Condition 25 No development shall take place unless and until detailed technical drawings for works to Hampton Avenue required to facilitate the development, and any associated statutory undertaker's diversions, have first been submitted to and approved in writing by the Local Planning Authority. The submitted detailed technical drawings shall include but not be limited to: (i) Design compliance of the new accesses in accordance with LTN 1/20 to ensure adequate provision for cyclists (including visibility splays); (ii) Vehicle-to-vehicle visibility splays (in accordance with MfS2) which must be calculated using the 85%ile speeds from the speed survey, and the formula including HGV/Buses as these make up at least 5% of the traffic along the route. The identified visibility splays must be permanently kept free of any obstructions over 600mm in height above ground level; (iii) Full details of the replacement of any existing car parking bays on Hampton Avenue proposed to be removed; (iv) Full details of any affected street furniture and landscaping; (v) Full details of the relocation of existing pedestrian crossing points; (vi) A reduced bellmouth size for the retail car park access to the food store approved at Unit 4 (vii) Details of the removal of redundant accesses, the method of their reinstatement, and a timetable for the completion of reinstatement works. None of the buildings hereby approved shall be brought into use until the approved scheme has been implemented. Reason: In the interests of the safety and convenience of users of the local highway network and in order to avoid any severe residual impacts on the highway network, in accordance with Policy LP13 of the Adopted Peterborough Local Plan (2019) and paragraph 115 of the National Planning Policy Framework (December 2023). Plans and documents submitted in support of the discharge of C25: Cover Letter Condition 25 Revised Submission Condition 25 Memo 00660 HEX XX XX DR C 0001 P06 Hampton Avenue Topographical Survey 600660 HEX XX XX DR C 0010 P09 Plan 1 - Location Plan 600660 HEX XX XX DR C 0020 P07 Hampton Avenue Drawing Key Plan 600660 HEX XX XX DR C 0050 P07 Hampton Avenue Plan 2 Extent of works 600660 HEX XX XX DR C 0100 P09 Hampton Avenue Engineering Layout 600660 HEX XX XX DR C 0110 P08 Hampton Avenue Tracking Assessment 600660 HEX XX XX DR C 0119 P02 LIDL Access Tracking Assessment 6.5m access 600660 HEX XX XX DR C 0200 P08 Hampton Avenue Site Clearance 600660 HEX XX XX DR C 0500 P04 Hampton Avenue Drainage Layout 600660 HEX XX XX DR C 0510 P04 Existing drainage and Catchment Plan 600660 HEX XX XX DR C 0600 P08 Hampton Avenue Proposed Levels Layout 600660 HEX XX XX DR C 0660 P04 Hampton Avenue Existing carriageway longsection Sheet 1 600660 HEX XX XX DR C 0661 P03 Hampton Avenue Existing carriageway longsection Sheet 2 600660 HEX XX XX DR C 0700 P08 Hampton Avenue External Works Layout 600660 HEX XX XX DR C 0720 P07 External Construction Details 600660 HEX XX XX DR C 1100 P08 Hampton Avenue Kerbing Layout 600660 HEX XX XX DR C 1200 P02 Hampton Avenue Signage and Road markings Layout 600660 HEX XX XX DR C 1300 P10 Hampton Avenue Utility layout 600660 HEX XX XX DR C 1320 P04 Hampton Avenue Utility section Assessment: Having reviewed the submitted plan, the Officer agrees with the Local Highway Authority that the proposed details including the 6.5m wide access with 7m kerb radii are acceptable and are in line with the Council's Local Plan policy LP13. As such, the detail submitted is deemed acceptable for the Local Planning Authority to discharge the condition. Conclusion: The details submitted relating to condition 25 are deemed acceptable to the Local Planning Authority and comply with the submission requirements of the condition. Condition 25 is hereby discharged, subject to implementation in accordance with the approved details.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.