Council planning record

PARTIAL DISCHARGE OF CONDITIONS 3; 4; 5; 6; 8; 9; 14; 15; 16; 18; 19; 20; 21; 22; 25; 31 & 32 OF PLANNING PERMISSION R/2014/0627/FFM FOR THE WINNING AND WORKING OF POLYHALITE BY UNDERGROUND METHODS INCLUDING THE CONSTRUCTION OF A MINEHEAD AT DOVE'S NEST FARM INVOLVING ACCESS, MAINTENANCE AND VENTILA...

PHASE 7 WORKS LOCKWOOD BECK

ApprovedReference: R/2019/0499/CDRedcar and Cleveland Borough Council

Last published check: 29 Sept 2026, 01:32. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Weekly List Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source

Application summary

Status
Approved
Application type
Condition Discharge
Received
2 Aug 2019
Validated
2 Aug 2019
Determination deadline
Not published
Local authority
Redcar and Cleveland Borough Council

Application overview

PARTIAL DISCHARGE OF CONDITIONS 3; 4; 5; 6; 8; 9; 14; 15; 16; 18; 19; 20; 21; 22; 25; 31 & 32 OF PLANNING PERMISSION R/2014/0627/FFM FOR THE WINNING AND WORKING OF POLYHALITE BY UNDERGROUND METHODS INCLUDING THE CONSTRUCTION OF A MINEHEAD AT DOVE'S NEST FARM INVOLVING ACCESS, MAINTENANCE AND VENTILA...

Proposal details

Reference
R/2019/0499/CD
Agent
LICHFIELDS

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

PHASE 7 WORKS LOCKWOOD BECK

This record has no verified map location.

Documents 22 of 22

DocumentPublishedAction
ApplicationFormNoPersonalData.pdfApplication Form2 Aug 2019View
MGE03878 Cont Land.pdfConsultee response - Environmental Protection (Contaminated Land)9 Aug 2019View
MGE03879 Nuisance.pdfConsultee response - Environmental Protection (Nuisance)9 Aug 2019View
Memo Style NHM 499.pdfConsultee response - Natural Heritage Manager13 Aug 2019View
PO.pdfConsultee response - Planning Officer13 Aug 2019View
PlanningProposal.pdfConsultee response - Environment Agency19 Aug 2019View
Consultee Response - Engineering.pdfConsultee response - Engineering Team (Highways)20 Aug 2019View
Consultee Response - LLFA.pdfConsultee response - Engineers (Local Lead Flood Authority)9 Sept 2019View
Compliance Decision Notice_R20190499CD(1).pdfCompliance Decision Notice11 Sept 2019View
40-ARI-LB-7100-CI-18-01017 Lockwood Beck Phase 7 Hard and Soft Landscaping Plan Rev 0.pdfCondition No. 06 - Hard & Soft Landscaping2 Aug 2019View
40-FWS-LB-70-WM-PL-0012 Lockwood Beck Phase 7 Ground and Surface Water Monitoring Scheme Rev 1.pdfCondition No. 21; 22 - Ground & Surface Water Monitoring Scheme2 Aug 2019View
40-FWS-LB-70-WM-PL-0013 Lockwood Beck Phase 7 Remedial Action Plan Rev 1.pdfCondition No. 22 - Remedial Action Plan2 Aug 2019View
40-FWS-LB-70-WM-PL-0014 Lockwood Beck Phase 7 Groundwater Management Scheme Rev 2.pdfCondition No. 31 - Ground Water Mangement Scheme2 Aug 2019View
40-FWS-LB-70-WM-RA-0007 Lockwood Beck Phase 7 Hydrogeological Risk Assessment Rev 2.pdfCondition No. 20 - Hydrogeological Risk Assessment2 Aug 2019View
40-RHD-LB-70-CI-PL-0010 Lockwood Beck Phase 7 Construction Environmental Management Plan Rev 0.pdfCondition No. 03; 09; 14; 18; 19 - CEMP2 Aug 2019View
64406 Plans and Elevations for Grout Shed Rev 3.pdfCondition No. 15 - External Materials Grout Shed2 Aug 2019View
Meka 100 Concrete Batch Plant Layout Rev R0.pdfPhase 7 - Concrete Batach Plant Layout and Elevations2 Aug 2019View
40-ARI-LB-7100-CI-18-01015 Lockwood Beck Phase 7 General Arrangement Rev 0.pdfPhase 7 - General Arrangement Plan2 Aug 2019View
40-ARI-LB-7100-CI-18-01018 Lockwood Beck Phase 7 Surface Water Drainage Rev 0.pdfCondition No. 15 - External Materials Grout Shed2 Aug 2019View
50303_04_RCBCPhase7Lockwood_01_08_19.pdfCovering letter2 Aug 2019View
40-DMC-LB-7219-ST-15-00001 Compressor Canopy Structural Steel Plans Elevations and Details Rev 0.pdfPhase 7 - Compressor Canopy Structural Steel Plans and Elevations2 Aug 2019View
40-ARI-LB-7100-CI-18-01016 Lockwood Beck Phase 7 Planning Phases Comparison General Arrangement Rev 0.pdfCondition No. 08 - Planning Phases Comparison General Arrangement2 Aug 2019View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

CONDITION DISCHARGE GRANTED
Compliance Decision Notice_R20190499CD(1).pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.