Council planning record

Non-material amendment (slab levels) to planning permission 23/00423/FUL

Plots 7 And 8 Fletton Quays Peterborough PE2 8TZ

DeterminedReference: 26/00126/NONMATPeterborough City Council

Last published check: 3 Oct 2026, 18:53. Check the council record for more recent changes.

Application location

Plots 7 And 8 Fletton Quays Peterborough PE2 8TZ

This record has no verified map location.

Application summary

Status
Determined
Application type
Non-Material Amendment
Received
29 Jan 2026
Validated
Not published
Determination deadline
26 Feb 2026
Local authority
Peterborough City Council

Application overview

Non-material amendment (slab levels) to planning permission 23/00423/FUL

Proposal details

Reference
26/00126/NONMAT
Alternative references
PP-14663503
Development type
Non Material Amendments
Ward
Fletton & Stanground
Parish
Peterborough
UPRN
100091524438

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 5 of 5

DocumentPublishedAction
Previous/Parent decision noticeDCPRDEC29 Jan 2026View
Plans: 2628 AP0003 P11 - Location Plan and Site Masterplan as ProposedDCPLANS29 Jan 2026View
DecisionDCDEC17 Feb 2026View
Application Form: ApplicationDCAPFORM29 Jan 2026View
Application Supporting Document: C26 Non Material AmendmentDCSUPDOC29 Jan 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Registration date

    Published milestoneCouncil source
  3. Dispatch date

    Published milestoneCouncil source
  4. Decision date

    Published milestoneCouncil source
  5. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Application date

    Published milestoneCouncil source
  9. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Determined
Previous/Parent decision notice Decision
Planning conditions
  1. Under Section 96A of the Town and Country Planning Act 1990 (as amended), the alterations to Condition 26 are acceptable as non-material amendments to the development approved under planning reference 23/00423/FUL. The amendments vary the original C26 which limited the development above slab level for Buildings 1 and 2 until the redevelopment of the Mill is not complete. The Applicant has justified the variation of this condition to allow for an efficient building process, whilst also ensuring that key building interventions (steels, roof, window/doors etc) are complete on the Mill alongside the development of the new buildings to ensure that the Mill is redeveloped in a timely manner without adversely impacting the viability of the proposed development. Accordingly, Condition 26 of planning permission reference 23/00423/FUL is therefore updated to read as below. This notice shall be appended to planning permission 23/00423/FUL and all other conditions attached thereto remain in place and in force.
  2. The proposed development shall be carried out in strict accordance with the following phasing: - The development of Building 2 shall not continue above Level 00 FFL until the internal steel structure has been installed inside the Mill - The development of Building 1 shall not continue beyond Level 00 FFL until the Mill has the new roof structure complete as per the approved plans - The development of Building 2 shall not achieve completion until the Mill is watertight with completed roof and all windows installed/reinstated as per the approved plans - The development of Building 1 shall not achieve completion prior to the full completion of all required work on the Mill and the Mill achieves completion For the purposes of the above 'completion' shall be defined as a Building Regulations Completion Certificate being issued. The Building numbers are set out in drawing 'Location Plan and Site Masterplan as Proposed' AP0003 Revision P11. Reason: In order to ensure that the locally listed Mill building is renovated to a standard where it can be brought back into use, in the interests of enhancing a valuable local heritage asset in accordance with Policy LP19 of the Peterborough Local Plan (2019).
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.