Council planning record

INSTALLATION OF WATER AND SEWAGE PIPELINES FROM TEESREP POWER STATION (UNDER CONSTRUCTION) TO NORTHUMBRIAN WATER CONNECTION POINTS

LAND AT TEESREP BIOMASS POWER STATION TEES DOCK ROAD GRANGETOWN

ApprovedReference: R/2017/0310/FFRedcar and Cleveland Borough Council

Last published check: 30 Sept 2026, 01:41. Check the council record for more recent changes.

Application location

LAND AT TEESREP BIOMASS POWER STATION TEES DOCK ROAD GRANGETOWN

This record has no verified map location.

Application summary

Status
Approved
Application type
Full
Received
10 May 2017
Validated
10 May 2017
Determination deadline
Not published
Local authority
Redcar and Cleveland Borough Council

Application overview

INSTALLATION OF WATER AND SEWAGE PIPELINES FROM TEESREP POWER STATION (UNDER CONSTRUCTION) TO NORTHUMBRIAN WATER CONNECTION POINTS

Proposal details

Reference
R/2017/0310/FF
Agent
MGT TEESSIDE LIMITED

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 16 of 16

DocumentPublishedAction
ApplicationFormNoPersonalData.pdfApplication Form10 May 2017View
R 2017 0310 FF.pdfConsultee response - Northumbrian Water19 May 2017View
MGE02747 Nuisance.pdfConsultee response - Environmental Protection (Nuisance)24 May 2017View
MGE02757.pdfConsultee response - Environmental Protection (Contaminated Land)2 Jun 2017View
2017-0310 land at Biomass power station Tees Dock Rd HO.pdfConsultee response - Development Engineers2 Jun 2017View
Decision Notice_R20170310FF.pdfDecision Notice23 Jun 2017View
TeesREP_Application for planning permission for WaterSew pipes submitted 09.05.17_(redline plan_REV03).pdfLocation Plan10 May 2017View
TeesREP_Application for planning permission for WaterSew pipes submitted 09.05.17_(Route of cable_OCU-TEE-ROU-01-rev1).pdfSite Route Plan10 May 2017View
TeesREP_Application for planning permission for WaterSew pipes submitted 09.05.17_(Site plan_REV03)(1).pdfSite Plan10 May 2017View
TeesREP_Application for planning permission for WaterSew pipes submitted 09.05.17_(Cross section_ OCU-TEE-CRO-01).pdfCross Section AA Carriageway10 May 2017View
TeesREP_Application for planning permission for WaterSew pipes submitted 09.05.17_(Cross section_OCU-TEE-CRO-02).pdfCross Section BB Carriageway10 May 2017View
TeesREP_Application for planning permission for WaterSew pipes submitted 09.05.17_(Data Sheet - 200mm OD PVC Conductive Duct (Class1).pdfPVC Conductive Duct Details10 May 2017View
TeesReP_Application for planning permission for WaterSew pipes submitted 09.05.17_(Protectaline).pdfBarrier Pipe and Fitting Systems Details10 May 2017View
TeesREP_Application for Planning Permission for WaterSew Pipes submitted 09.0517_(Response from NWL).docxNorthumbrian Water Letter (1)10 May 2017View
TeesREP_Application for planning permission submitted 09.05.17_(Q108600 - NW letter 25.04.2017).pdfNorthumbrian Water Letter (2)10 May 2017View
TeesREP_Application for Planning permission for WaterSew pipes submitted 09.05.17_(Design and Access Statement)(1).pdfDesign and Access Statement10 May 2017View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Start

    Published milestoneCouncil source
  4. Weekly List Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Date

    Published milestoneCouncil source

Decision & conditions

GRANT PLANNING PERMISSION
Decision Notice_R20170310FF.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.