Council planning record

Proposed change of use/redevelopment of the existing Bubbles Hand Car Wash site to provide an electric vehicle (EV) charging hub comprising the installation of 10 accessible EV charging bays, ancillary Infrastructure and associated infrastructure works including resurfacing of the existing hardstanding and perimeter landscaping.

Bubbles Car Wash Maskew Avenue New England Peterborough PE1 2AS

DeterminedReference: 26/002538/FULPeterborough City Council

Last published check: 30 Sept 2026, 08:04. Check the council record for more recent changes.

Application location

Bubbles Car Wash Maskew Avenue New England Peterborough PE1 2AS

This record has no verified map location.

Application summary

Status
Determined
Application type
Planning Application (Full)
Received
30 Jun 2026
Validated
Not published
Determination deadline
24 Aug 2026
Local authority
Peterborough City Council

Application overview

Proposed change of use/redevelopment of the existing Bubbles Hand Car Wash site to provide an electric vehicle (EV) charging hub comprising the installation of 10 accessible EV charging bays, ancillary Infrastructure and associated infrastructure works including resurfacing of the existing hardstanding and perimeter landscaping.

Proposal details

Reference
26/002538/FUL
Alternative references
PP-15021113
Development type
Change Of Use
Ward
North
UPRN
10090763043

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 28 of 28

DocumentPublishedAction
Application Form - RedactedDCAPFORM30 Jun 2026View
Site Location Plan - S4-P03DCPLANS30 Jun 2026View
Existing Site Plan - S4-P02DCPLANS30 Jun 2026View
Proposed Site Plan - S4-P07DCPLANS30 Jun 2026View
Proposed Demo Overlay Plan - S4-P05DCPLANS30 Jun 2026View
Proposed EV Plan - S4-P05DCPLANS30 Jun 2026View
Proposed Tracking Plan - S4-P05DCPLANS30 Jun 2026View
Existing Elevations Planning - S4-P01DCPLANS30 Jun 2026View
Proposed Elevations Planning - S4-P04DCPLANS30 Jun 2026View
Proposed Charger and Substation Details - S4-P02DCPLANS30 Jun 2026View
Landscape Plan - S4-P03DCPLANS30 Jun 2026View
Site Work Plan - S4-P02DCPLANS30 Jun 2026View
Topographical SurveyDCPLANS30 Jun 2026View
Power Cabinet (1)DCPLANS30 Jun 2026View
CCTVDCPLANS30 Jun 2026View
EV Charging VisualsDCPLANS30 Jun 2026View
Design and Access StatementDCSUPDOC30 Jun 2026View
Technical Note Biodiversity and Ecology (3)DCSUPDOC30 Jun 2026View
Arboricultural Survey, Impact Assessment and Method Statement - 3114.001.ENZ.XX.00.RP.AR.45.101 - PL04DCSUPDOC3 Jul 2026View
Archaeological Services - ConsultationDCCONWEB6 Jul 2026View
Arboricultural Survey Impact Assessment and Method StatementDCSUPDOC7 Jul 2026View
Comment - PollutionDCCONWEB9 Jul 2026View
Lead Local Flood AuthorityDCCONWEB13 Jul 2026View
Cambridgeshire ConstabularyDCCONWEB13 Jul 2026View
site notice photo 09.07.26DCSNPHOT9 Jul 2026View
Tree Officer - CommentsDCCONWEB21 Jul 2026View
76359_Decision_Notice_-_PERMIT.pdfDCDEC13 Aug 2026View
case officer reportDCCORPTP13 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Site notice date

    Published milestoneCouncil source
  5. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Dispatch date

    Published milestoneCouncil source
  9. Decision date

    Published milestoneCouncil source
  10. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permitted
76359_Decision_Notice_-_PERMIT.pdf
Planning conditions
  1. The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: In accordance with Section 91 of the Town and Country Planning Act 1990 (as amended).
  2. The development hereby permitted shall be carried out in accordance with the following approved plans: Site Location Plan (Drawing Number: 250090-CAD-S1-00-D-A-2101-S4-P03) Existing Site Plan (Drawing Number: 250090-CAD-S1-00-D-A-2102-S4-P02) Proposed Site Plan Planning (Drawing Number: 250090-CAD-S1-00-D-A-2202-S4-P07) Proposed Demo Overlay Plan (Drawing Number: 250090-CAD-S1-00-D-A-2203-S4-P05) Proposed EV Plan (Drawing Number: 250090-CAD-S1-00-D-A-2204-S4-P05) Proposed Tracking Plan (Drawing Number: 250090-CAD-S1-00-D-A-2205-S4-P05) Proposed Elevations Planning (Drawing Number: 250090-CAD-S1-00-D-A-2207-S4-P04) Proposed Charger and Substation Details (Drawing Number: 250090-CAD-S1-00-D-A-2208-S4-P02) Landscape Plan (Drawing Number: 250090-CAD-S1-00-D-A-2209-S4-P03) Site Work Plan (Drawing Number: 250090-CAD-S1-00-D-A-2210-S4-P02) Design and Access Statement (June 2026) Technical Note Biodiversity and Ecology (June 2026) Arboricultural Survey, Impact Assessment and Method Statement (Ref: 3114.001.ENZ.XX.00.RP.AR.45.101 PL04) Reason: For the avoidance of doubt and in the interest of proper planning
  3. The materials to be used in the construction of the external surfaces of the development; hereby permitted shall match those shown on drawing 'Proposed Elevations Planning 250090-CAD-S1-00-D-A-2207-S4-P04' and 'Proposed Charger and Substation Details 250090-CAD-S1-00-D-A-2208-S4-P02'. Reason: For the Local Planning Authority to ensure a satisfactory external appearance, in accordance with Policy LP16 of the Peterborough Local Plan (2019) and Chapter 12 of the National Planning Policy Framework (2024).
  4. The soft landscaping shall be carried out in accordance with the submitted drawing 'Landscape Plan 2209 Rev P03' and within the first available planting season following completion of the development or first occupation (whichever is the sooner) or alternatively in accordance with a timetable for landscape implementation which has been approved as part of the submitted landscape scheme. Development shall be carried out in accordance with the submitted details. Any trees, shrubs or hedges forming part of the approved landscaping scheme that die, are removed or become diseased within five years of the implementation of the landscaping scheme shall be replaced during the next available planting season by the developers, or their successors in title with an equivalent size, number and species to those being replaced. Any replacement trees, shrubs or hedgerows dying within five years of planting shall themselves be replaced with an equivalent size, number and species. Reason: In the interests of visual amenity of the area and the enhancement of biodiversity, in accordance with Policies LP16, LP28 and LP29 of the Peterborough Local Plan (2019) and Chapter 15 of the National Planning Policy Framework (2024).
  5. The approved hard landscaping scheme and boundary treatment shall be carried out in accordance with drawing 'Proposed Site Plan Planning 2202 Rev P07' and 'Proposed Elevations Planning 2207 Rev P04'and prior to first commencement of use and retained as such thereafter. Reason: In the interests of visual amenity of the area and the enhancement of biodiversity, in accordance with Policies LP16, LP28 and LP29 of the Peterborough Local Plan (2019) and Chapter 15 of the National Planning Policy Framework (2024).
  6. The development shall be carried out in accordance with the 'Arboricultural Survey, Impact Assessment and Method Statement' Ref: 3114.001.ENZ.XX.00.RP.AR.45.101 PL04, submitted in support of this application, with all fencing implemented before any equipment, machinery or materials are brought onto the site for the purposes of the development and shall be maintained until all equipment, machinery and surplus materials have been removed from the site. Nothing shall be stored or placed in any area fenced in accordance with this condition and the ground levels within those areas shall not be altered, nor shall any excavation be made, without the written consent of the Local Planning Authority. In this condition ''retained tree'' means an existing tree which is to be retained in accordance with the approved plans and particulars; and paragraphs (a) and (b) below shall have effect until the expiration of twelve months from the date of the occupation of the building for its permitted use. (a) No retained tree shall be cut down, uprooted or destroyed, nor shall any retained tree be topped or lopped other than in accordance with the approved plans and particulars, without the written approval of the Local Planning Authority. Any topping or lopping approved shall be carried out in accordance with British Standard 3998 (Tree Work); (b) If any retained tree is removed, uprooted or destroyed or dies, another tree shall be planted at the same place and that tree shall be of such size and species, and shall be planted at such time, as may be specified in writing by the Local Planning Authority; (c) The erection of fencing for the protection of any retained tree shall be undertaken in accordance with the approved plans and particulars before any equipment, machinery or materials are brought on to the site for the purposes of the development, and shall be maintained until all equipment, machinery and surplus materials have been removed from the site. Nothing shall be stored or placed in any area fenced in accordance with this condition and the ground levels within those areas shall not be altered, nor shall any excavation be made, without the written consent of the Local Planning Authority. Reason: In order to protect and safeguard the amenities of the area, in accordance with Policies LP16 and LP29 of the Peterborough Local Plan (2019).
  7. Prior to occupation or the commencement of the use, the parking and turning shall be provided to enable vehicles to enter, turn and leave the site in forward gear and park clear of the public highway. The area shall be delivered in accordance with drawing 250090-CAD-S1-00-D-A-2202-S4-P07 and thereafter retained for that specific use in perpetuity. Reason: In the interest of highway safety, in accordance with Policy LP13 of the Peterborough Local Plan (2019) and Paragraph 115 of the National Planning Policy Framework 2024.
  8. Highways Act 1980 - Section 148, Sub-Section C It is an offence to deposit anything including building materials or debris on a highway which may cause interruption to any user of the highway (including footways). In the event that a person is found guilty of this offence, a penalty may be imposed in the form of a fine. It is the responsibility of the developer and contractor(s) to ensure that no building materials or debris are placed on or remain within the highway during or after the construction period.
  9. Highways Act 1980 - Section 149 If anything is so deposited on a highway as to constitute a nuisance, the Local Planning Authority may by notice require the person who deposited it there to remove it forthwith and if he fails to comply the Local Planning Authority may make a complaint to a Magistrates Court for a Removal and Disposal Order under this Section. In the event that the deposit is considered to constitute a danger, the Local Planning Authority may remove the deposit forthwith and recover reasonable expenses from the person who made the deposit. It is the responsibility of the developer and contractor(s) to ensure that no building materials or debris are placed on or remain within the highway during or after the construction period.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.