Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Wales · Local authority
Explore collected planning applications and decisions for Powys County Council. Search an address, application reference or proposal to find a record.
13,856 approved · 1,408 refused · 1,430 withdrawn. Received dates in our records: 4 Jul 2013 to 15 Oct 2026. Most recent record check: 19 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Welsh Government / DataMapWales. Contains public sector information licensed under the Open Government Licence v3.0.
Land At Grandstand Trefeglwys Caersws Powys SY17 5PU
Received 3 Mar 2020Barn At Ty Canol Tafolwern Llanbrynmair Powys SY19 7DS
Received 15 Apr 2020Lower Glynbrochan Llanidloes Powys SY18 6PL
Received 10 Oct 2019Clynderwen And Cardiganshire Farmers Ltd Maengwyn Street Machynlleth SY20 8EA
Received 20 Dec 2019Clynderwen And Cardiganshire Farmers Ltd Maengwyn Street Machynlleth SY20 8EA
Received 7 Nov 2019Cringoed Issa Blaen-y-cwm Llanwrthwl Llandrindod Wells Powys LD1 6NU
Received 12 Feb 20204 Heol Pentrerhedyn Machynlleth SY20 8DW
Received 24 Sept 2019Glyn Farm Van Llanidloes Powys SY18 6NE
Received 11 Oct 2019Birchfield Farm Nant Glas Llandrindod Wells LD1 6PD
Received 23 Apr 2020Birchfield Farm Nant Glas Llandrindod Wells LD1 6PD
Received 23 Apr 2020Belan Land Y Fan Llanidloes Powys SY18 6NL
Received 14 Dec 2019Land Adjacent To Presquile Bryn Du Road Llanidloes Powys SY18 6JH
Received 12 Feb 2020Dolfyr Farm Rhayader LD6 5NT
Received 16 Apr 2020Pantdrain Llangurig Llanidloes SY18 6SA
Received 17 Dec 2019Land Adjoining Cemetery Machynlleth Powys SY20 8HE
Received 16 Mar 2020Land At Grandstand Trefeglwys Caersws Powys SY17 5PU
Received 24 Feb 2020Land Between 14 And 15 Ffordd Mynydd Griffith Machynlleth SY20 8DD
Received 26 Nov 2019Land At Parc Derwen Fawr Llanidloes Powys
Received 11 Feb 2020The Old Saw Mills Short Bridge Street Llanidloes Powys SY18 6AD
Received 26 Sept 2019Land At Upper Dolau Nantmel Llandrindod Wells Powys
Received 24 Feb 2020Blaencwm Old House Llanbrynmair SY19 7EA
Received 9 Feb 2020Llwyncelyn Llangurig Llanidloes SY18 6SB
Received 11 Feb 2020Land Between and behind 14 And 15 ( Ffordd Mynydd Uchaf) Ffordd Mynydd Griffith Machynlleth Powys SY20 8DD
Received 30 Oct 2019Hope Cottage Llanfaredd Builth Wells Powys LD2 3TE
Received 3 Nov 2016Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Wales differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Powys County Council, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage