C7b - Fire hydrants - outside plot 336 - Partial Discharge a) Notwithstanding the submitted information, no development above ground works shall take place until provision has been made for fire hydrants in accordance with a scheme to be submitted to and approved in writing by the Local Planning Authority. The scheme shall thereafter be implemented in accordance with the approved details. b) Prior to the first occupation of any dwelling (or building where appropriate) to be served by the scheme, written confirmation shall be submitted to and approved in writing by the Local Planning Authority that the scheme has been implemented in full and is certified as being ready for use. Reason: In order to ensure that sufficient resources are available for fire-fighting, in accordance with Policies LP16 and LP17 of the Peterborough Local Plan (2019). Documents submitted in support of the discharge of C7b: - Hydrant 311-336 Markup Plan - Fire Hydrant Location Plan- WN0023289-1-1 of 6 Rev28-2 Assessment: This application seeks approval for a further commissioned and operational fire hydrants at parcel R10 outside plot 336. Having reviewed the submitted plan and consultation with Cambs Fire, it is agreed that the proposed details are acceptable. Cambs fire has confirmed that the fire hydrant at Parcel R10 outside plot 336 has been commissioned. As such, the further discharge of the hydrant outside plot 336 is acceptable, to allow for the occupation of the dwellings to which this hydrant serve. Conclusion: The details submitted relating to condition 7b for hydrants outside plot 336 are deemed acceptable to the Local Planning Authority and the condition is partially discharged to allow for occupation of the units served. Full discharge will be given upon completion of this phase.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.