Discharge of condition C4 (Arboricultural Impact Assessment, Arboricultural Method Statement and Tree Protection Plan) pursuant to planning permission 25/01448/HHFUL
5 Ladds Lane Maxey Peterborough PE6 9HD
DeterminedReference: 26/002033/DISCHGPeterborough City Council
Last published check: 2 Oct 2026, 11:00. Check the council record for more recent changes.
Application location
5 Ladds Lane Maxey Peterborough PE6 9HD
This record has no verified map location.
Application summary
Status
Determined
Application type
Compliance with Planning Condition(s)
Received
4 Mar 2026
Validated
Not published
Determination deadline
28 Apr 2026
Local authority
Peterborough City Council
Application overview
Discharge of condition C4 (Arboricultural Impact Assessment, Arboricultural Method Statement and Tree Protection Plan) pursuant to planning permission 25/01448/HHFUL
Proposal details
Reference
26/002033/DISCHG
Alternative references
PP-14751158
Development type
Discharge of Condition(s)
Ward
Glinton & Castor
Parish
Maxey CP
Agent
Chiva
UPRN
10008051898
Sign in to view all collected council fields and recorded changes.
Discharge of condition C4 (Arboricultural Impact Assessment, Arboricultural Method Statement and Tree Protection Plan) pursuant to planning permission 25/01448/HHFUL No development or other operations shall commence on site in connection with the development hereby approved, (including any tree felling, tree pruning, demolition works, soil moving, temporary access construction and or widening, or any operations involving the use of motorised vehicles or construction machinery) until a detailed Arboricultural Impact Assessment, including an Arboricultural Method Statement and Tree Protection Plan, has been submitted to and approved in writing by the Local Planning Authority. No development or other operations shall take place except in complete accordance with the approved documentation. Such statements shall include full detail of the following: - Implementation, supervision and monitoring of the approved Tree Protection Scheme - Implementation, supervision and monitoring of the approved Tree work Specification - Implementation, supervision and monitoring of all approved construction works within any area designated as being fenced off or otherwise protected in the approved Tree Protection Scheme - Timing and phasing of Arboricultural works in relation to the approved development Reason: In order to protect and safeguard the amenities of the area, in accordance with Policies LP16, 19 and LP29 of the Peterborough Local Plan (2019) and Sections 15 and 16 of the National Planning Policy Framework (2024)(2025 as amended). This is a pre-commencement condition because the approved construction specification must be in place and adequate prior to development commencing to ensure the trees are protected. Approved Documents and Details: - Block Plan Rev A - BS5837:2012 -Trees in relation to design, demolition and construction. Arboricultural matters in relation to trees at 5 Ladds Lane, Maxey. Assessment: The Tree Officer was consulted on this application and raised no objection. The consultee recommended the discharge of condition 4 and Officers consider that the information within the submitted Arboricultural Impact Assessment and Block Plan addresses the requirements of the condition. It is considered that the proposal would ensure the protection of Trees within the conservation area as well as the visual amenity of the area. The details are acceptable in line with LP16, LP19 and LP29 of the Peterborough Local Plan (2019) and Section 15 of the National Planning Policy Framework (2024)(2025 as amended) in relation the scope of condition 4. Conclusion: Subject to satisfactory implementation on site this condition is hereby discharged.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.