmental Protection (Contaminated Land)15 Jan 2025View
Noise.pdfConsultee response - Environmental Protection (Nuisance)15 Jan 2025View
Natural England.pdfConsultee response - Natural England28 Jan 2025View
LLFA 0843.pdfConsultee response - Engineers (Local Lead Flood Authority)12 Feb 2025View
National Highways Response.pdfConsultee response - National Highways18 Mar 2025View
Consultee Response - Business Growth.pdfConsultee Response - Business Growth28 Mar 2025View
EM9-NPLUK-PS-BE00-DR-ED-0002-S1-P01.01_Site Location Plan.pdfSite Location Plan19 Dec 2024View
Land at Long Acres Teesworks site Redcar.pdfNeighbour Comments - Potts G Middlesbrough College31 Jan 2025View
RCC letter of support re NatPower project.pdfNeighbour Comments - Redcar & Cleveland College3 Feb 2025View
Natpower 15.01 A Turley.pdfNeighbour Comments - Turley A MP13 Feb 2025View
NatPower UK letter of support Darlington College R20240843FFM Redcar.pdfNeighbour Comments - Darlington College4 Mar 2025View
Proposed BESS Block Plan.pdfProposed Bess Block Plan19 Dec 2024View
Battery Container Details.pdfBattery Container Details19 Dec 2024View
Power Conversion System Details.pdfPower Conversion System Details19 Dec 2024View
33kV Switchgear Building Details.pdf33kV Switchgear Building Details19 Dec 2024View
Storage Container Details.pdfStorage Container Details19 Dec 2024View
Customer Substation Plan and Section Details.pdfCustomer Substation Plan and Section Details19 Dec 2024View
Site Accoustic Fencing Detail.pdfSite Accoustic Fencing Detail19 Dec 2024View
Site fencing and gate details.pdfSite fencing and gate details19 Dec 2024View
Attenuation Pond Typical Details.pdfAttenuation Pond Typical Details19 Dec 2024View
Typical Cross Section Details Maintenance Road.pdfTypical Cross Section Details Maintenance Road19 Dec 2024View
Maintenance Road and Culvert Typical Cross Section Details.pdfMaintenance Road and Culvert Typical Cross Section Details19 Dec 2024View
Oil Filled Transformer.pdfOil Filled Transformer19 Dec 2024View
L V Building Details.pdfL V Building Details19 Dec 2024View
Control Room Details.pdfControl Room Details19 Dec 2024View
Lighting and CCTV Column Details.pdfLighting and CCTV Column Details19 Dec 2024View
400kV Transformer and Bund Details.pdf400kV Transformer and Bund Details19 Dec 2024View
Water tank and pump housing Typical Details.pdfWater tank and pump housing Typical Details19 Dec 2024View
Habitat Regulation Assessment.pdfHabitat Regulation Assessment19 Dec 2024View
High-Level Draft Scheme Report.pdfHigh Level Draft Scheme Report19 Dec 2024View
Landscape Proposals.pdfLandscape Proposals19 Dec 2024View
Noise Impact Assessment.pdfNoise Impact Assessment19 Dec 2024View
Outline Battery Safety Management Plan.pdfOutline Battery Safety Management Plan19 Dec 2024View
Statement of Community Involvement.pdfStatement Of Community Involvement19 Dec 2024View
Transport Statement.pdfTransport Statement19 Dec 2024View
BESS Fire and Plume Modelling.pdfBess Fire And Plume Modelling19 Dec 2024View
Economic Impact Assessment.pdfEconomic Impact Assessment19 Dec 2024View
Design and Access Statement.pdfDesign And Access Statement19 Dec 2024View
Flood Risk Assessment.pdfFlood Risk Assessment1 Jul 2025View
67851_01 - NatPower - Planning Statement - December 2024(33254159.1).pdfPlanning Statement19 Dec 2024View
67851_01 NatPower - Application Covering Letter - December 2024(33256826.1).pdfApplication Covering Letter December 2024(33256826.1)19 Dec 2024View
Ecological Impact Assessment.pdfEcological Impact Assessment19 Dec 2024View
Statutory_Biodiversity_Metric_Calculation_Tool__NatPower UK.xlsxStatutory Biodiversity Metric Calculation Tool Natpower Uk19 Dec 2024View
Phase 2 Environmental Site Assessment.pdfPhase 2 Environmental Site Assessment19 Dec 2024View
JN2967-Rep-0003.2 Response to NH Comments.pdfTransport Note: Response to National Highways Comments4 Mar 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Start

    Published milestoneCouncil source
  4. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Date

    Published milestoneCouncil source

Decision & conditions

WITHDRAWN
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.