Council planning record

Demolition of existing garages and replace with permeable block paving parking spaces, enclosed with new fencing to boundaries with neighbouring homes

Garage site adjacent to 45, Bluebell Avenue, Peterborough, PE1 3XQ

DeterminedReference: 26/002197/FULPeterborough City Council

Last published check: 3 Oct 2026, 10:39. Check the council record for more recent changes.

Application location

Garage site adjacent to 45, Bluebell Avenue, Peterborough, PE1 3XQ

This record has no verified map location.

Application summary

Status
Determined
Application type
Planning Application (Full)
Received
7 Apr 2026
Validated
30 Apr 2026
Determination deadline
24 Jun 2026
Local authority
Peterborough City Council

Application overview

Demolition of existing garages and replace with permeable block paving parking spaces, enclosed with new fencing to boundaries with neighbouring homes

Proposal details

Reference
26/002197/FUL
Alternative references
PP-14788560
Development type
Minor Other (includes telephone kiosks)
Ward
North
UPRN
100090178586

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 18 of 18

DocumentPublishedAction
Application FormDCAPFORM7 Apr 2026View
Site Location Plan - CKH-GP-BBA-01DCPLANS7 Apr 2026View
Existing Site Plan - CKH-GP-BBA-02DCPLANS7 Apr 2026View
Existing Garage Elevations - CKH-GP-BBA-03DCPLANS7 Apr 2026View
Block Plan - CKH-GP-BBA-05DCPLANS7 Apr 2026View
Proposed Elevations - CKH-GP-BBA-06DCPLANS7 Apr 2026View
Proposed Site Plan - CKHGPBBA04 Rev1DCPLANS30 Apr 2026View
Design and Access StatementDCSUPDOC30 Apr 2026View
45 Bluebell AveDCREPP28 May 2026View
Comment - 47 Bluebell AvenueDCREPP28 May 2026View
Comment - Cambs PoliceDCCONWEB10 Jun 2026View
Comment - DrainageDCCONWEB11 Jun 2026View
LHA - CommentsDCCONWEB29 Jun 2026View
Flood Risk AssessmentDCSUPDOC23 Jul 2026View
LLFA - CommentsDCCONWEB3 Aug 2026View
79246_Decision_Notice_-_PERMIT.pdfDCDEC4 Sept 2026View
case officer reportDCCORPTP4 Sept 2026View
PCC Lead Local Flood Authority response- 4th Sept 2026DCCONWEB4 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Dispatch date

    Published milestoneCouncil source
  9. Decision date

    Published milestoneCouncil source
  10. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permitted
79246_Decision_Notice_-_PERMIT.pdf
Planning conditions
  1. Works to which this consent relates shall be begun before the expiration of five years from the date of this consent.
  2. The development hereby permitted shall be carried out in accordance with the following approved plans and documents: CKH-GP-BBA-01 - Site Location Plan CKH-GP-BBA-02 - Existing Site Plan CKH-GP-BBA-03 - Existing Garage Elevations CKH-GP-BBA-04 Rev 1 - Proposed Site Plan CKH-GP-BBA-05 - Block Plan CKH-GP-BBA-06 - Proposed Elevations Reason: For the avoidance of doubt and in the interest of proper planning.
  3. No development other than demolition shall take place unless and until the details a detailed surface water drainage scheme for the site have been submitted and approved in writing by the Local Planning Authority. The scheme should include but not limited to: - Infiltration testing in accordance with BRE 365; including the raw results of the testing and with a report demonstrating whether infiltration is feasible on site - Where infiltration drainage is proposed, all infiltration storage devices shall be designed to ensure a minimum clearance of 1 metre between the base of the device and the seasonally high groundwater level. - If infiltration is not viable, a revised drainage strategy will be required, including but not limited to; detailed design, pre and post discharge rates, CCTV survey of the existing piped system to where outfalls, full hydraulic calculations and exceedance flow plan. The development shall be carried out in accordance with the approved details and thereafter maintained as such. Reason: To ensure that a sustainable drainage strategy is informed by site-specific ground conditions, to promote the use of infiltration in accordance with the drainage hierarchy, to prevent the increased risk of flooding and to improve and protect water quality, in accordance with policy LP32 of the Peterborough Local Plan 2019 and Chapter 18 of the National Planning Policy Framework 2026.
  4. No development other than demolition shall take place unless and until details of a Parking Management Plan have been submitted to and approved in writing by the Local Planning Authority. The Parking Management Plan shall include details of how the parking area will be managed, controlled and maintained, including any allocation, permit system, access arrangements or other measures necessary to prevent unrestricted use of the parking area. The parking area shall thereafter be operated in full accordance with the approved Parking Management Plan unless otherwise agreed in writing by the Local Planning Authority. Reason: In the interests of highway safety and to ensure the parking area operates in a manner that does not result in unacceptable intensification of use having regard to the constrained nature of the site access, in accordance with Policy LP13 of the Peterborough Local Plan (2019) and Chapter 15 of the National Planning Policy Framework (2026).
  5. No development other than demolition shall take place unless and until the details of a scheme for the external lighting of the site shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall include details of the location, design, height, lux levels and operation of all lighting, together with measures to minimise light spill onto neighbouring residential properties. The development shall be carried out in accordance with the approved details and implemented prior to the commencement of use. Reason: In the interests of community safety, crime prevention, visual amenity and residential amenity, in accordance with Policies LP16 and LP17 of the Peterborough Local Plan (2019) and Chapters 14, 16 and 17 of the National Planning Policy Framework (2026).
  6. Prior to the first use of the development hereby approved a maintenance plan detailing the maintenance arrangements shall be submitted and agreed in writing with the Local Planning Authority. The plan shall include who is responsible for different elements of the surface water drainage system and the maintenance activities/frequencies. All development must be carried out in accordance with the approved documents. Reason: To ensure appropriate maintenance arrangements are put in place to enable the surface water drainage system to function as intended to ensure mitigation against flood risk, in accordance with Policy LP32 of the Peterborough Local Plan 2019 and Chapter 18 of the National Planning Policy Framework 2026.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.