C10 No development shall take place until a detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment has been submitted to and approved in writing by the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, an appraisal of remedial options, and proposal of the preferred option(s), and a timetable of works and site management procedures. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation. The remediation scheme shall be implemented in accordance with the approved timetable of works. Within 3 months of the completion of measures identified in the approved remediation scheme, a validation report (that demonstrates the effectiveness of the remediation carried out) must be submitted to the Local Planning Authority. Reason: In order to ensure suitable ground conditions, in accordance with Policy LP33 of the Adopted Peterborough Local Plan (2019). Plans and documents submitted in support of the discharge of C10 part 2 (Validation Report): -Earthworks Validation Letter Assessment: Having reviewed the submitted information, the Officer agrees with the Council's Enviromental Health Officer that the submitted details as per the Earthworks Validation Letter demonstrates the effectiveness of the remediation carried out, so therefore the Local Planning Authority can discharge this condition. Conclusion: The details submitted relating to condition 10 are deemed acceptable to the Local Planning Authority and comply with the submission requirements of the condition. Condition 10 is hereby discharged.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.