The proposal as submitted was not in accordance with local and national planning policy. The local planning authority have worked with the applicant in a positive and proactive manner based on seeking solutions to problems arising in relation to dealing with the planning application. Amendments were discussed and agreed with the applicant to bring the proposal into compliance with policy, and the application can therefore be approved in accordance with Paragraph 38 of the National Planning Policy Framework (2024).
The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: In accordance with Section 91 of the Town and Country Planning Act 1990 (as amended).
The materials to be used in the construction of the external surfaces of the proposed two-storey side extension and single storey rear extension hereby permitted shall match those used for the existing building, with fibreglass flat roof for the part single storey rear extension. Reason: For the Local Planning Authority to ensure a satisfactory external appearance, in accordance with accordance with Policy LP16 of the Peterborough Local Plan (2019) and provisions of NPPF (2024).
The development hereby permitted shall be carried out in accordance with the following plans: - Location, Existing and Proposed Block Plan (Drawing received: 001) -Proposed Elevation Plan (Drawing Number: 004 Rev B) -Proposed Floor Plan (Drawing Number: 003) Reason: For the avoidance of doubt and proper planning.
Before the development hereby permitted is first occupied, the proposed window for the bathroom on the first floor and shower room on the ground floor shall be fitted with obscure glazing to a minimum of Pilkington Level 3. The obscure glazing shall be continuous and shall not incorporate any clear glazing features. The window shall subsequently be retained as such in perpetuity. Reason: In order to protect the amenities of neighbouring occupants, in accordance with Policy LP17 of the Peterborough Local Plan (2019) and paragraph 135(f) of the National Planning Policy Framework 2024.
The development shall be carried out in accordance with the Tree Protection details on drawing ‘Location, Existing and Proposed Block Plan, Dwg No. 001, Rev B’ with all fencing implemented before any equipment, machinery or materials are brought on to the site for the purposes of the development, and shall be maintained until all equipment, machinery and surplus materials have been removed from the site. Nothing shall be stored or placed in any area fenced in accordance with this condition and the ground levels within those areas shall not be altered, nor shall any excavation be made, without the written consent of the Local Planning Authority. In this condition ‘retained tree’ means an existing tree which is to be retained in accordance with the approved plans and particulars. No retained tree shall be cut down, uprooted or destroyed, nor shall any retained tree be topped or lopped other than in accordance with the approved plans and particulars, without the written approval of the Local Planning Authority. Any topping or lopping approved shall be carried out in accordance with British Standard 3998 (Tree Work); If any retained tree is removed, uprooted or destroyed or dies, another tree shall be planted at the same place and that tree shall be of such size and species, and shall be planted at such time, as may be specified in writing by the Local Planning Authority; Reason: In order to protect and safeguard the amenities of the area, in accordance with Policies LP16 and LP29 of the Peterborough Local Plan (2019) and paragraph 136 of the National Planning Policy Framework 2024. This condition is pre-commencement as protection measures must be implemented before works commence to ensure the protection of trees.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.