Condition 7: No development above DPC level shall take place until provision has been made for fire hydrants in accordance with a scheme to be submitted to and approved in writing by the Local Planning Authority. The scheme shall thereafter be implemented in accordance with the approved details. Prior to the first occupation of any dwelling to be served by the scheme, written confirmation shall be submitted to and approved in writing by the Local Planning Authority that the scheme has been implemented for the occupations it relates to and is certified as being ready for use. Reason: In the interest of community safety and to ensure that adequate supplies are available for firefighting, in accordance with Policy LP16 of the Peterborough Local Plan (2019) and the National Planning Policy Framework (2024). Plans and documents submitted in support of the discharge of C7: - Entire Site Plan - WN0022854-1 Rev53-0 Assessment: Cambridgeshire Fire & Rescue Service can confirm that statutory consultation has taken place with Anglian Water and that they have been advised on the quantity, serial numbers and locations of the fire hydrants necessary to serve the development. Therefore, the application has satisfied the requirement of the conidition to supply details of the scheme, once the apparatus has been installed and is made ready for operational use then the condition can be fully discharged. Conclusion: The details submitted relating to condition 7 for the written scheme are deemed acceptable to the Local Planning Authority and comply with the submission requirements of the condition. Condition 7 is hereby partially discharged, subject to implementation in accordance with the approved details.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.