Council planning record

ERECTION OF SINGLE WIND TURBINE (MAXIMUM HEIGHT 80M) AND ASSOCIATED INFRASTRUCTURE INCLUDING ACCESS TRACKS, HARDSTANDINGS, CONTROL BUILDING AND CABLING

LAND WEST OF KIRKLEATHAM BUSINESS PARK KIRKLEATHAM REDCAR

ApprovedReference: R/2013/0209/FFRedcar and Cleveland Borough Council

Last published check: 2 Oct 2026, 09:23. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Start

    Published milestoneCouncil source
  4. Weekly List Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Committee Date

    Published milestoneCouncil source
  7. Decision Date

    Published milestoneCouncil source

Application summary

Status
Approved
Application type
Full
Received
19 Mar 2013
Validated
19 Mar 2013
Determination deadline
Not published
Local authority
Redcar and Cleveland Borough Council

Application overview

ERECTION OF SINGLE WIND TURBINE (MAXIMUM HEIGHT 80M) AND ASSOCIATED INFRASTRUCTURE INCLUDING ACCESS TRACKS, HARDSTANDINGS, CONTROL BUILDING AND CABLING

Proposal details

Reference
R/2013/0209/FF
Agent
STRATUS ENVIRONMENTAL LTD

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

LAND WEST OF KIRKLEATHAM BUSINESS PARK KIRKLEATHAM REDCAR

This record has no verified map location.

Documents 48 of 48

DocumentPublishedAction
Application Form.pdfApplication Form19 Mar 2013View
Decision Notice_R20130209FF.pdfDecision Notice7 Jun 2013View
Officer report _R20130209FF_1_.pdfOfficer Report (PDF)28 May 2013View
Figure 2.1_Site Context_A3.pdfFigure 2.1 Site Context19 Mar 2013View
Figure 2.2_Site Boundary_A3.pdfFigure 2.2 Site Boundary19 Mar 2013View
Figure 2.3_Site Layout_A2.pdfFigure 2.3 Site Layout19 Mar 2013View
Figure 2.4_Typical Wind Turbine_A3.pdfFigure 2.4 Typical Wind Turbine19 Mar 2013View
Figure 2.6 Typical Internal Access Track Construction Details_A3.pdfFigure 2.6 Typical Internal Access19 Mar 2013View
Figure 2.7 Typical Control Building_A3.pdfFigure 2.7 Typical Control Building19 Mar 2013View
Figure 2.8_Indicative Access Route_A3.pdfFigure 2.8 Indicative Access Route19 Mar 2013View
Figure 6.2_Detailed Study Area_A3.pdfFigure 6.2 Detailed Study Area19 Mar 2013View
Figure 6.1_Wider Study Area_A3.pdfFigure 6.1 Wider Study Area19 Mar 2013View
Figure 6.6_National Character Areas _A3.pdfFigure 6.6 National Character Area19 Mar 2013View
Figure 6.5_Planning & Statutory Landscape Designations_A3.pdfFigure 6.5 Planning and Statutory landscaping19 Mar 2013View
Figure 6.4_VP Location Plan_A3.pdfFigure 6.4 Location Plan19 Mar 2013View
Figure 6.3_ZTV_A3.pdfFigure 6.3 Theoretical Visibility Zone19 Mar 2013View
Figure 6.7_Local Character Areas _A3.pdfFigure 6.7 Local Character Areas19 Mar 2013View
Figure 6.9_Cumulative Wind Development Locations_A3.pdfFigure 6.9 Cumulative Wind Development Applications19 Mar 2013View
Figure 7.3.pdfFigure 7.319 Mar 2013View
Figure 7.2.pdfFigure 7.219 Mar 2013View
Figure 6.10_CZTV_A3.pdfFigure 6.10 Theoretical Visibility Zone19 Mar 2013View
Figure 6.8_Residential Amenity Plan_A3.pdfFigure 6.8 Residential Amenity Plan19 Mar 2013View
Figure 7.1.pdfFigure 7.119 Mar 2013View
Figure 7.5.pdfFigure 7.519 Mar 2013View
Figure 7.4.pdfFigure 7.419 Mar 2013View
Figure 7.6.pdfFigure 7.619 Mar 2013View
Figure 7.8.pdfFigure 7.819 Mar 2013View
Figure 7.7.pdfFigure 7.719 Mar 2013View
Appendix 6.2 LVIA LCAs.pdfLVIA LCAs19 Mar 2013View
Appendix 6.1 LVIA Proformas.pdfLVIA Proformas19 Mar 2013View
Environmental Report.pdfEnvironmental Report19 Mar 2013View
Design and Access Statement.pdfDesign and Access Statement19 Mar 2013View
Ornithological Assesment.pdfOrnithological Assessment19 Mar 2013View
Noise Assessment.pdfNoise Impact Assessment19 Mar 2013View
Ecological Appraisal.pdfEcological Appraisal19 Mar 2013View
Flood Risk Maps.pdfFlood Risk Assessment19 Mar 2013View
Planning Statement.pdfPlanning Statement19 Mar 2013View
Statement of Community Involvement.pdfStatement of Community Involvement19 Mar 2013View
Heritage Assessment.pdfHeritage Assessment19 Mar 2013View
Appendix 11.1 Telecom Responses.pdfAppendix 11.1 Telecom Responses19 Mar 2013View
Figure 9.4 Shadow Flicker Graphs 3 of 5_A3.pdfFigure 9.4 Shadow Flicker19 Mar 2013View
Figure 9.3 Shadow Flicker Graphs 2 of 5_A3.pdfFigure 9.3 Shadow Flicker19 Mar 2013View
Figure 9.2 Shadow Flicker Graphs 1 of 5_A3.pdfFigure 9.2 Shadow Flicker19 Mar 2013View
Figure 9.1 Shadow Flicker_A3.pdfFigure 9.1 Shadow Flicker19 Mar 2013View
Figure 9.6 Shadow Flicker Graphs 5 of 5_A3.pdfFigure 9.6 Shadow Flicker19 Mar 2013View
Figure 9.5 Shadow Flicker Graphs 4 of 5_A3.pdfFigure 9.5 Shadow Flicker19 Mar 2013View
Figure 2.5 Typical Turbine Foundation Design and Construction_A3.pdfFigure 2.5 Typical Turbine Foundation19 Mar 2013View
Appendix 7.1 Access study.pdfAppendix 7.1 Access Study19 Mar 2013View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

GRANT PLANNING PERMISSION
Decision Notice_R20130209FF.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.