Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
LAND ALONG THE DOGGER BANK C AND SOFIA OFFSHORE WIND FARMS CABLE CORRIDOR BETWEEN LANDFALL NEAR MARSKE BY THE SEA AND LACKENBY NATIONAL GRID SUBSTATION
Last published check: 22 Sept 2026, 02:07. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
SUBMISSION OF DETAILS FOR REQUIREMENT 25 (SURFACE AND FOUL WATER DRAINAGE) STAGE 5 PART 2 FOR TWO OFFSHORE WIND TURBINE GENERATING STATIONS AND ASSOCIATED INFRASTRUCTURE IN THE DOGGER BANK ZONE AND THE BOROUGH OF REDCAR AND CLEVELAND. THE FULL DESCRIPTION OF THE AUTHORISED DEVELOPMENT IS SPECIFIED I...
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsLAND ALONG THE DOGGER BANK C AND SOFIA OFFSHORE WIND FARMS CABLE CORRIDOR BETWEEN LANDFALL NEAR MARSKE BY THE SEA AND LACKENBY NATIONAL GRID SUBSTATION
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| CL_DBC and Sofia _ Rq 25 Stage 5 Part 2_V1-1_KM_02122021.pdfCovering Letter | 6 Dec 2021 | View |
| ApplicationFormRedacted.pdfApplication Form | 6 Dec 2021 | View |
| PlanningProposal.pdfConsultee response - Environment Agency | 9 Dec 2021 | View |
| LLFA 1037.pdfConsultee response - Engineers (Local Lead Flood Authority) | 15 Dec 2021 | View |
| R 2021 1037 CD NWL.pdfConsultee response - Northumbrian Water | 20 Dec 2021 | View |
| Consultee response - Highways.pdfConsultee response - Engineering Team (Highways) | 19 Jan 2022 | View |
| Compliance Decision Notice_R20211037CD.pdfCompliance Decision Notice R20211037cd | 31 Jan 2022 | View |
| Drainage Stage 5 Part 2 FINAL.pdfRequirement 25 - Foul and Surface Water Drainage Scheme | 6 Dec 2021 | View |
| Drainage appendix 2.1 - Cable Preparation Works Part 2.pdfRequirement 25 - Drainage Appendix 2.1 Cable Preparation Works Part 2 | 6 Dec 2021 | View |
| Drainage appendix 2.2 - Cable Preparation Works Part 2.pdfRequirement 25 - Drainage Appendix 2.2 Cable Preparation Works Part 2 | 6 Dec 2021 | View |
| Drainage appendix 1.1 - Cable Preparation Work Part 2.pdfRequirement 25 - Drainage Appendix 1.1 Cable Preparation Work Part 2 | 6 Dec 2021 | View |
| Drainage appendix 1.2 - Cable_Preparation_Works_Part2.pdfRequirement 25 - Drainage Appendix 1.2 Cable Preparation Works Part2 | 6 Dec 2021 | View |
| Drainage appendix 1.3 - Cable Preparation Works Part 2.pdfRequirement 25 - Drainage Appendix 1.3 Cable Preparation Works Part 2 | 6 Dec 2021 | View |
| Compliance Officer Report 1037.pdfOfficer Report | 27 Jan 2022 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.