Council planning record

Demolition of existing industrial outbuilding, construction of 4 industrial commercial units and an Incubator Building within the Wilton Centre grounds

Wilton Centre Wilton Site Lazenby Redcar And Cleveland

ApprovedReference: R/2024/0071/FFMRedcar and Cleveland Borough Council

Last published check: 20 Sept 2026, 23:19. Check the council record for more recent changes.

Application location

Wilton Centre Wilton Site Lazenby Redcar And Cleveland

This record has no verified map location.

Application summary

Status
Approved
Application type
Major Application
Received
5 Dec 2023
Validated
28 Feb 2024
Determination deadline
Not published
Local authority
Redcar and Cleveland Borough Council

Application overview

Demolition of existing industrial outbuilding, construction of 4 industrial commercial units and an Incubator Building within the Wilton Centre grounds

Proposal details

Reference
R/2024/0071/FFM
Agent
Logic Architecture

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 62 of 62

DocumentPublishedAction
ApplicationFormRedacted.pdfApplication Form31 Jan 2024View
Consultee Response Natural heritage manager.pdfConsultee Response - Natural Heritage Manager1 Mar 2024View
1400020386.pdfConsultee response - Northern Gas Networks1 Mar 2024View
HSE LUP team response to RCBC - R-2024-0071-FFM - 6 March 2024.pdfConsultee response - Health and Safety Executive6 Mar 2024View
Northumbrian Water.pdfConsultee response - Northumbrian Water13 Mar 2024View
0071 Land Contam.pdfConsultee response - Environmental Protection (Contaminated Land)14 Mar 2024View
0071 Nuisance.pdfConsultee response - Environmental Protection (Nuisance)14 Mar 2024View
Cleveland Police.pdfConsultee response - Cleveland Police14 Mar 2024View
R-2024-0071-FFM Wilton International.pdfConsultee response - Strategic Planning (Policy)20 Mar 2024View
2024 03 21 4IndUnitsWilton RecNonDet.pdfConsultee response - National Highways (1)21 Mar 2024View
2024 06 20 4IndUnitsWilton RecNonDet.pdfConsultee response - National Highways (2)20 Jun 2024View
Highways.pdfConsultee response - Engineering Team (Highways) (1)16 Sept 2024View
2024 09 20 IndUnitsWilton REC NON DET.pdfConsultee Response - National highways (3)11 Oct 2024View
2024 12 16 IndUnitsWilton REC NON DET.pdfConsultee response - National Highways (4)16 Dec 2024View
Active Travel.pdfConsultee response - Active Travel9 Jan 2025View
Consultee Response - Engineers.pdfConsultee response - Engineering Team (Highways) (2)13 Mar 2025View
2025 03 17 Wilton4Units NO OBJ.pdfConsultee response - National Highways (5)17 Mar 2025View
Decision Notice 0071.pdfDecision Notice21 Mar 2025View
LocationPlan.pdfLocation Plan31 Jan 2024View
JN2608-Rep-0002.2 ALL Framework Travel Plan.pdfTravel Plan31 Jan 2024View
2215-LAL-03-ZZ-DR-A-00-500 Proposed 5 to 8 Industrial Unit Plans_P2.pdfProposed 5 To 8 Industrial Unit Plans P231 Jan 2024View
2215-LAL-04-XX-DR-A-00-601 Proposed 9 to 15 Industrial Unit Elevations_P2.pdfProposed 9 To 15 Industrial Unit Elevations P231 Jan 2024View
2215-LAL-04-ZZ-DR-A-00-600 Proposed 9 to 15 Industrial Unit Plans_P2.pdfProposed 9 To 15 Industrial Unit Plans P231 Jan 2024View
2215-LAL-05-ZZ-DR-A-08-01 Proposed Incubator Elevations_P3.pdfProposed Incubator Elevations P331 Jan 2024View
2215-LAL-05-ZZ-DR-A-21-01 Proposed Incubator Floor Plans_P5.pdfProposed Incubator Floor Plans P531 Jan 2024View
2215-LAL-05-ZZ-DR-A-21-03 Proposed Roof Plan_P1.pdfProposed Roof Plan P131 Jan 2024View
2215-LAL-XX-XX-DR-A-00-101 Existing Site Plan_P1.pdfExisting Site Plan P131 Jan 2024View
2215-LAL-XX-XX-DR-A-00-102 Existing Demolition Site Plan_P1.pdfExisting Demolition Site Plan P131 Jan 2024View
2215-LAL-XX-XX-DR-A-00-200 Proposed Site Plan P5.pdfProposed Site Plan P531 Jan 2024View
2215-LAL-XX-XX-DR-A-00-201 Proposed External Works_P2.pdfProposed External Works P231 Jan 2024View
2215-LAL-XX-XX-DR-A-00-202 Proposed External Refuse Store_P2.pdfProposed External Refuse Store P231 Jan 2024View
2215-LAL-XX-XX-DR-A-00-203 Proposed Boundary Treatment_P2.pdfProposed Boundary Treatment P231 Jan 2024View
2215-LAL-XX-XX-DR-A-00-204 Proposed Cycle Storage P2.pdfProposed Cycle Storage P231 Jan 2024View
2215-LAL-XX-XX-DR-A-00-205 Proposed Site Roof Plan_P2.pdfProposed Site Roof Plan P231 Jan 2024View
2215-LAL-XX-ZZ-DR-A-00-500 Proposed Incubator NIA Floor Plans and Schedule_P1.pdfProposed Incubator Nia Floor Plans And Schedule P131 Jan 2024View
2215-LAL-XX-ZZ-DR-A-00-501 Proposed Incubator GIA Floor Plans and Schedule_P1.pdfProposed Incubator Gia Floor Plans And Schedule P131 Jan 2024View
2215-LAL-XX-ZZ-DR-A-00-700 Proposed Units 1 to 4 Typical Sections_P1.pdfProposed Units 1 To 4 Typical Sections P131 Jan 2024View
2215-LAL-XX-ZZ-DR-A-00-701 Proposed Units 5 to 15 Typical Sections_P1.pdfProposed Units 5 To 15 Typical Sections P131 Jan 2024View
2215-LAL-XX-ZZ-DR-A-00-900 Proposed Street Elevations_P1.pdfProposed Street Elevations P131 Jan 2024View
2215-XX-XX-XX-DR-A-00-800 Brick Sub-station with Landlords LV Switchroom.pdfBrick Sub Station With Landlords Lv Switchroom31 Jan 2024View
ASS 3349.01 Wilton Centre Freeport Project 3349.01 A0.pdfTopographic Survey Plan 131 Jan 2024View
ASS 3349.02 Wilton Centre Freeport Project 3349.02 A0.pdfTopographic Survy Plan 231 Jan 2024View
2215-LAL-01-XX-DR-A-00-301 Proposed 1 to 2 Industrial Unit Elevations_P2.pdfProposed 1 To 2 Industrial Unit Elevations P231 Jan 2024View
2215-LAL-01-ZZ-DR-A-00-300 Proposed 1 to 2 Industrial Unit Plans_P2.pdfProposed 1 To 2 Industrial Unit Plans P231 Jan 2024View
2215-LAL-02-XX-DR-A-00-401 Proposed 3 to 4 Industrial Unit Elevations_P2.pdfProposed 3 To 4 Industrial Unit Elevations P231 Jan 2024View
2215-LAL-02-ZZ-DR-A-00-400 Proposed 3 to 4 Industrial Unit Plans_P2.pdfProposed 3 To 4 Industrial Unit Plans P231 Jan 2024View
2215-LAL-03-XX-DR-A-00-501 Proposed 5 to 8 Industrial Unit Elevations_P2.pdfProposed 5 To 8 Industrial Unit Elevations P231 Jan 2024View
2022047 Flood Risk and Impact Assessment REV O.pdfFlood Risk And Impact Assessment31 Jan 2024View
E2122-02-KJT-ZZ-XX-RP-ME-0001-MEP STAGE 2 REPORT-S4-P02 Final.pdfEngineering Services Report - Incubator Building31 Jan 2024View
JN2608-Rep-0001.2 ALL Transport Assessment.pdfTransport Assessment31 Jan 2024View
Wilton Centre Biodiversity Net Gain Statement R1 Final.pdfBiodiversity Net Gain Statement R1 Final31 Jan 2024View
Wilton Centre Landscape and Ecological Management Plan R1 Final.pdfLandscape And Ecological Management Plan R1 Final31 Jan 2024View
Wilton Site Preliminary Ecological Appraisal R1 Final.pdfPreliminary Ecological Appraisal R1 Final31 Jan 2024View
2022047-001 Wilton Centre Stage 2 Report.pdfDesk Top Study Land Contamination31 Jan 2024View
E2122-01-KJT-ZZ-XX-RP-ME-0001-MEP 2 REPORT-S4-P01.pdfEngineering Services Report - Industrial Buildings31 Jan 2024View
2215_The Wilton Centre Freeport_Planning Statement[64].pdfPlanning Statement28 Feb 2024View
Wilton DAS _compressed.pdfDesign and Access Statement including Energy Statement and Statement of Community Involvement28 Feb 2024View
E2122-02-KJT-ZZ-XX-RP-ME-0002-LZCT Feasibility Study-S2-P02.pdfFeasibility Study S2 P026 Mar 2024View
JN2608-Rep-0003.3 ALL Framework Travel Plan.pdfFramework Travel Plan7 Nov 2024View
JN2608-Rep-0004.1 ALL Transport Assessment Addendum.pdfTransport Assessment Addendum7 Nov 2024View
JN2608-Rep-0005.1 ALL Transport Addendum.pdfTransport Addendum7 Nov 2024View
Planning_Wilton_STDC_jgb170225.pdfSTDC Letter Wilton - proposed trips17 Feb 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Start

    Published milestoneCouncil source
  4. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Date

    Published milestoneCouncil source

Decision & conditions

GRANT PLANNING PERMISSION
Decision Notice 0071.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.