Council planning record

Proposed installation of fencing, security gates, office/reception building, canteen/mess room, storage unit and fork lift truck shelter.

Unit 3 Whitehead Road Fengate Peterborough PE1 5XA

DeterminedReference: 26/00042/FULPeterborough City Council

Last published check: 1 Oct 2026, 23:06. Check the council record for more recent changes.

Application location

Unit 3 Whitehead Road Fengate Peterborough PE1 5XA

This record has no verified map location.

Application summary

Status
Determined
Application type
Planning Application (Full)
Received
13 Jan 2026
Validated
Not published
Determination deadline
2 Jul 2026
Local authority
Peterborough City Council

Application overview

Proposed installation of fencing, security gates, office/reception building, canteen/mess room, storage unit and fork lift truck shelter.

Proposal details

Reference
26/00042/FUL
Alternative references
PP-14617639
Development type
Minor Other (includes telephone kiosks)
Ward
East
Parish
Peterborough
Agent
Miss Maureen Darrie
UPRN
10008064467

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 34 of 34

DocumentPublishedAction
Application Supporting Document: Planning Statement Unit 3 Fengate February 2026DCSUPDOC14 Feb 2026View
Application Supporting Document: Redacted - FRA_First Issue (003) - ACE_25056DCSUPDOC13 Jan 2026View
Plans: Elevations of Existing and Proposed Security Fencing and Gates_13022026_A1 - GPP-F-PETE-26-17DCPLANS14 Feb 2026View
Plans: Existing Block Plan - 13022026_A2 - GPP-F-PETE-26-12 v2DCPLANS16 Feb 2026View
Plans: Elevations of Existing Security Fencing and Gates_13022026_A1 - GPP-F-PETE-26-14DCPLANS16 Feb 2026View
Plans: Site Context Plan - REDUCED SIZE_05122025_A4 - GPP-F-PETE-25-01 v2DCPLANS16 Feb 2026View
Application Form: Redacted - Application FormDCAPFORM14 Feb 2026View
Plans: Proposed Floor and Elevation Plan - Office Unit_19122025 - GPP-F-PETE-25-07 v2DCPLANS13 Jan 2026View
Plans: Proposed Block Plan - 13022026_A2 - GPP-F-PETE-26-13DCPLANS16 Feb 2026View
Plans: Proposed Floor and Elevation Plan - Storage Unit_08122025 - GPP-F-PETE-25-10DCPLANS13 Jan 2026View
Plans: Elevations of Proposed Security Fencing and Gates_13022026_A1 - GPP-F-PETE-26-16DCPLANS16 Feb 2026View
Plans: Floor and Elevation Plan - Canteen_Meeting Room Unit_08122025 - GPP-F-PETE-25-08DCPLANS13 Jan 2026View
Plans: Elevations of Office Unit_19122025_A2 - GPP-F-PETE-25-07 v2DCPLANS16 Feb 2026View
Plans: Elevations of Fork Lift Truck Shelter_13022026_A3 - GPP-F-PETE-26-18DCPLANS16 Feb 2026View
Application Supporting Document: 25591 - Biodiveristy Net Gain Exemption StatementDCSUPDOC13 Jan 2026View
Plans: Site Location Plan - 04022026_A2 A - GPP-F-PETE-25-02 v2DCPLANS16 Feb 2026View
Biodiversity ChecklistDCSUPDOC24 Feb 2026View
Notice 1DCSUPDOC24 Feb 2026View
Pollution - CommentsDCCONWEB22 Apr 2026View
Proposed Security Fencing and Gates Elevation Plan - GPPFPETE2616 v2DCPLANS8 May 2026View
Proposed Block Plan - GPPFPETE2613 v2DCPLANS8 May 2026View
Pollution- 15/05/2025DCCONWEB15 May 2026View
Cambridgeshire Constabulary Police 15.05.2026DCCONWEB15 May 2026View
Flood Risk AssessmentDCSUPDOC3 Jun 2026View
Comment - DrainageDCCONWEB4 Jun 2026View
7.2m Panel Van Swept Path Analysis - GPP/F/PETE/2620DCPLANS30 Jun 2026View
5m Large Car Swept Path Analysis - GPP/F/PETE/2621DCPLANS30 Jun 2026View
Visibility Splays for Emerging Vehicles - GPP/F/PETE/2622DCPLANS30 Jun 2026View
12m Rigid Swept Path Analysis - GPP/F/PETE/2619DCPLANS30 Jun 2026View
Flood Risk Assessment and Drainage StrategyDCSUPDOC30 Jun 2026View
Lead Local Flood AuthorityDCCONWEB3 Jul 2026View
Local HighwaysDCCONWEB13 Jul 2026View
Case Officer ReportDCCORPTP20 Jul 2026View
DecisionDCDEC17 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Registration date

    Published milestoneCouncil source
  3. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Dispatch date

    Published milestoneCouncil source
  7. Decision date

    Published milestoneCouncil source
  8. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permitted
Decision
Planning conditions
  1. The proposal as submitted was not in accordance with local and national planning policy. The local planning authority have worked with the applicant in a positive and proactive manner based on seeking solutions to problems arising in relation to dealing with the planning application. Amendments were discussed and agreed with the applicant to bring the proposal into compliance with policy, and the application can therefore be approved in accordance with Paragraph 38 of the National Planning Policy Framework (2024).
  2. The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: In accordance with Section 91 of the Town and Country Planning Act 1990 (as amended).
  3. The external materials shall accord with the approved plans and comprise 868 Twin Mesh fencing with razor wire for the security enclosure, steel panels and cladding for the storage units and forklift shelter, and battleship grey steel panels with UPVC double-glazed tilt-and-turn windows for the canteen/meeting room. Reason: To ensure a satisfactory external appearance, in accordance with Policy LP16 of the Peterborough Local Plan (2019) and Chapter 12 of the NPPF (2024).
  4. The development shall be completed in accordance with the following approved plans: - Site Context Plan, dated: 25/09/2025 - Site Location Plan, ref: GPP/F/PETE/25/02 Rev 2 - Proposed Block Plan, ref: GPP/F/PETE/26/13 Rev 2 - Elevations of Proposed Security Fencing and Gates, ref: GPP/F/PETE/26/16 Rev 2 - Elevations of Office Unit, ref: GPP/F/PETE/25/07 Rev 2 - Elevations of Storage Unit, ref: GPP/F/PETE/25/10 Rev 1 - Elevations of Forklift Truck Shelter, ref: GPP/F/PETE/26/18 Rev 1 - Elevations of Canteen/Meeting Room, ref: GPP/F/PETE/25/08 Rev 1 Reason: To define the permission and for the avoidance of doubt.
  5. No external lighting shall be erected until, a "lighting design strategy for biodiversity" for all lighting across the site shall be submitted to and approved in writing by the local planning authority. The strategy shall: a) identify those areas/features on site that are particularly sensitive for ecological constraints that are likely to cause disturbance in or around their breeding sites and resting places or along important routes used to access key areas of their territory, for example, for foraging; and b) show how and where external lighting will be installed (through the provision of appropriate lighting contour plans and technical specifications) so that it can be clearly demonstrated that areas to be lit will not disturb or prevent the above species using their territory or having access to their breeding sites and resting places. c) provide a mitigation plan that details how the lighting will be controlled (times and dates the lighting is used, frequences and lux levels during those times, Etc.) to minimise the impact on the known existing bat and other nocturnal animal populations present within the area, or those that may be using the area as a commuting corridor. All external lighting shall be installed in accordance with the specifications and locations set out in the strategy, and these shall be maintained thereafter in accordance with the strategy. Under no circumstances should any other external lighting be installed without prior consent from the local planning authority. Reason: To ensure that the recommended mitigation and compensation is delivered with the scheme to protect biodiversity and Policy LP28 of the Peterborough Local Plan 2019 and Chapter 15 of the National Planning Policy Framework 2024.
  6. The development shall be carried out in accordance with the submitted Flood Risk Assessment and Drainage Strategy (Rev A, dated 23 June 2026, compiled by Abington Consulting Engineers) and the mitigation measures it details. The measures detailed in the report shall be retained and maintained thereafter throughout the lifetime of the development. Reason: To reduce the risk of flooding to the proposed development and future occupants. To prevent flooding by ensuring the satisfactory disposal of surface water from the site.
  7. Adequate space shall be provided within the site for vehicles and cycles to enter, turn and leave the site in forward gear and load and unload and park clear of the public highway. Reason: In the interest of highway safety, in accordance with Policy LP13 of the Peterborough Local Plan (2019) and Paragraph 116 of the National Planning Policy Framework 2024.
  8. Prior to the commencement of development details of the wheel cleaning equipment shall be submitted and agreed in writing with the Local Planning Authority. All vehicles leaving the site shall pass through the wheel cleaning equipment and enter the public highway free of debris. The wheel cleaning equipment shall be available at the start of construction and retained on site in full working order for the duration of the development. Reason: In the interest of highway safety, in accordance with Policy LP13 of the Peterborough Local Plan (2019) and Paragraph 116 of the National Planning Policy Framework 2024. This is a pre-commencement condition because the details to be approved are required to be put in place before development commences for the duration of the development.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.