Demolition of existing inbound gatehouse and erection of new inbound gatehouse, minor external alterations to existing B8 warehouse plus associated ancillary works
Demolition of existing inbound gatehouse and erection of new inbound gatehouse, minor external alterations to existing B8 warehouse plus associated ancillary works
Reference
26/002104/FUL
Alternative references
PP-14709172
Development type
Minor Other (includes telephone kiosks)
Ward
Hargate & Hempsted
Agent
Clements
UPRN
MAN000000000817892
Sign in to view all collected council fields and recorded changes.
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building and as outlined in drawing number(s) ‘EUK1 - ASA - WH - ZZ - DR - ARC - 0005 _ (S2 - P01)’ and (EUK1 - ASA - WH - ZZ - DR - ARC - 0009 _ (S2 - P01). Reason: For the Local Planning Authority to ensure a satisfactory external appearance, in accordance with Policy LP16 of the Peterborough Local Plan (2019) and Chapter 12 of the National Planning Policy Framework (2024).
The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: In accordance with Section 91 of the Town and Country Planning Act 1990 (as amended).
The development hereby permitted shall be carried out in accordance with the following approved plans: - Location Plan (Drawing Number: UK1 - ASA - SW - FD - DR - ARC - 0001 _ (S2 - P02). - Proposed Site Layout (Drawing Number: EUK1 - ASA - SW - FD - DR - ARC - 0003 _ (S2 - P03). - Proposed Elevations (Drawing Number: EUK1 - ASA - WH - ZZ - DR - ARC - 0005 _ (S2 - P01). - Proposed Roof Plan (Drawing Number: EUK1 - ASA - WH - RF - DR - ARC - 0007 _ (S2 -P02). - Proposed Inbound Gatehouse Details (Drawing Number: EUK1 - ASA - WH - ZZ - DR - ARC - 0009 _ (S2 - P01). Reason: For the avoidance of doubt and in the interest of proper planning
During development, temporary facilities shall be provided clear of the public highway for materials storage and for the parking/turning/loading/unloading of all vehicles visiting the site during the period of construction. Reason: In the interest of highway safety, in accordance with Policy LP13 of the Peterborough Local Plan (2019) and Chapter 9 of the National Planning Policy Framework (2024).
Subject to the imposition of the attached conditions, the proposal is acceptable having been assessed in the light of all material considerations, including weighing against relevant policies of the development plan.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.