C23 - Validation Report The remediation scheme shall be implemented in accordance with the approved timetable of works. Within 3 months of the completion of measures identified in the approved remediation scheme, a validation report (that demonstrates the effectiveness of the remediation carried out) must be submitted to the Local Planning Authority. Reason: To provide verification that the required remediation has been carried out to appropriate standards and in accordance with the National Planning Policy Framework, and Policies LP32 and LP33 of the Peterborough Local Plan (2019). Plans and documents submitted in support of the discharge of C23: - Northminster Verification 2 - STY7456R01 Rev_B Assessment: Having reviewed the submitted plan, the Officer agrees with the Council's Pollution Control Officer that the proposed details are acceptable and are in line with the Council's Local Plan policy LP32 and LP33. The verification report confirms that the remedial actions have been completed satisfactorily, and the site is suitable and safe for use, in terms of the risks from contaminated land. As such, the detail submitted is deemed acceptable for the Local Planning Authority to discharge the condition. Conclusion: The details submitted relating to condition 23 are deemed acceptable to the Local Planning Authority and comply with the submission requirements of the condition. Condition 23 is hereby discharged.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.