Condition 20 – Waste Collection Strategy - Discharged Prior to the first occupation of each unit and thereafter prior to the occupation of any unit by a new or different occupier a Waste Collection Strategy must be submitted to and approved in writing by the Local Planning Authority. The strategy shall demonstrate how waste collection operations will operate on the development and shall include but not be limited to: (i) Heads of Terms of a Commercial Waste Collection contract to be entered into by the developer or their agent, or confirmation that the Local Authority will be responsible for waste collections; (ii) Frequency of waste collections, such frequency to be not less than twice-weekly (iii) Management of refuse bins prior to, during and following each collection (iv) Onsite recycling facilities to be provided in association with the retail store at Unit 4 (v) Arrangements for the storage and collection of commercial waste from the commercial units The development shall thereafter be undertaken and retained in accordance with the approved Waste Collection Strategy pertaining to each Unit. Reason: In accordance with the requirements set out at Appendix E of the Adopted Peterborough Local Plan (2019). Plans and documents submitted in support of the discharge of C20: - Delivery, Servicing and Waste Management Plan, dated March 2026, Rev 1 Assessment: Having reviewed the submitted report, the proposed arrangement of waste being taken away by the vehicles delivering goods with the waste being stored inside the building between daily deliveries is acceptable. As such, the detail submitted is deemed acceptable for the Local Planning Authority to discharge the condition. Conclusion: The details submitted relating to condition 20 are deemed acceptable to the Local Planning Authority and comply with the submission requirements of the condition. Condition 20 is hereby discharged, subject to implementation in accordance with the approved details.
Condition 27 – Delivery, Servicing and Waste Management and Routing Plan NOT DISCHARGED No building hereby approved shall be brought into use until a Delivery, Servicing and Waste Management and Routing Plan for the lifetime of that building has been submitted to and approved in writing by the Local Planning Authority. The Routing Plan shall detail measures to ensure that all service, delivery and other goods vehicle routing shall solely be via the A15 London Road / The Serpentine Roundabout and to prevent any service, delivery or other goods vehicles entering or leaving the site via Hampton Avenue. The approved Delivery, Servicing and Waste Management and Routing Plan shall be implemented in perpetuity. Reason 1: In the interests of the safety and convenience of users of the local highway network and in order to avoid any severe residual impacts on the highway network, in accordance with Policy LP13 of the Adopted Peterborough Local Plan (2019) and paragraph 115 of the National Planning Policy Framework (December 2023). Reason 2: In order to safeguard the amenities of nearby residential occupiers, in accordance with Policy LP17 of the Adopted Peterborough Local Plan (2019). Plans and documents submitted in support of the discharge of C20: - Delivery, Servicing and Waste Management Plan, dated March 2026, Rev 1 Assessment: The submitted report does not meet the requirements of the condition as no routing plan has been provided. The method of preventing service, delivery or other goods vehicles using Hampton Avenue requires clarification. Conclusion: The details submitted relating to condition 27 are not acceptable to the Local Planning Authority for the reasons given above and a routing plan is required. Condition 27 is hereby NOT DISCHARGED.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.