Council planning record

Two-storey infill extension to front service yard on the eastern side of the existing facility to create additional covered storage / processing space and amended vehicle loading bay (part-retrospective) (re-submission of 22/00433/FUL)

Unit K, Wallsend Industrial Estate Cattedown Road Plymouth PL4 0RW

DecidedReference: 23/01150/FULPlymouth City Council

Last published check: 1 Oct 2026, 16:02. Check the council record for more recent changes.

Application location

Unit K, Wallsend Industrial Estate Cattedown Road Plymouth PL4 0RW

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Full Application
Received
9 Aug 2023
Validated
23 Aug 2023
Determination deadline
18 Oct 2023
Local authority
Plymouth City Council

Application overview

Two-storey infill extension to front service yard on the eastern side of the existing facility to create additional covered storage / processing space and amended vehicle loading bay (part-retrospective) (re-submission of 22/00433/FUL)

Proposal details

Reference
23/01150/FUL
Ward
SUTTON AND MOUNT GOULD
Agent
ADG Architects-Design-Graphics

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 29 of 29

DocumentPublishedAction
OFFICER REPORTDecision Outcome · PDF29 Sept 2023View
FULL GRANT DECISION NOTICEDecision Outcome · PDF29 Sept 2023View
DRAINAGE PLANDrawings and Images · PDF21 Sept 2023View
LEAD LOCAL FLOOD AUTHORITYConsultee Comment · PDF14 Sept 2023View
PUBLIC PROTECTIONConsultee Comment · PDF11 Sept 2023View
NATURAL INFRASTRUCTUREConsultee Comment · PDF6 Sept 2023View
HIGHWAY AUTHORITYConsultee Comment · PDF1 Sept 2023View
CLIMATE EMERGENCY COMPLIANCE FORMApplication · PDF23 Aug 2023View
SITE NOTICE GENERALDecision Outcome · PDF23 Aug 2023View
PADHIConsultee Comment · PDF23 Aug 2023View
APPLICATION FORM REDACTEDApplication · PDF9 Aug 2023View
PHASE 1: CONTAMINATED LAND & GEOTECHNICAL DESK STUDY REPORT 1Supporting Information · PDF9 Aug 2023View
PHASE 1: CONTAMINATED LAND & GEOTECHNICAL DESK STUDY REPORT 2Supporting Information · PDF9 Aug 2023View
GROUND INVESTIGATION REPORTSupporting Information · PDF9 Aug 2023View
EXISTING ELEVATIONS - HI CAREDrawings and Images · PDF9 Aug 2023View
FIRST FLOOR AS EXISTING - HI CAREDrawings and Images · PDF9 Aug 2023View
EXISTING GROUND FLOOR PLAN AND SITE TOPO SURVEYDrawings and Images · PDF9 Aug 2023View
HI CARE - GROUND FLOOR PLAN AS PROPOSEDDrawings and Images · PDF9 Aug 2023View
HI CARE - ELEVATIONS AS PROPOSEDDrawings and Images · PDF9 Aug 2023View
HI CARE - ELEVATIONS AS PROPOSEDDrawings and Images · PDF9 Aug 2023View
HI CARE - FIRST FLOOR PLAN AS PROPOSEDDrawings and Images · PDF9 Aug 2023View
SITE PLAN AS PROPOSED - HI CARE (HGV TRACK PLOT - EXIT)Drawings and Images · PDF9 Aug 2023View
SITE PLAN AS PROPOSED - HI CARE (HGV TRACK PLOT - ENTRY)Drawings and Images · PDF9 Aug 2023View
SITE LOCATION PLAN HI CARE AND PACKAGING WORKSDrawings and Images · PDF9 Aug 2023View
BLOCK PLAN HI CARE AND PACKAGING WORKSDrawings and Images · PDF9 Aug 2023View
BUILDING ELEVATIONS - EAST - EXISTING AND PROPOSEDDrawings and Images · PDF9 Aug 2023View
DESIGN & ACCESS STATEMENTSupporting Information · PDF9 Aug 2023View
CONSTRUCTION PHASE PLANSupporting Information · PDF9 Aug 2023View
CIL FORMApplication · PDF9 Aug 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Decision Made Date

    Published milestoneCouncil source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Permission Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Grant Conditionally
OFFICER REPORT FULL GRANT DECISION NOTICE SITE NOTICE GENERAL
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.