Council planning record

PLASTICS RECYCLING FACILITY

WES BUILDING BIFFA POLYMERS WILTON SITE LAZENBY

ApprovedReference: R/2022/0290/FFMRedcar and Cleveland Borough Council

Last published check: 21 Sept 2026, 22:39. Check the council record for more recent changes.

Application location

WES BUILDING BIFFA POLYMERS WILTON SITE LAZENBY

This record has no verified map location.

Application summary

Status
Approved
Application type
Major Application
Received
28 Mar 2022
Validated
5 Apr 2022
Determination deadline
Not published
Local authority
Redcar and Cleveland Borough Council

Application overview

PLASTICS RECYCLING FACILITY

Proposal details

Reference
R/2022/0290/FFM
Agent
BIFFA WASTE SERVICES LIMITED

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 43 of 43

DocumentPublishedAction
ApplicationFormRedacted.pdfApplication Form28 Mar 2022View
R-2022-0290-FFM Response Letter.pdfConsultee response - Northumbrian Water13 Apr 2022View
EA_R20220290FFM_OFFICIAL_140422.pdfConsultee response - Environment Agency19 Apr 2022View
MGE04746 Cont Land.pdfConsultee response - Environmental Protection (Contaminated Land)22 Apr 2022View
EP NU.pdfConsultee response - Environmental Protection (Nuisance)25 Apr 2022View
POLICE 0290.pdfConsultee response - Cleveland Police26 Apr 2022View
HSL-220429091417-321-FinalOutcome.pdfConsultee response - Health & Safety Executive29 Apr 2022View
LLFA.pdfConsultee response - Engineers (Local Lead Flood Authority)17 May 2022View
MGE04779 Cont Land.pdfConsultee response - Environmental Protection (Contaminated Land) (2)24 May 2022View
Highways 0290.pdfConsultee response - Engineering Team (Highways)25 May 2022View
llfa 290.pdfConsultee response - Engineers (Local Lead Flood Authority)14 Jun 2022View
R-2022-0290-FFM Response Letter (Updated 01072022).pdfConsultee response - Northumbrian Water (2)1 Jul 2022View
Consultee Response - LLFA.pdfConsultee response - Engineers (Local Lead Flood Authority) (2)1 Jul 2022View
Decision Notice.pdfDecision Notice5 Jul 2022View
Location Plan RC030100.pdfLocation Plan28 Mar 2022View
Officer report.pdfOfficer Report5 Jul 2022View
00035_DOC__BIR_01_B FRA Report FINAL.pdfFlood Risk Assessment and Drainage Strategy SUPERSEDED5 Apr 2022View
Drainage Drawing 21793-C-1000.pdfDrainage Drawing28 Mar 2022View
Chiller Elevations RC030900.pdfChiller Elevations28 Mar 2022View
Compressor Housing Elevations RC030700.pdfCompressor Housing Elevations28 Mar 2022View
Existing Site Plan RC030200.pdfExisting Site Plan28 Mar 2022View
Lighting Column Details RC031100.pdfLighting Column Details28 Mar 2022View
Lighting Plan RC031000.pdfLighting Plan28 Mar 2022View
Proposed Building Elevations RC030500.pdfBuilding Elevations28 Mar 2022View
Proposed Building Plan and Section RC030400.pdfBuilding Plan and Section28 Mar 2022View
Proposed Site Plan RC030300.pdfProposed Site Plan28 Mar 2022View
Pump House and Water Tank Elevations RC031200.pdfPump House and Water Tank Elevations28 Mar 2022View
Storage Bay Elevations RC030800.pdfStorage Bay Elevations28 Mar 2022View
Transformer Elevations RC030600.pdfTransformer Elevations28 Mar 2022View
gas tank.pdfGas Tank Plans and Elevations28 Mar 2022View
gatehouse.PDFGatehouse Plans and Elevations28 Mar 2022View
21793-C-1000.pdfDrainage Drawing Amended 05.07.20225 Jul 2022View
Biffa Polymers, Redcar-Attenuation Tank Details.pdfProposed Attenuation Tank Details5 Jul 2022View
21793-C-1200.pdfDrainage Section5 Jul 2022View
Noise Assessment.pdfNoise Assessment28 Mar 2022View
Planning Statement Redcar PRF 18.03.22.pdfPlanning Statement28 Mar 2022View
Baseline Site Report_SES BWSL_Wilton _Final_Feb22 Sembcorp.pdfSite Condition Report28 Mar 2022View
DAS Redcar PRF 18.03.22.doc.pdfDesign and Access Statement28 Mar 2022View
GeniePoint.pdfGeniepoint Electric Vehicle Charging Details28 Mar 2022View
Klargester details 017900-01 (BABAx BB NB BioDisc Installation Manual).pdfKlargester Biodisc Installation Manual28 Mar 2022View
Klargester details DS1146P-05 (BA-BB BAx Biodisc Gravity Sales Drawing).pdfKlargester Details28 Mar 2022View
Biffa Redcar Remediation Strategy.pdfRemediation Strategy17 May 2022View
00035_DOC__BIR_01_D FRA Report FINAL.pdfFlood Risk Assessment and Drainage Strategy Amended 23.05.202223 May 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Start

    Published milestoneCouncil source
  4. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Date

    Published milestoneCouncil source

Decision & conditions

GRANT PLANNING PERMISSION
Decision Notice.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.