Council planning record

Part discharge of conditions C9(a) (written scheme of investigation) and C11 (Schedule of internal works) to listed building consent 24/01307/LBC

Northborough Manor Lincoln Road Northborough Peterborough PE6 9BJ

DeterminedReference: 26/00216/DISCHGPeterborough City Council

Last published check: 29 Sept 2026, 14:33. Check the council record for more recent changes.

Application location

Northborough Manor Lincoln Road Northborough Peterborough PE6 9BJ

This record has no verified map location.

Application summary

Status
Determined
Application type
Compliance with Planning Condition(s)
Received
17 Feb 2026
Validated
17 Feb 2026
Determination deadline
13 Apr 2026
Local authority
Peterborough City Council

Application overview

Part discharge of conditions C9(a) (written scheme of investigation) and C11 (Schedule of internal works) to listed building consent 24/01307/LBC

Proposal details

Reference
26/00216/DISCHG
Alternative references
PP-14711471
Development type
Discharge of Condition(s)
Ward
Glinton & Castor
Parish
Northborough CP
Agent
Mark Hoare
UPRN
100091206903

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 11 of 11

DocumentPublishedAction
Roof and Ground Floor Details as Proposed - 194. PL15 (24-10-04)DCPLANS17 Feb 2026View
Previous/Parent decision notice: - Parent decision notice (Ref: 24/01307/LBC)DCPRDEC20 Dec 2024View
Great Hall Roof Sections - 194. PL14 E (24-10-04)DCPLANS17 Feb 2026View
Cover LetterDCSUPDOC17 Feb 2026View
GH Roof Plan - 194. PL13 E (24-10-08)DCPLANS17 Feb 2026View
Application FormDCAPFORM17 Feb 2026View
Northborough Manor Project DesignDCSUPDOC17 Feb 2026View
Northborough Great Hall Floor Disposal and Retention Strategy, Plans 1DCPLANS30 Apr 2026View
Northborough Great Hall Floor Disposal and Retention StrategyDCPLANS30 Apr 2026View
Northborough Great Hall Floor Disposal and Retention Strategy, Plans 2DCPLANS30 Apr 2026View
63103_Decision_Notice_-_DETERMINED_DISCHG.pdfDCDEC1 May 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Registration date

    Published milestoneCouncil source
  3. Valid date

    Published milestoneCouncil source
  4. Press notice start date

    Published milestoneCouncil source
  5. Site notice date

    Published milestoneCouncil source
  6. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Dispatch date

    Published milestoneCouncil source
  10. Decision date

    Published milestoneCouncil source
  11. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Determined
Previous/Parent decision notice: - Parent decision notice (Ref: 24/01307/LBC) 63103_Decision_Notice_-_DETERMINED_DISCHG.pdf
Planning conditions
  1. Condition 9(a) , Partial Discharge (HBR and Disposal Strategy) The condition states: - (a) No works shall take place on site to disturb the floor coverings at ground floor, until a Written Scheme of Investigation demonstrating how the applicant shall record the floor coverings at ground floor to Historic England Level 3 standards, shall be submitted to and approved in writing by the Local Planning Authority. This report should include a disposal/retention strategy for the fabric consented to be removed/reinstated. (b) Subsequent to the discharge of part (a) the applicant shall abide by the WSI and the resulting building recording shall be submitted to and approved in writing by the Local Planning Authority within 6 months of work commencing. Within 3 months of the Historic Building Recording being approved by the LPA, it shall be submitted to the relevant Record Office. Reason: To record and advance understanding of the significance of the element of the heritage assets to be lost, in accordance with NPPF (2023) Paragraph 220, and section 66(1) and/or 72((1) of the Planning (Listed Buildings and Conservation Areas) Act 1990 (as amended). Approved documents: Northborough Great Hall Floor Disposal and Retention Strategy, Plans 1 Northborough Great Hall Floor Disposal and Retention Strategy, Plans 2 Northborough Great Hall Floor Disposal and Retention Strategy Northborough Manor Project Design Assessment The submitted WSI is considered to align with Historic England's, Building Recording Guidance and provides a positive and acceptable approach to the recording of the building. With regard the retention strategy, this is in alignment with the approach of the works and retain the significant fabric. Conclusion The details submitted relating to condition 9(a) are acceptable to the Local Planning Authority and comply with the submission requirements of the respective part of the condition. Condition 9(a) is hereby partially discharged, subject to development being undertaken in strict accordance with the approved details.
  2. Condition 11, Partial Discharge (Schedule of Works) The condition states: - Prior to the commencement of works to the relevant room a schedule of internal works on a room-by-room basis, indicating repairs or new works and finish treatments to ceilings, walls, floors, joinery and staircases, shall be submitted to and agreed in writing by the Local Planning Authority. All works shall be carried out in accordance with the approved details. Reason: In order to preserve the special architectural and historic character of the Listed Building; in accordance with section 66(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990 (as amended), Policy LP19 of the Peterborough Local Plan (2019) and Chapter 16 of the National Planning Policy Framework (2023). Approved documents: GH Roof Plan - 194. PL13 E (24-10-08) Roof and Ground Floor Details as Proposed - 194. PL15 (24-10-04) Great Hall Roof Sections - 194. PL14 E (24-10-04) Assessment The proposed schedule of works with regard the floor and roof are considered to be an appropriate conservation approach which retains the significance to the building. As such these elements are considered acceptable. The condition however covers various aspects of work of which the two elements herby submitted only two aspects. As such the remainder of the works is still required to be discharged. It is noted that Condition 7 has not been discharged however there is nothing with the submitted proposals which would require it to be discharged at this time. Conclusion The details submitted relating to condition 11 are acceptable to the Local Planning Authority and comply with the submission requirements of the respective part of the condition. Condition 11 is hereby partially discharged, subject to development being undertaken in strict accordance with the approved details.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.