ApprovedCouncil status: Determined

Proposed conservatory to rear of property

69 Chapel Street Stanground Peterborough PE2 8JE

Peterborough City CouncilReference 26/002052/HHFULHouseholder (Full)

Last published check: 28 Sept 2026, 20:36. Check the council record for more recent changes.

Status and dates

Last published check: 28 Sept 2026, 20:36 (UK)

  1. DoneReceived6 Mar 2026
  2. DoneValidated15 Apr 2026
  3. ClosedConsultationEnded 10 May 2026
  4. Date set by councilTarget decision date9 Jun 2026
  5. DecidedPermitted9 Jun 2026

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (10)
  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Dispatch date

    Published milestoneCouncil source
  8. Decision date

    Published milestoneCouncil source
  9. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Householder (Full)
Ward
Fletton & Stanground
Development type
Householder Works / Extension
Documents
9 published

Proposal

Proposed conservatory to rear of property

Reference
26/002052/HHFUL
Alternative references
PP-14751624
Development type
Householder Works / Extension
Ward
Fletton & Stanground
Agent
Thompson
UPRN
100090182761

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Application FormDCAPFORM6 Mar 2026View
  • Location PlanDCPLANS6 Mar 2026View
  • Proposed Block Plan Rev ADCPLANS23 Mar 2026View
  • Existing Block PlanDCPLANS23 Mar 2026View
  • Existing Plans Rev ADCPLANS23 Mar 2026View
  • Proposed Plans Rev ADCPLANS23 Mar 2026View
  • Biodiversity ChecklistDCSUPDOC16 Apr 2026View
  • 67863_Decision_Notice_-_PERMIT.pdfDCDEC9 Jun 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permitted
67863_Decision_Notice_-_PERMIT.pdf
Planning conditions
  1. A completed biodiversity checklist is required as part of this application. This is available from our website at www.peterborough.gov.uk/planningoss
  2. An existing block plan is required with this application. The plan should be at an identified scale (ideally 1:200 or 1:500) show the direction of North and include a scale bar and or metric measurements. In addition to this the plan should show all buildings, roads and footpaths on land adjoining the site including access arrangements, all public rights of way crossing or adjoining the site (footpath, bridleway, restricted byway or byway open to all traffic, the position of all trees on the site, and those on adjacent land, the extent and type of any hard surfacing with any existing car parking and turning arrangements and any boundary treatment including walls or fencing.
  3. Unfortunately, we are unable to accept partial floor plans. Drawings must show the complete building, partial drawings are not acceptable. Please provide full existing and proposed floor plans
  4. The proposal as submitted is in accordance with local and national planning policy and has been approved without amendment, in accordance with Paragraph 39 of the National Planning Policy Framework (2024). Therefore, there was no need for the local authority to work with the applicant to seek solutions to problems arising in relation to dealing with the application.
  5. The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: In accordance with Section 91 of the Town and Country Planning Act 1990 (as amended).
  6. The development hereby permitted shall be carried out in accordance with the following approved plans: - Location Plan - Proposed Block Plan Rev A - Proposed Plans Rev A Reason: For the avoidance of doubt and in the interest of proper planning
  7. The materials to be used in the construction of the external surfaces of the development hereby permitted shall be as per approved plans. Reason: For the Local Planning Authority to ensure a satisfactory external appearance, in accordance with Policy LP16 of the Peterborough Local Plan (2019) and Chapter 12 of the National Planning Policy Framework (2024).
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.